Forwards Insp Rept 50-285/89-02 on 890130-0203 & Notice of Violation
ML20245J166
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/27/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20245J170 List:
References
NUDOCS 8903060190
Download: ML20245J166 (2)


See also: IR 05000285/1989002

Text

c

'*

.e

'

.

,

'

3

,

,

,

' * ' . , ' * -

.

,

-

.

,

7

.

.

,

'

i

p

,

lIn.' Reply Refer To:

Docket: .50-285/89-02'

1

,

Omaha Public Power District

j

4

ATTN:

Kenneth J. Morris,. Division Manager

j

Nuclear Operations

u

1623 Harney. Street

Omaha, Nebraska '68102

.

Gentlemen:

'

This refers to~the inspection conducted by Messrs. H. F. Bundy and T.'O.

.McKernon, of this office during the period January 30 through February 3,1989,

of' activities. authorized by NRC Operating License DPR-40 for Fort' Calhoun-

-Station,_and to-the discussion of our findings with Mr. W. G. Gates ~and other-

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included low power physics tests, reactor

thermal shield sway test results, and review of a complex surveillance.

- Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and observa-

tions by the NRC inspectors.

The inspection findings-are documented in the

enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to-

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

,

[*

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

@ $$$ $bb

2

S

1.

G

L. J. Callan, Director

Division of Reactor Projects

cc w/ enclosures: .(see next page)

  • RIV:TPS
  • TPS
  • C:TPS

D:DRS *

D:Dk

HFBundy/tw

TOMc erno

WCSeidle

JLMilhoan

LJCallan

'

/ /89

7/t1/89

/ /89

/ /89

% /89

fp

/

I

  • previously concurred

'

'r

.

I

= - -

=

w

M

, . . ,

,

~

. + .

.

'

t. ;

Omaha'Public. Power District

-2-

s

Enclosures:

,

1.f; Appendix A - Notice of Violation

f

' '

2.

Appendix B

NRC Inspection Report

50-285/89-02

<

cc w/ enclosures:

e

Fort Calhoun Station

-

ATTN:

W. G. Gates, Manager

P.O. Box 399

Fort.Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

.

'

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C.

20036

"

Nebraska Radiation Control: Program Director

bec-to DMB (IE01)

bec distrib.' by RIV:

'

  • R.D. Martin, RA

.

  • RPB-DRSS
  • Section' Chief (DRP/B)
  • MIS System
  • RIV File

- DRP

  • RSTS, Operator'

'* Project Engineer, DRP/B

Lisa Shea, RM/ALF

  • DRS (2 copies)
-e

.. *P. Milano, NRR Project Manager (MS:

13-D-18)

  • RRI
  • W. C. Seidle
  • H. F. Bundy
  • T. O. McKernori
  • G. F. Sanborn
  • w/766

t