Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
- ~ _ - .
7 Northem States Power Company 414 Nicollet Mall L'inneapolis, Minnesota 55401 1927 Telephone (612) 330-5500
[-
p.
l August 8, 1989. Prairie Island. Technical Specification Section 6.7.A.3 n(SNuclear., Regulatory,Commissiog PAttn: ! Document:ControldDeskd e
~
ogggMbCDC ""20555 ' " ~
PRAIRIE ISLAND NUCLEAR GENERATING PIANT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report July, 1989 Attached is the Monthly Operating Report for July,1989 for the Prairie Island Nuclear Generating Plant.
Thomas M Parker Manager, Nuclear Support Services TMP/mkl c: Director Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment 990~731 'fEAY 9 82 k0500g,,
R fI
ra .
r.
- . No8BeIIV.E_IUddnBY_DE_DEEEeIING_EXEEBIEUCE r ,
6 F . DOCKET NO.:50-282 UNIT PRAIRIE ISLAND NO.i_
DATE AUGUST 3, 1989 COMPLETED BY DALE DUGSTAD-TELEPHONE 612-388-1121
' dDNIH2.__ JULY ______1282__
L L THE UNIT WAS BASE LOADED THIS MONTH.
OH JULY iST OUR NPDES PERMIT ALLOWED US TO GO TO UNLIMITED BLOWDOWN
- TO THE RIVER.
THE HOT WEATHER IS CAUSING HEAT RELATED PROBLEMS AFFECTING PLANT EQUIP-MENT SUCH AS HIGH STATOR TEMPERATURES ON THE CONDENSATE AND FEEDWATERJ l' PUMPS. FLUSHING . THE COOLERS AND CLEANING THE HEAT EXCHANGERS HAS LOW--
ERED THE TEMPERATURES. . ,
ON THE12iST AT 2343 THE UNIT TRIPPED DURING AN INVESTIGATION OF BURNING ODOR EMITTING FROM ? 11 BUS (4KV). THIS BUS SUPPLIES POWER'TO 11 RE-ACTOR COOLING PUMP. ON THE 22ND AT 1902 THE REACTOR WENT CRITICAL AND
.THE GENERATOR WAS PLACED ON LINE AT 2204. THIS ENDED A CONTINUOUS RUN
-OF 246 DAYS.
NO OTHER ITEMS TO REPORT.
CONTINUOUS OPERATING RUN OF 009 DAYS.
i i
l
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ D
a
~
+
eVEEeGE_DeILY_UNII_EDWER_ LEVEL DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.i_
DATE AUGUST 3, 1989 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121
- 00NIH1__ JULY ______1282__ .
DeY BYEBoGE DeILY_EDWEE_ LEVEL _ItlWE:NEIl 1 505 2 513 3 498 4 503 5 501 6 498 7- 500 8 .501 9 500 10 497 11 499 12 501 13 500 14 503 15 502 16 501 17- 502
- 18. 503
- 19. 507 20 506 21 498 22 -11 23 460 24 501 25 501 26 500 27 500 28 503 29 505 30 507 31 508 l
AVERAGE LOADS ABOVE 503 MWE-NET ARE DUE l TO COOLER CONDENSER CIRCULATING WATER l
l L.
,g .
DEEBeIING_ Dele _EEEORI b
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.i_
DATE AUGUST 3, 1989 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 DEEEeIING_SIeIUS i.. UNIT NAME: E8eIBIE_ISLeHD_ND._i ______________________
- 2. REPORTING PERIOD:__ JULY ______1282___ l NOTES: I
- 3. LICENSED THERMAL POWER (MWT): 1650 l l
- 4. NAMEPLATE RATING;(GROSS MWE): 593 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE).: 530 l l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)' 534 l l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 503 1________ _________1 8..IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH"__) 7 SINCE LAST REPORT GIVE REASON: NONE_______________________________
- 9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (NET MWE): _NONE______________
- 10. REASONS FOR RESTRICTIONS, IF ANY:__NONE_______________________________
IBIS _dONIH YE=IO:DeIE CUbuleIIVE.
