ML20245K223
| ML20245K223 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/30/1989 |
| From: | William Cahill, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TXX-89448, NUDOCS 8907050061 | |
| Download: ML20245K223 (1) | |
Text
f L
0 l
_M l""" 9 Log # TXX-89448 L
C File # 10035 r
r GL 85-06 1
gef,p$ofpNo[62(c)(1) 7UELECTRIC 1
June 30, 1989 j
Wimam J. CahlH. Jr.
t.ecunre vice Presisen l
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 i
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
]
3 DOCKET NOS. 50-445 AND 50-446 IMPLEMENTATION OF ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS) HITIGATION SiSTEM ACTUATION CIRCUITRY REF:
1)
W. G. Counsil letter TXX-6769 to NRC dated October 9, 1987 2)
W. G. Counsil letter TXX-88764 to NRC dated October 31, 1988 Gentlemen:
In Reference (1), TU Electric provided its plant specific response describing the CPSES.ATWS Hitigation System Actuation Circuitry (AMSAC) which meets the requirements of 10CFR50.62 paragraph (c)(1).
Reference (2) provided a revised implementation schedule of June 1989. The purpose of this letter is to update the CPSES implementation of AMSAC.
Final implementation of AMSAC is incomplete.
Due to a delay in the receipt of equipment parts, the installation of AHSAC has been delayed.
Final implementation will be prior to Unit I fuel load for Unit 1.
Applicable procedures will be developed prior to the initiation of the associated activity. The schedule for Unit 2 remains unchanged.
Sincerely, Yhath
)h William J. Cahill, Jr.
By:
M1 Roger D. Walker Hanager, Nuclear Licensing VPC/vid c - Mr. R. D. Hartin, Region IV Resident Inspectors, CPSES (3) 0 8907050061 890630 PDR ADOCK 0500 3