lIn.' Reply Refer To:
Docket: .50-285/89-02'
1
,
Omaha Public Power District
j
4
ATTN:
Kenneth J. Morris,. Division Manager
j
Nuclear Operations
u
1623 Harney. Street
Omaha, Nebraska '68102
.
Gentlemen:
'
This refers to~the inspection conducted by Messrs. H. F. Bundy and T.'O.
.McKernon, of this office during the period January 30 through February 3,1989,
of' activities. authorized by NRC Operating License DPR-40 for Fort' Calhoun-
-Station,_and to-the discussion of our findings with Mr. W. G. Gates ~and other-
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included low power physics tests, reactor
thermal shield sway test results, and review of a complex surveillance.
- Within these areas, the inspection consisted of selective examination of
- procedures and representative records, interviews with personnel, and observa-
tions by the NRC inspectors.
The inspection findings-are documented in the
enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to-
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
,
[*
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
@ $$$ $bb
2
S
1.
G
L. J. Callan, Director
Division of Reactor Projects
cc w/ enclosures: .(see next page)
- RIV:TPS
- TPS
- C:TPS
D:DRS *
D:Dk
HFBundy/tw
TOMc erno
WCSeidle
JLMilhoan
LJCallan
'
/ /89
7/t1/89
/ /89
/ /89
% /89
fp
/
I
- previously concurred
'
'r
.
I
= - -
=
w
M
, . . ,
,
~
. + .
.
'
t. ;
Omaha'Public. Power District
-2-
s
Enclosures:
,
1.f; Appendix A - Notice of Violation
f
' '
2.
Appendix B
NRC Inspection Report
50-285/89-02
<
cc w/ enclosures:
e
Fort Calhoun Station
-
ATTN:
W. G. Gates, Manager
P.O. Box 399
Fort.Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
.
'
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D. C.
20036
"
Nebraska Radiation Control: Program Director
bec-to DMB (IE01)
bec distrib.' by RIV:
'
- R.D. Martin, RA
.
- RPB-DRSS
- Section' Chief (DRP/B)
- MIS System
- RIV File
- DRP
- RSTS, Operator'
'* Project Engineer, DRP/B
Lisa Shea, RM/ALF
- DRS (2 copies)
- -e
.. *P. Milano, NRR Project Manager (MS:
13-D-18)
- RRI
- W. C. Seidle
- H. F. Bundy
- T. O. McKernori
- G. F. Sanborn
- w/766
t