ML20245F955
| ML20245F955 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/15/1989 |
| From: | Wilson B Office of Nuclear Reactor Regulation |
| To: | Kingsley O TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8906280302 | |
| Download: ML20245F955 (3) | |
Text
-
u Y
ggg 4
g l,
,,.n Docket Nos.: 50-327, 50-328.
,.g Mr. Oliver D. Kings 1,ey, Jr..
Senior Vice President, Nuclear Power Tennessee Valley Author.ity.
6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
Dear Mr. Kingsley:
SUBJECT:
. CONFIRMATION OF. MEETING - SEQUOYAH DOCKET NOS. 50-327 and-50-328 This? confirms'~ the telephone conversation between Mr.. M1 Burzynski,, Sequoyah:
Acting Site Licensing Manager, TVA and e Mr. J. Brady, Acting Sequoyah Section Chief, ;NRC ~ on June : 13,.)1989, concerning. an Enforcement Conference to be conducted = at. Room 2F21, : White-Flint Building in Rockville, Maryla.nd, on.
June 29',1989,.at 9:00. a.m..The purpose. of this. meeting is to disc *uss three
~
issues - which indicate apparent weaknesses in.the ' implementation of your:
programs.__These-issues -are-the RHR events reported in LER 89-011, the BIT '.
. recirculation ' ' issue, - and - the Source: Range / Intermediate. Range' detector.
' relocation issue.
7 A proposed agenda for the Enforcement Conference -is enclosed.
Should - you have any questions' regarding 'these arrangements, we will be pleased:
to discuss.them.
Sincerely, Originntsigned By BRUCE A. WILSON Bruce A. Wilson, Assistant Director for Inspection Programs TVA Projects Division Office of Nuclear Reactor Regulation
Enclosure:
(See page 2)
N 0906280302 890615ADOCK 05000327 h DR e
/ g PNU x
Tfral
~_--
.., s g a
~
Mr. Oliver D. Kingsley, Jr.
2
~
cc w/ enc 1:
F. L. Moreadith, Vice President, Nuclear Engineering M. O. Medford, Vice President and Nuclear Technical Director County. Judge, Hamilt,on County Courthouse Dr. Henry Myern science Advisor J. L. LaPoint, Site Director Sequoyah Nuclear Plant M. J. Ray, Acting Director Nuclear Safety and Licensing M. Burzynski, Acting Site Licensing Manager TVA Representative, Rockville Office General Counsel, TVA 3
State of Tennessee bcc w/ enc 1:
D. M. Crutchfield, i:RR B. D. Liaw, NRR S. C. Black, NRR R. C. Pi.ers_on, NRR -
B. A. Wilson, NRR/RII J. B. Brady, NRR/RII B. B. Desai, NRR/RII J. Rutberg, OGC NRC Resident Inspector
@ RC Document Control Desk i
NRR/RII l/A dim JErady 6/f/89 6//5 /89 f
r7-
~
JUN I 51889 ENCLOSURE MEETING AGENDA TENNESSEE VALLEY AUTHORITY JUNE 29, 1989, 9:00 a.m.
I.
Opening Remarks, NRC II Issues of Concern NRC/TVA TVA's apparent failures related to 10 CFR 50.59 implementation, procedural adequacy and compliance, and Technical Specification operability for the following events:
A.
RHR events described in LER 89-011 B.
Removing the BIT from Recirculation C.
SR/IR Detector Relocation Discussion to include for each event:
W
_ hy reviews pursuant to 50.59 did not identify unreviewed safety questions and the consequences involved in each of these events prior to their occurrence Why procedures were either inadequate or not followed for each of these events Why corrective actions for previous.imilar viola.tions did not prevent these events l
Why operators vere unaware of the conditions and/or their consequences on operability for these events What corrective actions have or will be implemented to prevent recurrence of these events III. Closing Remarks NRC 1
3