ML20245K852

From kanterella
Jump to navigation Jump to search
Responds to Green Ticket Item 4514, Testing Requirements to Detect Thermal Fatigue Cracking in Piping Connected to Rcs. Concurrence Page Distribution Should Be Added When Preparing Response
ML20245K852
Person / Time
Issue date: 05/26/1989
From: Norberg J
Office of Nuclear Reactor Regulation
To: Cheng C, Richardson J
NRC
Shared Package
ML20245K844 List:
References
NUDOCS 8907050283
Download: ML20245K852 (2)


Text

_ _ _ _ _ _ _ _ _ _

  1. p8 arcoq'o UtdlTED SVATES

~g

.[

g NUCLEAR REGULATORY COMM!ESION

'5

.j.

WASHINGTON, D. C. 20555

/

May 26, 1989 NOTE T0:

J. Richardson /C.Y. Cheng FROM:

James Norberg, Special Assistant-Division of Engineering and Systems Technology u e= r c e 7

SUBJECT:

GREEN TIACKET ITEMS 4514 - TESTING REQUIREMENTS TO DE-GFEC+

THERMAL FATIGUE CRACKING IN PIPING CONNECTED TO REACTOR C00LANT' SYSTEMS The response to the attached action item is due to DEST (Mr. Shao's Office, BE1) by June 8, 1989.

Please make sure that D/ DEST receives a copy of the final ticket response.

When preparing the response, please' add to the concurrence page distribution list "LShao" and the appropriate ticket number identifying the action item.

For example, LShao (WITS 87-XX or DEST 87-XX or YT879XXX or EDO #26XX).

It is DEST policy that the Director receive responses for all tickets at least one working day prior to the due date.

If the original action item due date is changed, please inform Nancy at X20884, she will then revise the DEST due date accordingly. You should also keep Nancy informed on the status of all controlled action items (e.g., EDO, Green Tickets, WITS) assigned to your office (e.g., to what branch / person the action item was assigned to).

1 C7&p ames Norberg, Specia ssistant Division of Engineering and Systems Technology e907050283 890 M POR IkE pDR.

MISC

, _.., ~

~=.

gg sn W

.v :.g o,

.. >. i :

y:.

q+'

+

" O g,.,,,

ny r i-y.* ),9

'o UNITED STATES -

i

'*) }.

g

NUCLEAR REGULATORY COMMISSION

(.

I eE

' WASHINGTON D. C. 20555

, 5 '

D.. i Q' W EDO-PrincipalcCor, despondence Control Y, -

8'

/'

g t,

-FROM' DUE: 06/12/89-EDO CONTROL: 0004514 DOC DT 05/22/89 r.

1 FINAL REPLY:

RONALD'SANACORE,;AMERICAN' f,J. NUCLEAR INSURERS 9

m, TO:

STELLO w

.FOR SIGNATURE OF:

MURLEY

'DESC:

ROUTING:

. TESTING-REQUIREMENTS TO' DETECT THERMAL-FATIGUE STELLO CRACKING IN-PIPING' CONNECTED.TO REACTOR COOLANT TAYLOR

-; SYSTEMS.'

THOMPSON BLAHA

. DATE: 105/25/89^

BECKJORD,.RES SCINTO,' OGC fASSIGNEDLTO:

CONTACT:

~ JORDAN, AE0D NRR MURLEY 4

SPECIAL' INSTRUCTIONS OR REMARKS:

r

?-

l r

l h

t l6.

NRR.' RECEIVED: fMY-25. 1989

'i' g.~

'h-ACTION:

DEST:SHA01 ;j

\\p t

A r't d-C

.NRR ROUTING:'

iluRLEY/SNIEZEK

)

J ilIRAGLI A -

I

.CRUTCHFIELD

[f

$ p/ @g' PARTL0ll 91ELESPIE I

rtossouRG-f

,i L

3

+ '

i

__