Discusses Allegation of Improper Work Practices Involving nonsafety-related Duck Work in Boric Acid Tank Room.Visual Insp of Approx 90% of All Sides of Ductwork Found No Open Ducts.Subj Allegation Was Not Substantiated
ML20245J567
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/28/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245J571 List:
References
1-864, NUDOCS 8903100103
Download: ML20245J567 (2)


Text

,

+

TOLEDO

)

EDISON C

4 c-anor 6-w camm  !

DONALD C. SHELTON ,

Vce Prescerr,-Nudear (4191249-2300 Docket Number 50-346 License Number NPF-3

,c Serial Number 1-864 0 4

l February 28, 1989 United States Nuclear Regulatory Commission j Document Control Desk '

Vashington, D. C. 20555

Subject:

Allegations of Improper Vork Practices Involving Nonsafety-Related Duct Work in the Boric Acid Tank Room (Allegation RIII-88-A-0057,  !

q Inspection Report.50-346/88034) j Gentlemen:

A special safety inspection was performed by Mr. J. F. Schapker, an NRC l inspector, between October 3 and 5,1988 to investigate an allegation of improper vork practices involving duct work in the Boric Acid Tank Room at Davis-Besse. The inspector's review of Toledo Edison documentation for y Heating and Ventilating and Air Conditioning (HVAC) equipment in the Boric At.id Tank Roon concluded that although the fire dampers assemblies are ]h safety-relate:1, the attaching HVAC duct work was nonsafety-related. Although the NRC inspector performed a visual inspection and observed no obvious defects, the inspection was limited due to the accessibility of the duct work in the Boric Acid Tank Room.

During the NRC Inspectors exit, and as documented in Inspection Report j 50-346/88-034, the NRC recommended the licensee review the accuracy of the  !

concern and if substantiated, verify that like activities did not occur on i safety-related ducts during work performed by the contracting firm involved.

An inspection of the HVAC ducting installed in the Boric Acid Tank Room was

~

performed on October 16, 1988. A visual inspection of approximately 90 percent of all sides of the ductwork and a " hands on" inspection of 50 percent of the ductwork found no open ducts, or areas that look like they had been repaired. In addition, no unusual air flow was detected. Therefore, no conditions were found that warranted further investigation. Thus, Toledo 4'- Edison's review and investigation concludes the subject allegation was not substantiated.

MAR 6 1989 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAO! SON AVENUE TOLEDO, OHIO 43552

(

'M3L&6Ldb HP yh 0

,_ - _ _ _ _ _ _ _ _ _ _ - _ _ . . _ _ . -_ _ ____ -_ _- . _ _ _ . _ - _ _ _ = _ _ _ _ _ _ - - - _ _ _ _ _ _ - _ _ _

w <

bO' '

\

'~ '+ Docket Nu;ber.50-346

' License Number NPF-3 Serial Number 1-864~

. Page 2'.'

7 Schrauder, Nuclear Licensing Manager, at (419) .

. R. V. 249-2366

'Very truly yours,.  ;

/ -

EBS/dlm

\

~ ,

cct.

. H. Byron, DB-1 NRC Resident Inspector A. B. Davis,' Regional Administrator,.NRC Region ~III T. V. Vaabach, DB-l' NRC Senior Project Manager l

l 1  ;

I i

~!i I

a i

l i

i

}

i

'