ML20245J755

From kanterella
Jump to navigation Jump to search
Errata to Revised Testimony of Cj High on Behalf of Jm Shannon,Atty General for Commonwealth of Ma Re Contention JI-56 (Monitoring Rate).* Related Correspondence
ML20245J755
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/27/1989
From: High C
MASSACHUSETTS, COMMONWEALTH OF, RESOURCE SYSTEMS GROUP
To:
Shared Package
ML20245J759 List:
References
CON-#389-8838 OL, NUDOCS 8907030151
Download: ML20245J755 (2)


Text

k.

(

. gQKDjRRESfyjNDLftCA l' _W s i. C

+c UNITED STATES OF. AMERICA I

89 JJJ 29 P4 :15 NUCLEAR REGULATORY COMMISSION-1 ATOMIC SAFETY:AND LICENSING BOARD UfT L

..A 00 Chi. H n. <... t hm -

j U

E" Before the' Administrative Judges:

Ivan W.' Smith, Chairperson Dr. Richard Cole I

Kenneth A. McCollom J

)

.)

In the Matter of

)

. Docket Nos.

)

50-443-OL PUBLIC SERVICE COMPANY'OF

)

50-444-OL l

NEW HAMPSHIRE, et al.

)

(Off-site EP) i (Seabrook Station, Units 1 and 2)

)

l l

)

June 27, 1989 ERRATA TO REVISED TESTIMONY OF DR. COLIN J. HIGH ON BEHALF OF JAMES.M. SHANNON,' ATTORNEY GENERAL l

FOR THE COMMONWEALTH OF. MASSACHUSETTS CONCERNING CONTENTION JI-56-(Monitoring Rate) l The following changes have been made to the testimony filed-on June 21, 1989:

Page (Line)

Errata 5 (19)

Repl' ace "i" with "in" 6 (5)

Replace "re" with "are" 6 (6)

Insert " weekend" before l

~~

" beach" l

6 (8)

Insert " Appendix M" after "Vol. 6" 6(8)

Insert the following after

" persons."

"For the'3everly reception i

center the non-beach transients and non-beach 8907030151 890627 employees from outside the ADOCK 05000 3

yDR

,EPZ are then added to the b

l

.. t.

.t 1

combined beach and permanent

' resident populations.

These non-beach populations are taken from the NHRERP Vol. 6, i

Appendix M, pp. 1-2, with the vehicle occupantcy rates of 2.4 and 1.16 applied for transients and employees' i

respectively."

j 6 (9)

Insert " communities" before

" assigned" 1

6'(10)

Replace " communities outside the beach areas" with."to the North Andover reception.

center" l

7 (After the table)

Insert "For the. details of my assumptions and calculations, see Attachment "A" to this

{

testimony."

7 (16)

Replace "21.4" with "2.4" i

1 7 (last)

Replace "14,170" with "14,552" 8 (After page 7)

Insert Attachment "A" COMMONWEALTH OF MASSACHUSETTS JAMES M.

SHANNON ATTORNEY GENERAL h

Allan R. Fierce Assistant Attorney General

$s Nuclear Safety Unit 7

Department of.the' Attorney General One'Ashburton Place Boston, MA 02108-1698 (617) 727-2200 DATED:

June 27, 1989 h

_. - - - - -. _ - _ _.. _