ML20246B257
| ML20246B257 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/27/1989 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cottle W SYSTEM ENERGY RESOURCES, INC. |
| Shared Package | |
| ML20246B259 | List: |
| References | |
| NUDOCS 8907070257 | |
| Download: ML20246B257 (2) | |
See also: IR 05000416/1989016
Text
.
L
'
'
.
..
[^
ava
-
-
n ,,,,
1
'
Docket No. 50-416
'
License No. NPF-29
System Energy Resources, Inc.
ATTN: Mr. W. T. Cottle
Vice President, Nuclear Operations
P.O. Box 469
Port Gibson, MS 39150
Gentlemen:
SUBJECT: NOTICE OF VICLATION
(NRC INSPECTION REPORT NO. 50-416/89-16)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
H. O. Christensen on May 20 through June 16, 1989.
The inspection included a
review of activities authorized for your Grand Gulf facility.
At the
conciusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the' inspection consisted of selective examinations of procedures
and representative records, interviews with - personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violatica, references to pertinent requirements, and
elements to be included in your response are described in the encle.ned Notice
.of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2,
Title 10, Code of Federal Regulations, a copy "F this letter and its enclosures
will be placed in the NRC Public Document Room.
,
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
OUGNAL SITMD IT
DAVID M. VERRELU
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
l
Enclosures:
(See page 2)
l
8907070257 890627
I\\
j
FDR
ADOCK 05000416
i
O
ZEof
_ _--
_ _ _ _ -
__- -- .
- - _ _
_ - - - _ _ - _ _ _ - _ _ _ -
..
o..
.
.
System Energy Resources, Inc.
2
gg
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
T. H. Cloninger, Vice President, Nuclear
Engineering and Support
C. R. Hutchinson, GGNS General Manager
J. G. Cesare,. Director, Nuclear Licensing
R. T. Lally, Manager of Quality Assurance
Middle South Utilities System Services, Inc.
R. B. McGehee, Esquire
Wise, Carter, Child, Steen and Caraway
N. S. Reynolds, Esquire
Bishop, Cook, Purcell & Reynolds
R. W. Jackson, Project Engineer
State of Mississippi
bcc w/encls:
NRC Resident Inspector
L. Kintner, NRR
Document Control Desk
Ril
R11
LM
[s'
FCan
06/[,/89
06/g/89
7
- - - - _ - - -
- _ - _ - - - - - - - - _ _
-
-- _