Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Unit 1 Testing of safety-related Valves & Accumulators Rescheduled for Completion by Fuel Load
ML20245K056
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/09/1989
From: Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-14, TXX-89561, NUDOCS 8908180291
Download: ML20245K056 (2)


Text

,

g6 ; 7 *

.l.

C' ME5 Log # TXX-89561 File'# 10035

.__=

=

Ref. #. Generic Letter 88-14

1RIELECTRIC g

i:"I WHH be J. Caldil.Jr. -

Enamw Vice President

,a

/

k)"

. ^

. ;\\.

U. S. Nuclear Regulatory Commission '

Attn:-Document Control Desk Washington D. C.

20555

SUBJECT:

LCOMANCHE PEAK-STEAM ELECTRIC. STATION (CPSES)

.J DOCKET NOS. 50-445 and S0-446 NRC, GENERIC LETTER 88-14:

-INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING

. SAFETY-RELATED EQUIPMENT REF:

l') TU Electric letter TXX-89052, from W.

J.' Cahill, J.'

to-USNRC,'

.j dated February 6,1989

g-
2) TU Electric' letter TXX-89461, from M. J. Cahill, Jr. to USNRC, dated July.31, 1989 G'entlemen:

.On. February 6, 1989 (Referent.e 1), TU Electric responded to NRC Generic Letter

.J 88-14. " Instrument Air. Supply System problems Affecting Safety-Related Equipinent,"'and the recommendetiens in NUREG-3275 Volumi-2.

-9

. in this resporse TU Electric indicated that the initial cycli; *estf r.q of

. safety related valv% and ecrumulaton would be per/crmed by the Startup f

Department darf ag syrtem preoperstional tests. The estimattd contptetion 6 te 1

for this h ting for Unit I was given as May 19, 1989.

8908300/29% 890009 C PDR ADOCK 05000445h y

P PNUL M

I t ' '>

I 400 North Olive Street LB 81 Dallas, Texas 73201 mRi____.____.._._______________.___

[ ;',_

I

  • TXX-89561 August 9, 1989 Page 2 of 2 As a result of discussions between TU Electric and the NRC prior to and during the preoperational and startup testing audit conducted June 20-22, 1989, Unit I testing was rescheduled for completion by Unit I fuel load.

Reference 2 provides a discussion of the loss of instrument air tests for accumulators.

These tests encompass the cyclic testing of safety-related valves and accumulators. The schedule for Unit 2 remains unchanged.

Sincerely, William J. Cahill, Jr.

By:

D. R. Woodlan Docket Licensing Manager MCP/das c - Mr. R. D. Hartin, Region IV Resident Inspectors, CPSES (3) f I