Informs That 30-day Written RO Rept Not Required for Event Involving Exceeding Containment Allowable Type a Leakage, Based on Closed Sys Piping Integrity Verification
ML20245F752
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/24/1989
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-297, NUDOCS 8905020482
Download: ML20245F752 (2)


Text

_ _.

g

> g,[

N L

RICHMOND, VIRGINIA.23261 L' '

April 24, 1989 m

- W. R. CART'WRIGifT.'

VICE PRESIDENT-NdCLEAR U. S. Nuclear Regulatory Commission Serial No.89-297 Attn: Document Control Desk NAPS /PAK:Jmj Washington, D. C. 20555 Docket No.

50-339 License No.

N P F-7

)

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 2 i

CHANGE IN DEPORTABILITY lOn March 13, 1989, a four hour report, pursuant to the requirements of 10 CFR 50.72(b)(2)(i), was made for exceeding the Unit 2 containment allowable Type A leakage. Subsequent evaluations have determined this event to be non-reportable, based on closed system piping integrity verification. The minimum pathway leakage, for each affected penetration, was measured and the results subsequently reduce the calculated Type A leakage to within the limits of Technical Specifications 3.6.1.2.

Due to the change in deportability, a thirty day written report is not required. This was discussed with the NRC Operations Center at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br /> on April 10,1989.

l if you have further questions, please contact us.

j j

Very truly yours, t

'W. R. Cartwright kk 9

K S

g

W;'w:n;f

~ 'G

~

~ -- ~ - ~

'T

, m _;.

9 ;

9_,

~j s

,c s

,h h,.

e i;.-

A y~,'

oc: ~ U. S. Nuclear. Regulatory Commission 101. Marietta Street, N.W.

Suite 2900.

Atlanta, GA ' 30323 Mr.-J. L. Caldwell NRC Senior Resident inspector e

North Anna Power Station

.a >

9;;t :

i<

'9

_.-_-_m_

__