ML20245F858
| ML20245F858 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/15/1989 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8906280270 | |
| Download: ML20245F858 (1) | |
Text
'
g
.r.
p%
- pV 3
C na Deus POWER COMPANY
' P.O. box 33189.
H BAL B. TUCKER.
CHARLorIE. N.c. 98949 '
l; s
m retersiosrs
' sb
_. vias emmamene.
(y04) 373-4831
~ wuotum renomenon June 15,.1989
'U. S. Nuclear' Regulatory Commission
- Washington, D.C. 20555' Attention: Document Control Desk i
Subject:
'McGuire Nuclear' Station Docket.Nos. 50-369, 370 tInspection Report Nos. 50-369, 370/88-33 Notice of. Corrective Action Delay Gentlemen:-
In my: letter 'of March 16, 1989, Reply to a Notice of Violation,-Inspection Report-Nos..50-369, 370/88-33,-I committed that corrective actions for violation-369/370/88-33-09'would be complete by June 1, 1989.. While some of these corrective actions have been completed, we have expanded the scope of. work'on others. Upon: reviewing maintenance and I&E procedures.for resetting travel stops and repositioning manual throttic valves we discovered that more procedures would-require revisions.with more-detail than was originally planned. Due to this broadened scope of work, corrective actions for this violation will not be complete until December 1, 1989.
'This delay is considered to be of no significance with respect to.the health and safety of the public.
Should there be any questions concerning this matter, contact W. T.'Byers at-
.(704) 373-6194.
'Very truly yours, 1
74 Hal B. Tucker WTB65/lcs.
. xc:
Mr. S. D. Ebneter Mr. P. K. VanDoorn
-Regional Administrator, Region II Sr. Resident Inspector U..S. Nuclear Regulatory Commission McGuire Nuclear Station 101 Marietta St., NW,. Suite 2900 Atlanta, Georgia' 30323 Mr. Darl Hood U. S Nuclear Regulatory Commission Office of. Nuclear Reactor Regulation Washington, D.C.
20555 f
8906280270 890615 I
PDR ADOCK 05000369 s
-g O
_L
- N
.E