Notification of 890712 Meeting W/Licensee in Rockville,Md to Discuss Plant Tech Specs.Proposed Agenda Encl
ML20245K036
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 06/28/1989
From: Malloy M
Office of Nuclear Reactor Regulation
To: Charemagne Grimes
Office of Nuclear Reactor Regulation
References
NUDOCS 8907030256
Download: ML20245K036 (6)


Text

i

.s l c

's #4C0

+

, ,. 9[o,;

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 1 r,, WASWNGTON, D. C. 20555

, .l

\ . . . . . p# June 28, 1989 l

I Docket No. 50-445 l l

MEMORANDUM FOR: Christopher I. Grimes Director Comanche Peak Project Division Office of Nuclear Reactor Regulation THRU: s H. Wilson, Assistant Director )

for Projects J Comanche Peak Project Division 1 Office of Nuclear Reactor Regulation )

FRON: Melinda Malloy, Project Manager Comanche Peak Project Division '

Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING

  • WITH TU ELECTRIC REGARDING THE COMANCHE PEAK STEAM ELECTRIC STATION J l

Date & Time: Wednesday, July 12, 1989 I 1:00 pm - 5:00 pm Location: One White Flint North '

11555 Rockville Pike i Rockville, MD 20852 Room 14B-13

Purpose:

To discuss Comanche Peak Unit 1 Technical Specifications (seeattachedagenda)

Participants *: NRC TU Electric C H. Wilson F. Allenspach i M. Malloy L. Kopp J. Kelly R. Walker )

R. Each W. LeFaye J. Seawright N. Hood, et al R. Giardina C. Li .

F. Ashe -

d linda Malloy, Project Ma r 4

l Comanche Peak Project Divi n '

)

Office of Nuclear Reactor Regulation j 1

Enclosure:

Proposed agenda cc: See next page {

CONTACTS: M.Malloy(301)492-0738 or M. Fields (301)492-0765

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, interveners, or other  ;

parties to attend as observers pursuant to "Open Meetings and Statement of 4 NRC 5taff Policy," 43 Federal Register 28058,6/28/78.

go7030256890628 ~~

4 p ADOCK 05000445 {

PNU

i i

CC:

Asst. Director for Inspec. Programs Joseph F. Fulbright 3 Comanche Peak Project Division Fulbright & Jaworski j U.S. Nuclear Regulatory Comission 1301 McKinney Street 1 P. O. Box 1029 Houston, Texas 77010 i Granbury, Texas 76048 )

Roger D. Walker j Regional Administrator, Region IV Manager, Nuclear Licensing U.S. Nuclear Regulatory Connission Texas Utilities Electric Company 611 Ryan Plaza Drive, Suite 1000 Skyway Tower Arlington, Texas 76011 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Lenny A. Sinkin  ;

Christic Institute Texas Utilities Electric Company j 1324 North Capitol Street c/o Bethesda Licensing I Washington, D.C. 20002 3 Metro Center, Suite 610 Bethesda, Maryland 20814 ]

4 Ms. Billie Pirner Garde, Esq.

Garde Law Office William A. Burchette, Esq.  ;

104 East Wisconsin Avenue Counsel for Tex-La Electric Cooperative  :

Appleton, Wisconsin 54911 of Texas Heron, Burchette, Ruckert & Rothwell Susan M. Theisen 1025 Thomas Jefferson Street, NW Assistant Attorney General Washington, D.C. 20007 Environmental Protection Division P. O. Box 12548, Capitol Station GDS ASSOCIATES, INC. <

Austin, Texas 78711-1548 Suite 720 '

1850 Parkway Place 1 Mrs. Juanita Ellis, President Marietta, Georgia 30067-8237 i Citizens Association for Sound Energy 1426 South Polk Jack R. Newman Dallas, Texas 75224 Newman & Holtzinger 1615 L Street, NW E. F. Ottney Suite 1000 P. O. Box 1777 Washington, DC 20036 Glen Rose, Texas 76043 George A. Parker, Chairman Public Utility Comittee Senior Citizens Alliance of Tarrant County, Inc.

6048 Wonder Drive Fort Worth, Texas 76133 Mr. W. J. Cahill, Jr.

Executive Vice President, Nuclear Texas Utilities Electric Company 400 No. Olive Street, L.B. 81 Dallas, Texas 75201 l

L._----_~--.-__.__._.____.-

PROPOSED AGENDA FOR NRC/TU ELECTRIC MEETING ON COMANCHE PEAK UNIT 1 TECHNICAL SPECIFICATIONS (TS)

July 12, 1989 1:00 pm - 1:15 pm -1. Introductions and Opening Remarks 1:15 pm - 2:15 pm 2. Discussion of several corrections to Unit 1 TS proposed in Attachment 2 of TXX-89169 dated March 14, 1989.

Page/TS Section Staff Position

a. ii/Index The proposal to delete the definition of 1-6/ Definitions " SOURCE CHECK" is inconsistent with the l application of Generic Letter 89-01 to the Unit 1 TS.
b. 3/4 3-11 This proposed change was previously RTS Instrumentation table discussed as TS change ID #0123 and notations TV Electric was advised that the staff considered it to be generic (i.e., ap-plicable to any 4-loop Westinghouse unit).

The staff does not consider this change to be safety significant; therefore, it will not be considered further at this time due to resource constraints.

c. 3/4 3-19 The staff agrees with the proposed changes, ESF Actuation System except for the ACTION required. The staff Instrumentation table believes ACTION 23 is more appropriate.
d. 3/4 3-19 & 3-22 The staff disagrees with the proposed ESF Actuation System changes because the addition of Note g would Instrumentation table allow less conservative actions to be and notations taken than presently allowed by Specifi-cation 3.3.2.
e. 3/4 10-5 The proposed changes are considered to Position Indication System- be generic (i.e., applicable to any Shutdown 4-loopWestinghouseunit). The staff does not consider this change to be safety significant; therefore, it will not be considered further at this time due to resource constraints.
f. B 3/4 6-1 Bases The correction of maximum allowed leakage Bases 3/4.6.1.2, limits for four of the valves is acceptable.

Containment Leakage The other proposed changes are unacceptable because (1) the change does not clarify that water test is an acceptable alternative to air testing and (2) 10 CFR 50 Appendix J q does not allow for combined leakage on isolation valves in parallel.

__ _ _ _ ____-____ -___ - . _. R

. v . .

T PROPOSED AGENDA FOR JULY 12, 1989

2. continued Page/TS Section Staff Position
g. B 3/4 6-3 .

The proposed changes constitute an r Bases 3/4.6.3, interpretation of the bases which the Containment Isolation staff feels is unnecessary.  ;

Valves

h. 6-4 Changes proposed are unacceptable 6.2.3, ISEG. because the Standard TS requires a l high-level corporate official which is not reflected in the technical i interfaces position.

l

1. 6-7 The changes aroposed are generic in 6.5.1.6o, SORC nature and t1e staff prefers to retain ]

4 Responsibilities the wording of Generic Letter 88-12.  ;

j. 6-12 The changes proposed are unacceptable.

6.5.3.lc, Technical An exact title is needed to conform Reviews and Controls with the rest of TS Section 6.0.

2:15 pm - 2:45 pm 3. Discussion of two items from the NRC's independent review of the Final Draft Unit 1 TS.

Page/TS Section Staff Position

a. None(missing) SER 5ection 15.2.3.1 (Boron Dilution Events) states that in cold shutdown, the dilution rate is limited to a possible maximum of 10 ppm / min, which corresponds to an unborated primary water flow rate of 150 gpm. The SER also states that this restriction is administratively car-ried out and is to be implemented in the i TS.

The Unit 1 TS have' no specification covering this SER item. The staff was advised that the flow is limited by design (i.e.,

fixed orifices). .The staff has requested TU Electric to advise as to where in the FSAR this design feature is documented,

b. 3/4 6-11 The staff has revised Surveillance 3/4.6.2, Containment 4.6.2.1.c.2 by changing "or" to "and." As I Spray System - Depres- previously written, the surveillance re- l surization and Cooling quired spray pump start on only one or j System the other (not both) the Containment Spray Actuation test signal and the Safety In-jection test signal, whereas the FSAR indicates that the spray pump starts automatically on each signal. The change  ;

brings the TS into conformance with the FSAR.

i

_ _ _ _ - - _ _ _ _ _ - _ _ _ - _ - - - _ _ _ _ - _ - _ _ _ _ . _ - _ _ _ _ R

s. ,

..g .

1 PROPOSED AGENDA FOR JULY 12, 1989' i

- 3 '-  !

1 2:45'pm - 3:45 pm 4. Discussion of staff questions on corrections'to ~ 1 Unit 1 TS relating to accident monitoring instru- j mentation proposed in Attachment of TXX-89243 .

' dated May 15, 1989.

3:45 pm - 4:15 pm. 5. Other Topics (as necessary) 4:15 pm - 4:45 pm C. Staff Caucus (if necessary) 4:45 pm - 5:00 pm. 7. Summary and Closing Remarks  ;

1 i

J 1

j i l l' d

1 f c-,

June 28, 1989 u

a I

L

' NOTICE OF 7/12/89 MEETING WITH TV ELECTRIC .j:

L lSTRIBUTION:

k)RC N H1 Tom Essig Wayne fieinke 9 DR ADSP, Reading CPPD Reading- 'r DCrutchfield TQu6y. t CGrimes .!

PMcKee JLyons RWarnick JHWilson .

MMalloy I

'MFields FAshe JWiebe BZalcman SWeiss FMiraglia SNewberry BMarcus CMcCracken JWermiel WLeFave C-YLi-MHodges LPhillips LKopp

-AGody WBateman FA11enspach WLanning BGrimes JPartlow EJordan CRossi JCalvo <

REmch Ofol i RGiardina f i RMartin- .

GPA/PA l JG11111and,RIV/PA OGC

'ACRS(10)