ML20245K922

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/89-53 & 50-446/89-53 on 890706- 0801.No Violations or Deviations Noted
ML20245K922
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/14/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20245K925 List:
References
NUDOCS 8908210205
Download: ML20245K922 (3)


See also: IR 05000445/1989053

Text

,

.

_

-.

- _ - _

,

t

te

f

'J*

.

.

r

,e

F

.In Reply Refer To:

.

AUG l i1989

F

Dockets:

50-445/89-53

50-446/89-53

,

Mr. W. d. Cahill, Jr.

Executive Vice President

TU1 Electric ~

i

400 North l Olive: Street,. Lock Box 81

f

Dallas, Texas;

75201

E

Dear., Mr." Cahill: -

This refersfto;the' inspection conducted by Mr. M. Runyan and NRC'

'

.

consultantsiduring.the-period July 6Lthrough August 1, 1989, of.

activities authorized by NRC Construction Permits CPPR-126 and'

CPPR-127 for.the' Comanche Peak = Steam Electric Station, Units 1

and 2, and to the discussion of our findings with Mr. H. D. Bruner

'

and other members of your staff at'the conclusion of the

-inspection..

' '

The enclosed copy of.our. inspection report identifies areas

I

examined during'the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by.the

inspectors.

Within'the scope of the inspection, no violations or deviations

were identified.

~

In accordance'with 10 CFR 2.790 of the Commission's regulations,.a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you-have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

bhiiGINEEEIGNED DY R. F. Y/AB5TCr

R. F. Warnick, Assistant Director

for Inspection Programs

8908210205 890814

Comanche Peak Project Division

PDR

ADOCK 05000445

Office of Nuclear Reactor Regulation

Q

PDC

Enclosure:

Inspection Report 50-445/89-53; 50-446/89-53

cc w/ enclosure:

See next page

IP:CPPD:NRR

IP:CPPD:NRR

AD:IP:CPPD:NRR

MRunyan g

HLivermore

RWarnickNW

.8/14 /89

8/$ /89

8/11/89

gg{gy /

.

L _ _ __ -

._- __.

E $ {l

_ _ _ - _ - _

.#

'o

UNITED STATES

-

I

-

"y

NUCLEAR REGULATORY COMMISSION

o-

. y

WASHINGTON, D. C. 206f4

7,.

f

p

R I 41989

......

In Reply Refer To:

Dockets:

50-445/89-53

50-446/89-53

Mr..W..J.

Cahill,.'Jr.

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

-Dallas, Texas

75201

' Dear Mr. Cahill:

This refers to the inspection conducted by Mr.

M..

Runyan and NRC

consultants during the period July 6 through August 1, 1989, of

activities authorized by NRC Construction Fermits CPPR-126 and

.

l

CPPR-127 for the Comancho Peak Steam Electric Station, Units 1

l

and 2, and to the discussion of our findings with Mr.-H. D. Bruner

i

and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our-inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative,

records,. interviews with personnel, and observations by the

,

inspectors.

!

Within the scope of the inspection, no violations or deviations

were. identified.

In accordance with 10 CFR 2.790 of the. Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room..

Should you have any questions concerning this inspection, we will

l

be pleased to discuss them with you.

Sincerely,

RFID" M

R.

F. Warnick, Assistant Director

'

for Inspection Programs

Comanche Peak Project Division

Office of Nuclear Reactor Regulation

j

Enclosure:

Inspection Report 50-445/89-53; 50-446/89-53

L

i

l

cc w/ enclosure:

{

See next page

4

_ - - . _ . _

,

,

'

-

..

W.

J. Cahill,.Jr.

,

.cc w/ enclosure:

Roger D. Walker

TU Electric

Manager, Nuclear Licensing

c/o Bethesda Licensing

TU Electric

3 Metro Center, suite 610

Skyway Tower

.

Bethesda, Maryland

20814

-400 North Olive Street, L.B.

81

Dallas, TX

75201

E. F. Ottney

P. O. Box 1777

Juanita-Ellis

Glen Rose, Texas

76043

President - CASE

1426 South Polk Street

Jack R. Newman

Dallas, TX

75224

Newman & Holtzinger

1615 L Street, NW

Chief, Texas Bureau of

Suite 1000

Radiation Control

Washington, DC

20036

Texas Department of Health

1100 West 49th Street

,

Austin, Texas

78756

GDS Associates, Inc.

1850 Parkway Place, Suite 720

Marietta, GA

30067-8237

Honorable George Crump

~

' County Judge

Glen Rose, Texas

76043

Ms. Billie Pirner Garde, Esq.

Garde Law Office

104 East Wisconsin Avenue

Appleton, WI

54911

l

Kegional Administrator, Region IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW

Washington, DC

20007

l

.