Responds to NRC Bulletin 88-003 Re GE latching-type Hfa Relays Installed in Class 1E safety-related Applications. No Relays Identified as Installed or Spares for safety- Related Applications
ML20245H700
Person / Time
Site: North Anna 
Issue date: 06/22/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
88-138B, IEB-88-003, IEB-88-3, NUDOCS 8906300056
Download: ML20245H700 (3)


Text

- _ _ - _

m-l,

.,l c:

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 22,1989 United States Nuclear Regulatory Commission Serial No.

88-138B Attention:

Document Control Desk NAPS /JHL Washington, D.C.

20555' Docket No.

50-338 License No.

NPF-4 Gentlemen:

= VIRGINIA ELECTRIC AND-POWER COMPANY NORTH ANNA POWER STATION UNIT 1 REFPDEE TO NRC BULLETIN NO. 88-03 The subject bulletin requested licensees to perform inspections of their facilities to ensure GE latch %g-type HFA relays installed in Class 1E (safety-related) applications have adequate latch engagement. Relays that failed to meet the specified acceptance criteria provided in the bulletin were required to be repaired or replaced.

No GE HFA latching-type relays were identified as installed or spares for safety-related applications. There were, however, seven GE HFA latching-type relays identified as installed in nonsafety-related circuits. These included six GE Century Series Type HFA 154 relays and one GE non-Century Series Type HFA 54 relay.

In addition, seven GE Century Series Type HFA 154 relays were identified as warehouse stock inventory at North Anna.

These relays were inspected in accordance with GE SAL 190.1 during the 1989 refueling outage for North Anna Unit 1.

One of the Unit 1 installed GE

~ Century Series Type HFA 154 relays failed the GE SAL 190.1 inspection and was replaced.

In addition, one relay passed the GE SAL 190.1 inspection but was replaced due to a reset coil failure.

These relays were replaced from stock with relays which were successfully tested prior to installation.

The above information is true and accurate to the best of my knowledge.

l l

Should you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, L

,/n

'h n h W. L. Stewar Senior Vice President - Power 9906300056 890622 5

/

PDR ADDCK 0500033Gg G

PNU %

l

cc:

U. S. Nuclear Regulatory Commission Region II-L

_'101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Mr. J..L. Caldwell NRC Senior Resident Inspector North Anna Power Station l

1

i i

  • ,,~

1

)

4 COMMONWEALTH OF VIRGINIA )

l

)

C0lRiTY OF HENRICO

)

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. R.

Cartwright who is Vice President Nuclear, of Virginia Electric and Power Company.

He is duly authorized to l

execute and file the foregoing document in behalf of that Company, and the l

statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this c2B day of bu#r

, 19 89 My Commission expires:

//3Azuum J

1.' 94

~

d th/ I//d Notary' Public 1

i (SEAL)