' ii. HOURS'IN REPORTING PERIOD 744 5087 136967
'12.. NUMBER.0F HOURS REACTOR WAS CRITICAL 724.7 5067.7 115446.5
- 13. REACTOR. RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
'14.-HOURS GENERATOR ON-LINE 721.7 5064.7 113975.3
'15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL. ENERGY GENERATED (MWH) 1181764 8279650 179627864
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 384450 2741250 58876730
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 360217 2587416 55248470 19~. UNIT' SERVICE FACTOR 97.0 99.6 83.2
- 20. UNIT-AVAILABILITY FACTOR 97.0 99.6 83.2
-21. UNIT CAPACITY FACTOR (USING MDC NET) 96.3 101.1 80.2
- 22. UNIT. CAPACITY FACTOR (USING DER NET) 91.4 96.0 76.1
- 23. UNIT FORCED OUTAGE RATE 3.0 0.4 6.2
- 24. FORCED OUTAGE HOURS 22.3 22.3 7482.5
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):
______________BEEUELING_QUIeGE__0N__JeNueBY_10._1220___33_DeYS_________
L26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:______NZe_________________
,+-'
UNII_SBUIDOWNS_eND_EDWER_BEDUCIION-DOCKET NO 50-282 UNIT NAME EBeIBIE_ISLeND_ND._i ,
DATE GUGUSI_3 _1282____
COMPLETED BY DELE _DUGSIeD TELLEPHONE 612-388-1121 dQNIBl_JULYm_____1282______
DeIE IXEE UDUES BEeSON' dEIBDD LEB_NUMBEB SYSIEd COMEONENI YY/MM/DD 000.0 89/07/06 S 0.0 B 5 N/A N/A N/A AXIAL OFFSET CALIBRATION.
89/07/21= F. 22.3 G 3 89-010 EA BKR BREAKER TO ii RCP OPENED DURING INVESTIGATION OF 11 BUS 89/07/22 S' O.0 B 5 N/A N/A N/A TURBINE,0VERSPEED TRIP TEST.
IYEE BEeSDN MEIUDD SYSIEd_ CODE F-FORCED A-EQUIPMENT FAILURE i-MANUAL DRAFT IEEE STD
, S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP 1 D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD CQdEDNENI_CDDE LICENSE EXAMINATION 9-0THER l F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-0THER l
)
f .
[~ a. .
NoBBoIIYE_SubdoBY_DE_DEEBoIING_EXEEBIENCE i
DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO 2_
DATE-AUGUST 3, 1989 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388W1121 MONIN1__ JULY ______1282__
THE. UNIT WAS BASE LOADED THIS MONTH, NO SHUTDOWNS.
~
ONl JULY iST OUR NPDES. PERMIT ALLOWED US TO GO TO UNLIMITED BLOWDOWN TO THE RIVER.
THE HOT WEATHER IS CAUSING HEAT RELATED PROBLEMS AFFECTING PLANT EQUIP-MENT SUCH AS FAN. TRIPPING ON 2GT OIL COOLERS.
ON THE 18TH A SPIKE ON B TRAIN CHLORINE MONITOR CAUSED AN AUTOMATIC START OF-122 CONTROL ROOM CLEANUP FAN.
NO OTHER ITEMS TO REPORT.
CONTINUOUS OPERATING RUN OF 065 DAYS
F ..
.. s
.j eVEBeGE_DeILY_UNII_EDWEB_ LEVEL DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2_
- DATE AUGUST 3, 1989 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 dQNIH1__ JULY ___-._1282__
DeY GMEBeGE_DeILY_EDWEB_ LEVEL _idWE NEIl 1 504 2' 509 3 502
.4 502 5 501 6 499 7 499 8 502 9 499 10 498 11 498 12 501 13 501 14 503 15 479 16 501 17 501 18 503 19 505 20 505 21 502 22 504 23 501 24 501 25 A99 26 500 27 498 2' . 500 29 305 30 505 31 507 4
i AVERAGE LOADS ABOVE 500 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
- i l
l 1
. - . - - - _ _- _ _- _ A
m .
p :.e S .l ly
- DOCKET NO. 50-306-UNIT PRAIRIE ISLAND NO.2_
DATE AUGUST 3,~1989 COMPLETED 1BY DALE DUGSTAD TELEPHONE ~612-388 .1121
- .0EEEeIING_SIeIUS *
. i ._.. U N I T N A M E : EBeIBIE_ISLeND_NO._2 ______________________
2.; REPORTING PERIOD:__ JULY ______1282___ l NOTES: l E31 LICENSED-THERMAL POWER.(MWT): 1650 l l
- 4. NAMEPLATE RATING-(GROSSLMWE): 593' I i w.45. DESIGN ELECTRICAL' RATING-(NET..:NWE): 530 I .l.
