ML20245H600

From kanterella
Jump to navigation Jump to search
Advises That Commitment to Implement Mechanical Fluid Sys Open Items F-33 & F-37,in Response to NRC Design Validation Insp Program Insps by 890626,delayed.Open Items Will Be Completed Prior to Unit 1 Fuel Load
ML20245H600
Person / Time
Site: Comanche Peak  
Issue date: 06/26/1989
From: William Cahill, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89439, NUDOCS 8906300015
Download: ML20245H600 (1)


Text

,,

-l i,,, i / e MM

' Log # TXX-89439 L

L 4

File # 10130 f'

C C

'IR.87-37

~~

Ref. # 10CFR2.201(a) 1UELECTRIC June 26, 1989 WHliam J. CahiH, Jr.

Executive Vke l*residm U. S. Nuclear, Regulatory Commission

' Attn: Document Control Desk.

Washington, D. C.

20555-

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 REVISIONS REGARDING RESPONSES TO NRC DESIGN VALIDATION PROGRAM INSPECTIONS REF:

1) TU. Electric letter.TXX-89059, dated February 15, 1989 Gentlemen:

Reference 1) scheduled a commitment with respect to mechanical fluid systems open items F-33 and F-37 to be implemented by June 26, 1989. The revised schedule. completion dates for these open items will be prior to Unit I fuel load.

Documentation will be available for your review after the completion of.

l these items.

Sincerely, t/1

,,)

William J. Cahill, Jr.

i By:

R. D. Nalker Manager, Nuclear Licensing MCP/vid c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

{\\

.h6300015390626 ADOCK 0500o445 d g PDC

\\

KD North Olive Street LB of Dallas, Texas 75201