kD&(QQ f *** %

.p 9'

,e k

UNITED STATES I

[

NUCLEAR REGULATORY COMMISSION 1

7 j

WASHINGTON, D C.20555 1

f April 25, 1989

    • ae*

l l

1 Docket No. 50-461 l

'Mr. Dale 'L. Holtzscher Acting Manager - Licensing and Safety

.Clinton Power Station P.O. Box 678 Mail Cooe V920 Clinton,~ Illinois 61727

Dear Mr. Holtzscher:

SUBJECT:

RESPONSE TO NRC BULLETIN 88-04

?

On May 5, 1988, the NRC staff issued NRC Bulletin 88-04, " Potential Safety-Related Pump Loss." The bulletin requested the evaluation of all safety-related pumps for: 1) pump-to-pumpinteractionduringminiflow.nperation that could result in dead-heading of one or more of the pumps, and 2) the-adequacy of the minimum flow by) ass lines with respect to damage resulting i

from operation and testing in t1e minimum flow mode. The bulletin'also I

requested that within 60 days of receipt of the bulletin, licensees provide a>

'I written response that: (a) summarizes the problems and the systems affected,

)

(b) identifies the short-term and long-term modifications to plant operat'ing

]

procedure.s or haraware that have been or are being. implemented to ensure safe plant operations, (c) identifies an appropriate schedule for long-term resolution of this and/or other significant problems that are'identifica as a resultofthisbulletin,and(d)providesjustificationforcontinued i

operation particularly with regard to General Design Criterion 35 of Appendix A 1

toTitle10oftheCodeofFederalRegulations-(10CFRPart50)~," Emergency Core Cooling" and 10 CFR 50.46, " Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors." Additionally, the i

staff requested that within 30 days of completion of the long-term resolution actions, that licensees provide a written response describing the actions taken.

1 By letter dated July 12, 1988, you responded to Bulletin 88-04.

Your response provided the information requested in a,.b,_c, and d above. Your respcnse also described the long-term resolution actions and identified a o

ccmpletion date of December 9,1989 for those actions. This fulfills your requirement in responding to Bulletin 88-04.

V$

I 6905090276 890425

{DR ADOCK 05000461 PDC jl

';j

L1 1

Mr. Thomas J. Kovach ;

As discussed in Bulletin 88-04, you should document and maintain for at least l

2 years an evaluation of your actions in responding to the bulletin.

These records may be subject to future auditing.

~ Sincerely,

]

g325 X~W John B. Hickman, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects cc: See next page

.1 1

l I

i a

l L_.

1 April 25, 1989 j

1 l'

Mr. Thomas J. Kovach As discussed in Bulletin 88-04, you should document and maintain for at-least i

2 years an evaluation of your actions in responding to the bulletin. These records may be subject to future auditing.

Sincerely, 2

/

John B. Hickman, Project Manager 4

Project Directorate III-2

)

Division of Reactor Projects III, IV, V, and Special Projects cc: See next page j

l 1

i DISTRIBUTION Docket file..

JHickman NRC & Local PDRs OGC PDIII-2 r/f EJordan GHolahan BGrimes MVirgilio

'ACRS(10)

LLuther Plant file l

MW III-2:PM PDIII-2:LA PDHp2:Pb

/ '/

9 7 M3 JHickman:dmj LLuther/

DMFI er-4/# T/89 4/2 F/89 "

4/ 4,1 /89

= - - - - - - - - - - - - - - - - -

j 1

Mr. Dale L. Holtzscher Clinton Power Station

)

Illinois Power Company Unit 1

]

cc:

Mr. D. P. Hall Illinois Department Vice President of Nuclear Safety j

Clinton Power Station

' Division of Engineering P. O. Box 678 1035 Outer Park Drive, 5th Floor Clinton, Illinois, 61727 Springfield, Illinois 62704 Mr. R. D. Freeman Mr. Donald Schopfer Manager-Nuclear Station Engineering Dept.

Project Manager l

Clinton Power Station Sargent & Lundy Engineers P. O. Box 678 55 East Monroe Street Clinton, Illinois 61727 Chicago, Illinois 60603 i

i Sheldon Zabel, Esquire 1

1 Schiff, Hardin & Waite 7200 Sears Tower 233 Wacker Drive Chicago, Illinois 60606 Resident Inspector U. S. Nuclear Regulatory Commission l

RRf3, Box 229 A 1

Clinton Illinois 61727 Mr. L. Larson Project Manager General Electric Company i

175 Curtner Avenue, N/C 395 San Jose, California 95125 i

Regional Administrator, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Chairman of DeWitt County c/o County Clerk's Office 1

DeWitt County Courthouse l

Clinton, Illinois 61727 l

l 1

1

-