ML20246B024

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1989 for Peach Bottom Atomic Power Station Units 2 & 3
ML20246B024
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/31/1989
From: Baron M, Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908230220
Download: ML20246B024 (14)


Text

_ _ ._

CCN 9-14326 1

/* [ PHILADELPHIA ELECTRIC COMPANY

'k PEAClf BOTIDM ATOMIC POWER STATION R. D.1. Box 208 4 I

WA ' Delta. Itnnsyh ania 17314 nun wrmm-Tur pourn or Excn.:e wcr (717) 4 5 6-7014 D. M. Smith Vice Pruident  ;

August 14, 1989 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of July 1989 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely s 7 13 DMS/TEC/MJB: cmc Enclosure cc: R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania T.P. Johnson, USNRC Senior Resident Inspector T.E. Magette, State of Maryland W.T. Russell., Administrator, Region I, USNRC H.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power INPO Records Center gevt I \

CCOWANRC 8908230220 890731 PDR ADOCK 05000277 R PDC

NRC Monthly Operations Summary Peach Bottom Atomic Power Station July 1989 UNIT 2 The unit began the month in the 'Run' mode at 45% power. The Power Ascension program continued throughout the month. Feedwater tuning and Transient testing at the Power Ascension 70% plateau were ecmpleted. A SCRAM and Group I isolation occurred during an attempt to remove a steam line resonance compensator board. Plant and personnel reactions to the trip were normal. The unit ended the month at 90%

power.

UNIT 3 The unit remained shut down during the report period with modification activities in progress.

- n CC0789.NRC 1

Docket No. 50-277 Attachment to Monthly Operating .

- Report for July 1989 UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

(1) Reload 7 completed (2) ' Reload 8 scheduled for January 6,1991 e

3. Scheduled date for restart following refueling:

(1) Completion of Power Ascension and Operator training targeted for mid-August 1989.

(2) Restart following refueling scheduled for April 6,1991

4. Will refwling or resumption of operation therefore require a technical specification change or other

, license amendment?

No.

- If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

Not applicable.

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, l

unreviewed design or performance analysis methods, significant changes in fuel design, new oprating procedures:

Refueling completed.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

l (a) Core - 764 Fuel Assemblies l

l (b) Fuel Pool - 1734 Fuel Assemblics,58 Fuel Rods CC0789.NRC l

l

Docket No. 50-277 '

L Attachment to l Monthly Operating Report for July 1989 Page 2

- UNIT 2 REFUELING INFORM ATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any ir. rease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuct assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1997 with full core offload capability.

I CCU789.NRC 1

[; ,

j. Docket No. 50-278

' Attachment to Monthly Operating Report for July 1989 UNIT 3 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

(1) . Reload 7 in progress (2) Reload 8 scheduled for August 31,1991

3. Scheduled date for restart following refueling (1) Restart following refueling forecast for October 1989 (2) Restart following refueling scheduled for October 29,1991
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? ,

Yes.

If answer is yes, what, in general, will these be?

(1) Cycle 8 Reload Amendment (2) Minimum SRM Count Amendment

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) Cycle 8 Reload License Amendment submitted July 1988 (2) Minimum SRM Count Amendment submitted December 1988

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

CC0789.NRC

4 .

Docket No. 50-278 Attachment to Monthly Operatirg Report for July 1989 '

Page 2 UNIT 3 REFUELING INFORMATION (Continued)

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 0 Fuel Assemblics (764 assemblics offloaded during outage)

(b) Fuel Pool 2260 Fuel Assemblics,6 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics. This modification began on February 20,1987. The completion date for this modification has been rescheduled for the first quarter of 1990 to accommodate the Unit 3 outage.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

With the current fuel pool capacity (prior to the completion of the fuel pool rcracking modification):

September 1996 without full core offload capability.

End of next cycle with full core offload capability -(est. January 1991).

With increased fuel pool capacity (subsequent to the completion of the fuel pool rcracking modification):

September 2004 without full core offload capability.

September 1998 with full core offload capability.

CC0789.NRC i

l_____..-_ _. _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ __ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _

AVERAGE CAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 q DATE AUGUST 15, 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION .

TELEPHONE (717) 457-7014 EXT. 3321 MONTH JULY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 583 17- 692 2 635 18 698 3 669 19 698 4 676 20 698 5 676 21 683 6 517 22 0 7 98 23 0 8 595 24 'O 9 678 25 0 10 681 26 0 11 680 27 0 12 679 28 247 13 687 29 860 14 684 30 928 15 679 31 935 16 686 i

1

4 AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 OATE AUGUST 15, 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STAT!DN TELEPHONE (717) 457-7014 EXT. 3321 MONTH JULY 1989 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET)

~

1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0

^

7 0 23 0 8 0 24 'O 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

~

OPERATING DATA REPORT L DOCKET NO. 50 - 277 OATE AUGUST 15, 1989 '

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES: UNIT 2 IN POWER ASCENSION
2. REPORTING PERIOD: JULY, 1989 AS OF APRIL 26, 1989
3. LICENSED THERMAL POWER (MWT): 3293
4. NAMEPLATE RATING (GROSS MWE): 1152 5, DESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1051
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) 51NCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY: .

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,0B7 132,143
12. NUMBER OF HOURS REACTOR WAS CRITICAL 617.7 1,976.6 76,173.4
13. REACTOR RESERVE SHUTOOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 572.4 1.457.9 73,324.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,311,744 2,234,44B 215.045,193
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 410,110 645.670 70,664,900
18. NET ELECTRICAL ENERGY GENERATED (MWH) 390,839 5B7.639 67,579,755 PAGE 1 0F 2 l

t OPERAT}NG DATA REPORT (CONTINUED) DOCKET NO. 50 - 277 DATE AUGUST 15, 1989 THIS MONTH YR-T D-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 76.9 28.7 55.5
20. UNIT AVAILABILITY FACTOR 76.9 28.7 55.5
21. UNIT CAPACITY FACTOR (USING MDC NET) 50.0 11.0 48.7
22. UNIT CAPACITY FACTOR (USING DER NET) 49.3 10.8 48.0
23. UNIT FORCED OUTAGE RATE 23.1 13.8 14.6
24. SHUTDOWNS SCHEDULED OVER NEXT 3 MONTHS (TYPE, DATE. AND DURATION OF EACH):

REFUELING OUTAGi

25. IF SHUTDOWN AT END OF REPORT PERIOD, EST! MATED DATE OF STARTUP:

26, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 PAGE 2 0F 2

o- ,.

l OPERATING UATA DEPORT DOCKET NO. 50 - 278 DATE AUGUST 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION j.. TELEPHONE (717) 457-7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM tJNIT 3 NOTES: UNIT 3 REMAINED SHUT DOWN
2. REPORTING PERIOD': JULY, 1989 VITH MODIFICATION
3. LICENSED THERMAL POWER (MWT): 3293 ACTIVITIES IN PROGRESS.
4. NAMEPLATE RATING (GROSS MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAX] MUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY: .

THIS MONTH YR-TO-DATE CUMUL ATIVE

11. HOURS IN REPORTING PERIOD 744 5,087 128,039
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 76,357.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 0.0 73.929.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 215,278.901
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 70,611.432
18. NET ELECTRICAL ENERGY GENERATED (MWH) -6.503 -32.412 67,620,743 PAGE.1 0F 2 Negative numbers reported for consistency with Federal Energy Regulatory Comission reports.

1

~

OPERATINGDATAREPORT(CONTINUED) DOCKET NO. 50 - 278 DATE AUGUST 15, 1989 THIS HONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 57.7
20. UNIT AVAILABILITY FACTOR 0.0 0.0 57.7
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 51.0
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 49.6
23. UNIT FORCED OUTAGE RATE 0.0 0.0 13.3
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOVN AT END OF REPORT PERIOD, EST! MATED DATE OF STARTUP: ,
26. UNITS IN TEST STATUS (PRIOR TO CCMiERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 4

PAGE 2 0F 2 i i

4 l-L__- -_.

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE AUGUST 15, 1989 REPORT MONTH JULY. 1989 COMPLETED BY PHILADELPHIA ELEC1RIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE' CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT f (4) (5) PREVENT RECURRENCE 5 890706 F 000.0 A 4 N/A EB CKTBRK GENEPATOR AUTOMATIC VOLTAGE REGULATOR POTENTIAL TRANSFORMER FUSE BLEW REACTOR WAS NOT SHUT DOWN 6 890707 F 013.8 A 4 N/A EB CKTBRK REPLACE FUSE IN POTENTIAL TRANSFORMER REACTOR VAS NOT SHUT DOWN 7 890721 F 157.8 A 3 2-89-15 CC INSTRU EHC CONTROL CARD MALFUNCTION REPAIR CONTROL CARD 171.6 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) '

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5) .

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAlh) EXHlBIT I - SAME SOURCE l

1 i

M

  • ~?

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 272 j l

UNIT NAME PEACH BOTTOM UNIT 3 DATE AUGUST IS, 1989 REPORT MONTH JULY, 19t9 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT- CODE' CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 7 890701 S 744.0 C 1 N/A RC FUELXX CONTINUATION OF REFUEL OUTAGE 744.0 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIDIT G - INSTRUCTIONS S - SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (S)

.G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE r

_ __ .