Forwards Insp Rept 50-267/89-01 on 890109-13 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21). Util Taken Prompt Action on Intent of IE Info Notice 86-033
ML20245H987
Person / Time
Site: Fort Saint Vrain 
Issue date: 02/22/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245H990 List:
References
IEIN-86-033, IEIN-86-33, NUDOCS 8903060119
Download: ML20245H987 (2)


See also: IR 05000267/1989001

Text

,

,

',

  • R'-

.J

r iOCUMENT CONTAINS

i

SAFEGUARDS INFORMATl014

In Reply Refer To:

FEB 221989

-

.

Docket: .50-267/89-01

Public Service Company of Colorado.

ATTN:

Robert O. Williams, Jr., Senior

!

Vice President, Nuclear Operations

.

P.O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Messrs R. A. Caldwell and A. B.

Earnest of this office during the period January 9-13, 1989, of activities

authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear

Generating Station, and-to the discussion of our findings with Mr. R. Novachek

and other members of your staff at.the conclusion of the inspection.

The inspection reviewed certain areas of your physical security program.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. -The areas inspected and the inspection

findings ~are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of'NRC requirements. These violations are discussed in the Notice of-

Violation enclosed with this letter. The NRC inspectors reviewed your-

corrective actions related to these violations which included.immediate

. corrective steps and corrective steps which will be taken to avoid future

violations. We consider these corrective actions to be adequate and no

response to the Notice of Violation is required.

It is our opinion that had

your staff taken prompt action on the intent of Information Notice 86-33,

Violation 267/8901-02 could have been discovered much earlier.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover i.m which is an inspection

summary, will ng be placed in the Public Document Room.

RI

S:RPB

SEPS:RP

C:S M

C:R

DRSS

C/PS

RP

est:gb

RCald q

JEve d t BMu

Bangart

TWesterman JLCallan

89

g/b

9

6/d/89

t/if/89 >/g,/89

/ /89

p/h/89

t

g

8903060119 890222

/89

PDR

ADOCK 05000267

o

PNU

ENCLOSURE CONTAINS

<

DOCUMENT CONTAINS

SWUARDS INFORMATION

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

,

PAGE IS DECONTROLLED

L

- - - - - - - -._ ,

>

.

o

- 4 . .K i -

..

,

b>

-

_

Public Service Company'of Colorado

2

.Should you have any questions concerning this inspection, we will be pleased to:

discuss them with you.

' Sincerely,

1

J. Milhoan, for:

L.' J. Callan, Director

Division of Reactor Projects

cc_w/ summary page only:

Fort St. Vrain Nuclear.. Station

ATTN:

C. Fuller, Manager, Nuclear

Production Division'

16805 WCR 19h

~Platteville, Colorado 80651

Fort St. Vrain: Nuclear Station

ATTN:

P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 19h

,

Platteville,~ Colorado 80651

Colorado Radiation-Control. Program Director

Colorado Public Utilities Commission

bec copy of-entire report:

RIV Security File

P. A. Starcher, RSGB/NRR

R. D.- Martin, RA

R. L. Bangart,-DRSS

Chief, RPB

Section Chief, SEPS:RPB

Security Inspector

Resident Inspector

SEPS:RPB File

G. F.~Sanborn, E0

D. M. Crutchfield, NRR

bec copy of letter and inspection summary only w/766:

DRP

MIS,

RSTS Operator-

Lisa Shea, RM/ALF

Section Chief, DRP/B

RIV File

R.' E. Hall, DRSS

Project Engineer, DRP/B

bec copy of letter and inspection summary only w/out 766:

DMB IE-04

DRS

K._Heitner, NRR Project Manager

ENCLOSURE CONTAINS

SAFEGUARDS INFORMA110N

UPON SEPARATION THIS

PAGE IS DECONTROLLED

1

-

.

)