Forwards Safety Insp Rept 50-346/89-02 on 890109-0209.No Violations Noted.Review of Concerns Re Adequacy of Evaluations Conducted,Per 10CFR50.59 Request
ML20245J230
Person / Time
Site: Davis Besse 
Issue date: 02/28/1989
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20245J236 List:
References
NUDOCS 8903060213
Download: ML20245J230 (2)


See also: IR 05000346/1989002

Text

_

.

.

,

.L

.

.,

,.

,

FEB 2 8 1939

.

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donald Shelton

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. Hasse

and T. Vandel and Ms. A. M. Bongiovanni of.this office on January 9 through

February 9, 1989, of plant modifications and engineering assurance at

Davis-Besse Nuclear Power Station authorized by NRC Operating License

No. NPF-3 and to the discussion of our findings with Mr. P. Hildebrandt and

others of your staff at the conclusion of the onsite inspection on January 13,

1989, and further discussions with members of your staff on January 27 and

February 9, 1989.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection; however, we request that you carefully review our concerns with

the adequacy of your evaluations conducted pursuant to 10 CFR Part 50,

Section 50.59 described in Paragraph 2.a of the attached inspection report.

While the safety evaluations performed for the modifications reviewed were

thorough and well documented, the evaluation with respect to all of the

10 CFR 50.59 criteria may not always be as rigorous as it should.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

i\\

  1. [-ff[

8903060213 8902'28

/

PDR

ADOCK 05000346

C-

__ A

P10C

'


,n-

w.

.

.

l s .? , _

,

  • '

,

.1

FEB 2 81989 -

-

^

Toledo Edison'CompanyL

2

We will' gladly discuss any questions you have concerning th'is inspection.

~

',

Sincerely,

f

MM.!!$. SIGNED Dy HUBERI J. ].gl.l.b}

H2'J. Miller,' Director..

Division'of Reactor Safety

Enclosure:.-Inspection Report

No. 50-346/89002(DRS)-

r

cc w/ enclosure:

L. Storz, Plant Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris,. State of Ohio

,"

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

p-

..

Utilities Commission

1

i.

RIII 1

Rill

RIII

II{VM RI

I

RIII)

g=assepja\\@, w m a s yanni

- illips D

y te

w

-

<*

pWight

a

er

il

w

Vandel Bongio

f

_ _ _ _ . _ _ _ _ _ _ - - -