6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 531 l l J7; MAXIMUM DEPENDABLE _ CAPACITY (NET MWE): 500 1____________________1 LB.'IF CHANGES 0CCURsIN' CAPACITY. RATINGS.(ITEMS: NUMBER 3 THROUGH 7)
SINCE LAST REPORT'GIVE REASON:__NONE______________________________
~
' 9 '. [PUU55~55V55~iU~U55C5~E5ST555556~~5F~~UE~i 5T 5U55I((UQUE$~$~_~~~~_[~2~~~_ _ _ _
L10.iREASONS.FOR' RESTRICTIONS- IF ANY:__NONE_______________________________
IBIS _dQNIB .YB:IO:DeIE~ CubuleIIVE
'11.. HOURS IN REPORTING PERIOD. 744 5087 128085 112. NUMBER:0F-HOURS REACTOR WAS CRITICAL 744.0 4352.8 112402.1
>i3. REACTOR RESERVE; SHUTDOWN HOURS ~
0.0 0.0 1516.1 14.s HOURS GENERATOR 0N-LINE- 744.0 4303.8- 111272.2:
15.' UNIT. RESERVE SHUTDOWN l HOURS- 0.0 0.0 0.0
~ 16. GROSS THERMAL ENERGY: GENERATED (MWH) 1224639 6769057 175519511 Li7.; GROSS ELECTRICAL ENERGY GENERATED (MWH) 396030 2222120 56846250
, ,18.-NET. ELECTRICAL ENERGY GENERATED (MWH) 372823 2095850 53766451
.19.. UNIT SERVICE FACTOR- 100.0 84.6 86.9
- 20. UNIT AVAILABILITY FACTOR. 100.0 84.6 86.9 Ic21. UNIT CAPACITY FACTOR (USING MDC NET) 100.2 82.4 84.0
'22.,UNITcCAPACITY FACTOR.(USING DER NET) 94.5 77.7 '79.2
-23. UNITcFORCED DUTAGE RATE- 0.0 0.5 2.9 24.' FORCED-OUTAGE HOURS 0.0 21.8 3368.6
- 25.
- SHUTDOWNS' SCHEDULED DVER NEXT 6 MONTHS.(TYPE, DATE & DURATION OF EACH).
l
_______________________NONE____________________________________________
- 26. IF CURRENTLY SHUTDOWN ESTIMATED'STARTUP DATEl_____N_e_________________
1
I .' 'w .
s.;}[.Ni '
-:x ,
is; .
, UNII_SUUIDOWNSioND_EDWER_BEDUCIION
' ~
DOCKET:NO 50-306- .
UNIT NAMETE8eIBIE_ISLeND_NO _2 DATE.eUGUSI_31_12B2____
COMPLETED}BY DELE _DUGSIGD TELLEPHONE 612-388-1121 dONIH1_ JULY ______1282______
DeIE .:IXEE 80URS BEeSON MEIUDD LER_ NUMBER-~SYSIEd. COMEONENI" YY/MM/DD :000.0 89/07/15 S- 0.0 B 5- N/A .N/A. N/A TURBINE VALVES TESTING.
~89/07/21' S- ~0.0' B- 5- 'N/A N/A -N/A
-TURBINE OVERSPEED-TRIP. TEST.
i
[
IXEE- -BEeSON dEIBOD SYSIEd_ CODE
- F-FORCED A-EQUIPMENT FAILURE' i-MANUAL DRAFT IEEE STD
- S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P905-D5)
C-REFUELING 3-AUTO TRIP D-REGULATORY. RESTRICTION 4-CONTINUED E-OPERATOR. TRAINING & 5-REDUCED LOAD C0dEONENI_ CODE LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-0THER
_- _ - - _ _