Forwards Enforcement Conference Rept 50-245/89-13 on 890621. Further Actions to Be Taken by NRC Re Apparent Violations & Programmatic Deficiencies Will Be Subj to Separate Correspondence
ML20246B935
Person / Time
Site: Millstone 
Issue date: 06/30/1989
From: Knapp M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20246B939 List:
References
NUDOCS 8907100182
Download: ML20246B935 (3)


See also: IR 05000245/1989013

Text

/W

-

L ' ;O

/

(15

r

c

.

.

JUN 3 01989

-Docket No. 50-245

License No. DPR-21

Northeast. Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Enforcement Conference Report No. 50-245/89-13

An Enforcement Conference was held at the NRC Region I office on June 21,

1989 with NRC and licensee representatives to discuss apparent violations and

programmatic deficiencies in the area of Control of Radioactive Material at

the Millstone Nuclear Generating Station. These violations and programmatic

deficiencies were discussed in NRC Inspection Report No. 50-245/89-13, dated

June 9,1989. A Notice of Significant Licensee Meeting issued June 12, 1989,

is attached as Enclosure 1.

Topics discussed during the meeting and the meeting attendees are listed in.

the attached Enforcement Conference Report, Enclosure 2. Your briefing agenda

and handout material are attached with the Enforcement Conference Report. The

two hour Enforcement Conference was held to give you the opportunity to refute

any discrepant inspection findings and discuss short and long-term corrective

actions for the apparent violations and programmatic deficiencies.

Further actions to be taken by the NRC. with respect to the apparent violations

and progran,matic deficiencies, will-be the subject cf aparate correspondence.

Your cooperation with us is appreciated.

a

Sincerely,

CHsinal Signed By:

Ronaki R Cefbtny

Malcalm R. Knapp, Director

Division af Radiation Safety

e.nd Safeguards

Enclosures:

1.

Notice of Significant Licensee Meeting No.89-092

2.

NRC Region I Enforcement Conference Report No. 50-245/89-13

g g*"

I

s*

.r.w

"aif!i;!!d RECORD C0FV"

i i

"

G907100102 890630

PDR

ADOCK 00000245

.

Q

PDC

- _ -

_ _ _ _ _ - - _ _ - _ _ _ _ - _ _ - _

_

w

, - , _ .

_

,

,

.

.,

,

,

.

.

.

i

.

4

.

.

IEE3

Northeast Nuclear Energy

2

Company

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

.'

D. B. Miller, Station Superintendent, Haddam Neck

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

d '" ';* ' ? ? *. } p:

.s n g ; n n. , pp

.

L U it 'i-> $b. i k$ h

$

_ _ _ _ _ . _ _ _ _ - _

_______

3;

A

.,3 :

<

.:

,

N 3 01983

. Northeast. Nuclear Energy

3-

Company

bec w/ encl:

Management Assistant, DRMA (w/o encl) y)

Region I. Docket P.Lom (with concurrences

DRP Section Chief

V

J. Shedlosky, SRI, Haddam Neck v

W. Raymond, SRI, Millstone 3

t._

M. Boyle, LPM, NRR v

R. Bores, DRSS t/

poC

s

A

RI:DRSS

kl

SS

RI:DRSS

Rb

SS

t

O'Connell

Pa'sciJk

Bellamy

Kna p

06/4/89-

06/49/89

06/A/89

06/

9-

i

l:

"0FF!OAl. RECORB COPY"

_

- - -

- - -- - ---- ---

-

_

_ _ - - - _ _ - _ -

..

---

ENCLOSURE 1

^

1

. , .

JUN 11189

'

i

U.S. NUCLEAR REGULATORY COMMISSION

No.89-092

REGION I'

NOTICE OF SIGNIFICANT LICENSEE MEETING

Licensee:

Northeast Nuclear Energy Company

Facility:

Millstone Unit 1

Docket Nos:

50-245

.

Time'and.Date:

1:00 p.m., June 21, 1989

Location:

DRSS Conference Room, Region I Office, King of Prussia, PA

Purpose:

Enforcement Conference to Discuss Shipment of a Contaminated

High Pressure Pump and Trailer from Millstone 1 to a Vendor's

Site in Morristown, New Jersey on May 11-12, 1989

NRC Attendees:

M. Knapp,' Director, Division of Radiation Safety and

Safeguards (DRSS)

E. McCabe, Chief, Reactor Projects Section 10, Division of

Reactor Projects (DRP)

R. Bellamy, Chief, Facilities Radiological Safety and-

Safeguards Branch, DRSS

W. Pasciak, Chief, Facilities Radiation Protection Section,

D".SS

P. O'Connell, Radiation Specialist, DRSS

J. Furia, Radiation Specialist, DRSS

D. Holody, Enforcement Specialist

Licensee Attendees: H. Hanes, Station Services Superintendent

1

J. Sullivan, Millstone Health Physics Superviso'r

1

S. Icace, Station Superintendent

(

F. . Sears, Vice President, Engineering

Note: This meeting. is not open to the public.

Attendance by NRC personnel at

l

this meeting should be made known by 4:00 p.m., June 20, 1989 via tele-

'

phone call to E. McCabe, Region I, at FTS 8-346-5231.