ML20245J313

From kanterella
Jump to navigation Jump to search
Forwards Engineering Evaluation EE-FP-0015B & Safety Evaluation Re Use of Bearing Water Pump Not Previously Qualified for Use in Fire Protection Shutdown/Cooldown Train a Per Fire Protection Operability Requirement FPOR-16
ML20245J313
Person / Time
Site: Fort Saint Vrain 
Issue date: 06/15/1989
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245J316 List:
References
P-89231, NUDOCS 8906300266
Download: ML20245J313 (3)


Text

.

0 I

l Public Service i

Public Service *

=

co..v c...

P.O. BoxB40 i

June 15, 1989 cenver co 80201- 0840 Fort St. Vrain Unit No. 1 A.' Clegg Crawford P-89231 Vice President Nuclear Operations U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Docket No. 50-267

SUBJECT:

Alternate Compensatory i Measures Instituted Per FPOR-16 1

REFERENCES:

1) PSC letter, 1

i Williams to Doc.

Control Desk, dated March 16, 1989 (P-89077) i

2) NRC letter, Heitner to Williams, dated May 18, 1989 (G-89185)

Gentlemen:

Per (,ur commitment made in Reference (1), this letter submits a copy of Engineering Evaluation EE-FP-0015B and its 10 CFR 50.59 Safety Evaluation for your review and approval. This eveluation involves using a bearing water pump not previously qualified for use in Fire Protection Shutdown /Cooldown Train A per Fire Protection Operability Requirement FPOR-16.

Train A includes the use of Bearing Water Pumps P-2101 and P-2106 to supply bearing water to the operating circulator when this train is used for fire protection shutdown /cooldown.

These pumps were qualified as reliable for this use, in part, based on meeting equipment and electrical separation / segregation criteria defined in Appendix R of 10 CFR 50, as applicable per the Fort St. Vrain Fire Protection Program Plan (FPPP), which was approved by the NRC in Reference (2).

8906300266 890615 PDR ADOCK 05000267 A,

i F

PNU

>M g6h A

b

'I w

Y W-

\\

P-89231 June 15, 1989 EE-FP-0015B evaluates using P-2101-S in combination with P-2101 or P-2106 when the need arises.

It was determined that P-2101-S meets proper equipment separation.

However, adequate electrical cable separation from Train B components does not exist.

EE.FP-0015B and its Safety Evaluation conclude that P-2101-S ma)- be used in combination with P-2101 or P-2106, with certain compensatory

measures, to meet Train A requirements per FPOR-16.

Please see the attached evaluations for more information.

Should you have any questions or comments concerning this issue, please contact Mr. M. H. Holmes at (303) 480-6960.

Very truly yours, 42.. & !ll A. Clegg Crawford Vice President Nuclear Operations ACC/GMK/km Attachment cc: Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain