Forwards EGG-NTA-8244, Conformance to Generic Ltr,Item 2.1 (Part 2) Reactor Trip Sys Vendor Interface,Zion Nuclear Generating Station Units 1 & 2, Technical Evaluation Rept. Response Acceptable
ML20245J131
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/27/1989
From: Chandu Patel
Office of Nuclear Reactor Regulation
To: Bliss H
COMMONWEALTH EDISON CO.
Shared Package
ML20245F307 List:
References
GL-83-28, TAC-52895, TAC-52896, NUDOCS 8903060179
Download: ML20245J131 (4)


Text

'

t.

3sg -

n;

'u: [

February 27,L1989 " '

E r

( F ockek D Hos.:L 50-295 and 50-304. *

'Mr. Henry E. Bliss? -

Nuclear. Licensing Manager:

m ' Commonwealth Edison Company'~

4

, Post Office. Box 767 iChicago; 1111nois: 606901 -

Dear Mrf Bliss:

y i

SUBJECT:

IGENERIC LETTER 83-28FITEM 2.1 (PART 2), VENDOR INTERFACE PROGRAMS -

'RTSCOMPONENTS,1ZIONSTATION, UNITS 1AND2(TACNOS.52895AND5'2896)-

M.GenericLetter.83-28.

they.have? established an Item'2.1-(Part2),requiredalllicenseestoconfirmthat interface with either the NSSS~ vendor or with the H vendors of;each'of'the components of their reactor. trip system. The' licensees.

V- were also expected to confirm that this" interface program.includestperiodic communication between licensee and the vendor, and a system of_ positive feedback.

. ' which confirms receipt by theilicensee of transmittals of technica1'information.-

Our contractor-(EG&G) has reviewed your' response to this item and prepared the .N enclosed ' Technical Evaluation Report:(TER) which finds your response to be acceptable.

4 - nThe. staff has reviewed the-TER and concurs w'th i EG8G's findings. We therefore consider this item'to be closed.

1:

Sincerely,

~

~

Chandu P. Patel, Project Manager Project Directorate III-2 Division of-Reactor Projects III -

IV, Y and Special Projects

Enclosure:

As stated cc: See next page o' DISTRIBUTION

- g B 5iiE E T I Te M i2 g OGC

' NRC

& Local PDRs EJordan

' GHolahan _. BGrimes

..MVirgilio ACRS~(10) 1

~LLuther CPatel y -SBajwa- OP0'j

' l C/O PDIII-2 PDIII-2 PDM,Tef M

LLuthe . CPatel DFW 2/A(/89 -2/fS/89 2/M/89 8903060179 890227 PDR ADOCK 05000295

.________m__ _ _ _ _ _ _ _ _ P _ _. PDC __ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1 .-

. ~ ,: .

February 27, 1989

=

Docket Nos.: 50-295 and 50-304 Mr. Henry E. Bliss Nuclear Licensing Manager Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

~

Dear Mr. Bliss:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.1 (PART 2), VENDOR INTERFACE PROGRAMS -

g RTS COMPONENTS, ZION STATION, UNITS 1 AND 2 (TAC NOS. 52895 AND 52896)

Generic Letter 83-28, Item 2.1 (Part 2)' required all licensees to confirm that they have established an interface with either the NSSS vendor or with the vendors of each of the components of their reactor trip system. The licensees were also expected to confirm that this interface program includes periodic communication between licensee and the vendor, and a system of positive feedback which confirms receipt by the licensee of transmittals of technical information.

Our contractor (EG&G) has reviewed your response to this item and prepared the '

- enclosed Technical Evaluation Report (TER) which. finds your response to be acceptable.

The staff has reviewed the TER and concurs with EG8G's findings. We therefore-consider this item to be closed.

Sincerely, >

Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects III -

IV, Y and Special Projects

Enclosure:

As stated cc: See next page DISTRIBUTION Docket file OGC

'NRC & Local PDRs EJordan GHolahan BGrimes MVirgilio ACRS(10) .

LLuther CPatel l SBajwa l

PDIII-2' PDI 2 PD  ;

3 LLuthe CPatel DF l 2/A//89 2/fS/89 2//7 89

/ l 1

__ - )

,4 m .

,. . g '*q T yjo#*"N'o UNITED STATES I8 n NUCLEAR REGULATORY COMMISSION

, 7:; j- wAsHWGTON, D. C. 20555

\ ....

/1 . February 27, 1989

. Docket Nos.:-~50-295 and 50-304 Mr. Henry E. Bliss Nuclear Licensing Manager Commonwealth' Edison Company

,- Post Office Box 767

. Chicago, Illinois 60690

Dear Mr. Bliss:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.1-(PART 2), VENDOR. INTERFACE PROGRAMS -

, RTSCOMPONENTS, ZION' STATION,' UNITS 1AND2(TACNOS.52895AND52896).

Generic Letter'83-28. Item 2.1 (Part 2) required all licensees to confirm th'at' they have established an interface with either the NSSS vendor or with the vendors of each of the. components of their reactor trip system. The licensees

, were also expected to confirm that this interface program includes periodic communication between licensee and.the vendor, and a system of positive feedback' which confirms receipt by the licensee of transmittals of technical information.

Our contractor (EG&G) has reviewed your response to this item and prepared the enclosed Technical Evaluation Report (TER) which finds your response to be acceptable.

The staff has reviewed the TER and concurs with EG8G's findings. We therefore consider this item to be closed.

Sincerely, N

Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects III -

IV, Y and Special Projects

Enclosure:

As stated cc: See next page

. p .-

,;. *7 -

P

- Mr. ' Henry E. Bliss - Zion Nuclear. Power Station Commonwealth Edison Company Units 1 and 2~ '

cc:

Robert J.-Vollen,.E quire' . Mr; Michael C. Parker, Chief

' ~109 North Dearborn Street-Division of Engineering-.

-Chicago,1 Illinois 60602 Illinois. Department of Nuclear-

. Safety..

Dr. Cecil Lue-Hing.. .

'1035 Outer Park Drive, 5th Floor

' Director of.Research and Development Springfield, Illinois 62704.-

Metropolitan Sanitary District '

-of Greater Chicago-100': East Erie Street-Chicago, Illinois 60611;.

Phillip.Steptoe, Esq.

Sidley and-Austin One First National Plaza Chicago, Illino:s.60603

! Mayor of Zion-L ' Zion, Illinois 60099 Illinois ~ Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer. Park Drive,. 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulstory Comission Resident Inspectors Office 1 105 Shiloh Blvd.

Zion, Illinoi_s 60099 Regional. Administrator, Region III U.S. Nuclear. Regulatory Comission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 l

u

_ - _ _ - _ - . _ _ l