ML20246B047

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/89-55 & 50-446/89-55 on 890706-0801.No Violations or Deviations Noted
ML20246B047
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/17/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20246B050 List:
References
NUDOCS 8908230230
Download: ML20246B047 (3)


See also: IR 05000445/1989055

Text

,

-

n

.

-

..

AUG l 71989

In Reply Refer To:

Dockets:

50-445/89-55

50-446/89-55

Mr. W. J.

Cahill, Jr.

Executive Vice President

TU Electric'

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This. refers to the inspection conducted by Messrs. S. P. Burris and

S. D. Bitter during the period July 6 through August 1, 1989, of-

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with Mr. H. D. Bruner

and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observation by the

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

ORIGINAL SIGNPD BY R. F. WAIUi!CE

R. F. Warnick, Assistant Director

for Inspection Programs

890823023089hhh445

PDR

ADOCK 05

Comanche Peak Project Division

Q

FDC

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-55; 50-446/89-55

JbW

cc w/ enclosure:

See next page

'l

RI:IP:CPPD:NRR

SRI:IP:CPPD:NRR

IP:CPPD:NRR

AD:IP:CPPD:NRR

SBitter

SBurri

JWiebe g

RWarnick ffk)

8//7/89

8/[9/8

6

8/0/8F

8//7/89

W8

m

- - _

-

- - - _

'

'u

+

L.3

^

  1. ""W/'o

UNITED STATES

.

i,N'

'g

NUCLEAR REGULATORY COMMIMilON

H

n

'

-3

. ,E '

WASHINGTON, D. C. 20555

I

'+4 * * . + #c

g l 71989

'

~In Reply Refer To:

'

Dockets:

50-445/89-55

50-446/89-55

Mr. W. J. Cahill, Jr.

.

. Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

. Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the. inspection conducted by Messrs. S. P. Burris and

S. D. Bitter during the period' July 6 through August 1, 1989, of

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the' Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with Mr. H. D. Bruner

and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection ~

'

consisted of selective examination of procedures and representative

records, interviews with personnel, and observation by the

.

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the ene.~,osed inspection report will be

placed-in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

RFulmthk

R. F. Warnick, Assistant Director

for Inspection Programs

Comancho Peak Project Division

office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-55; 50-446/89-55

cc w/ enclosure:

See next page

-

_ _ _

- _ .

.

.

--..

F. J/ Crhill, Jr.

.cc w/ enclosure:

Roger D. Walker

TU Electric

!

Manager, Nuclear Licensing

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

,

Skyway Tower

Bethesda, Maryland

20814

400 North Olive Street, L.B.

81

Dallas, TX

75201

E. F. Ottney

P. O. Box 1777

Juanita Ellis

Glen Rose, Texas

76043

President - CASE

1426 South Polk Street

Jack R. Newman

Dallas, TX

75224

Newman & Holtzinger

1615 L Street, NW

Texas Radiation Control

Suite 1000

Program Director

Washington, DC

20036

Texas Department of Health

1100 West 49th Street

George R. Bynog

Austin, Texas

78756

Program Mgr./ Chief Inspector.

Texas Dept. of Labor & Standards

GDS Associates, Inc.

Boiler Division

1850 Parkway Place, Suite 720

P.O. Box 12157, Capitol Station

Marietta, GA

30067-8237

Austin, Texas

78711

Honorable George Crump

County Judge

Glen Rose, Texas

76043-

Ms. Billie Pirner Garde, Esq.

Garde Law Office

104 East Wisconsin Avenue

Appleton, WI

54911

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW

Washington, DC

20007

i

i

L

- -- _ _ .