ML20245K472

From kanterella
Jump to navigation Jump to search

Forwards Supplemental Info Re 890612 Application for Amend to License NPF-3,revising Tech Spec Requirement 4.8.1.1.2.d.1 to Extend Insp Interval from 10 to 30 Months
ML20245K472
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/11/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245K475 List:
References
1703, TAC-73243, NUDOCS 8908210034
Download: ML20245K472 (3)


Text

.

d-.[ %VM $ic Y.y.g*

' %;;9,

';n;. s A

5 w

2

't 7

TOLEDO EDISON:

' A Centenor Ensegy Company Jockey. Number.30-346l DONALD C. SHELTON

License Number NPF-3 fflylg-7

[ Serial Kumb'er,17'03 LAugustill,I1989 4

y, United States Nuclear Regulatory. Commission

. Document Control Desk',

'Vashington, D.:C. -20555-

Subject:

> License Amendment Application to Revise the Frequency of Technical Specification ~ Surveillance Requiram%t 4.8.1.1.2.d.1, Supplemental lnformationf(TAC. Number 73243)

' Gentlemen:

Toledo Edison submitted.a license amendment request (Serial Number'1670 dated-l June 12, 1989), _which proposed revision to.the Davis-Besse Nuclear Power

Station,.UnitL Number 1 Operating License, Appendix A, Technical

. Specifications, Section 3/4.8.1.1, A. C. Sources - Operating, Surveillance Requirement 4.8.1.1~.2.d.1.

This surveillance requires that at least once per 18 months 'each diesel be: inspected by procedures prepared in conjunction with its manufacturer's recommendations. The request proposed to extend the

-inspectioniinterval from 18 months to 30 months.

The purpose lof this: letter is.to provide,_as supplemental.information, the Davis-Besse, diesel manufacturer's, Morrison-Knudsen Company, report which vas issued.following their review of Toledo Edison's proposal to increase the i

Linspection interval.

.Should further-information be required, please contact Mr. R. W. Schrauder,

Nuclear Licensing Manager, at (419) 249-2366.

Very truly yours, _

'GBK/dlm-Attachment' cc:-

P,. M. Byron, DB-1 NRC Senior Resident Inspector A.--B.

Davis, Regional Administrator, NRC Region III T. V. Vambach, DB-1 NRC Senior Project Manager State of' Ohio MI I

8908210034 890811 3 \\

PDR-ADOCK 05000346 P_

PDC

' THE TOLEDO ED! SON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652


a--

5.

.y

~

t

[ * ; _* '. -

p, a,

. - >.e

3.

p-e l', L Morrison-Knudsen Company, Inc. Report on Review of Toledo Edison Proposal to Increase the Diesel 18 Honth Inspection.to 30 Honths 1

i I

1 l

l 1

j

L

~4.,

F ':.i EXT-89-05858 E>Q MORRISON-KNUDSEN COMPANYJINC.

i

'v d'h. POWEft SYSTEtes DfvlS40N ROCK M UNT NO TH CAROLINA 27832-1928 PHONE. (919) 977-2720 / TWX 1510) 92H725 FAX. ;)19) 446 3830 August 3, 1989 Serial Number 6993C-0-0008

. Toledo Edison Company.

300 Madison Avenue d

. Toledo, Ohio 43b52-0001 r.i l

Attention: Sushil C. Jain e

Nucient Engineering Director Mailstop.3105

Reference:

Toledo Edison Davis Besse Plant Preventative Maintenance

. Task Work Authorization 177-553-8757-00 P.O. No. 01-6744-50 MK/PSD IWO 6993

. Subj ect:

. Document Submittal-Gentlemen:

Enclosed please find three (3) copies of the following report which is resubmitted to incorporate a MK/PSD change.

Document' Sheet Revision Title / Description 2

Review 18 Month FM Items 6993 -

for Diesel Generator and Evaluate Extension to 30 Months Should there be'any questions, please do not hesitate to call.

Very truly yours, MORRISON-KNllDSEN COMPANY, INC.

POWER SYSTESM DIVISION VC. %. A Kathy Cary rwiler Contracts A in rator KCT:ja ced : 6. wt 1

'/ #*" 3. 6 6de-5/o-pg I

1 l

l i

= _ _ _ _

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _