ML20245G947

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1989 for Sequoyah Nuclear Plant & Rev 22 to Offsite Dose Calculation Manual Changes
ML20245G947
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/15/1989
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245G952 List:
References
NUDOCS 8908160262
Download: ML20245G947 (1)


Text

,. - _ -. -

p TENNESSEE VALLEY AUTHORITY CH ATTANOOGA TENNESSEE 37401 SN 157B Lookout Place Alj015 B89 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In the. Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - JULY 1989 MONTHLY OPERATING REPORT Enclosed is the July 1989 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please call R. R. Thompson at (615) 843-7470.

Very truly yours, i

TENNESSEE VALLEY AUTHORIlf ManageY, Nucle % 4 y7 ar censing and Regulatory Affairs Enclosure cc (Enclosure):

INP0 Records Center Mr. Ted Marston, Director Institute of Nuclear Power Operations Electric Power Research Institute 1100 Circle 75 Parkway, Suite 1500 P.O. Box 10412 Atlanta, Georgia 30389 Palo Alto, California 94304 Regional Administration Mr. B. A. Wilson, Assistant Director U.S. Nuclear Regulatory Commission for Inspection Programs Office of Inspection and Enforcement TVA Projects Division Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Region II Atlanta, Georgia 30323 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. B. D. Liaw, Director TVA Projects Division NRC Resident Inspector One White Flint, North Sequoyah Nuclear Plant 11555 Rockville Pike 2600 Igou Ferry Road Rockville, Maryland 20852 Soddy Daisy, Tennessee 37379 fe'l

\\

l Q!S160262e90733 R

ADCCK osooo327 PDC An Equal opportunity Employer

. - - -