1
1
21 APR 1989
Docket No. 50-353
Philadelphia Electric Company
ATTN:
C. A. Mc Neill
T
Executive Vice President - Nuclear
.
Correspondence Control Desk
P.O. Box 7520
Philadelphia, PA 19101
Gentlemen:
Subject:
Systematic. Assessment of Licensee Performance (SALP) Report Number
50-353/87-99
This refers to the Systematic Assessment of Licensee Performance (SALP) of the
L4merick Generating Station Unit 2 for the period of August 1987 to December
1988, initially forwarded to you by our March 15, 1989 letter (Enclosure 1).
This SALP evaluation was discussed with you and your staff at a meeting held
on March 30, 1989 (see Enclosure 2 for attendees). We have determined that no
changes are necessary to the SALP report which is being transmitted as the
final report (Enclosure 3).
Our overall assessment was that you and your staff have continued to maintain
very good controls over the construction activities and have effectively
addressed weaknesses identified in the previous SALP report.
In addition,
your efforts to prepare for startup including verification of construction and
design activities, and preoperational testing have been comprehensive and well
managed.
We appreciate your cooperation.
Sincerely,
ORiGEL SENED BY:
!WES M. ALLM1
_y
W. T. Russell
Regictal Administrator
Enclosures:
1.
March 15, 1989 Letter from NRC to PECo transmitting SALP Board Report.
2.
Attendees at Limerick 2 SALP Management Meeting.
3.
Final SALP Report.
h
Obk
O
OFFICIAL RECORD COPY
SALP COVER LETTER / LIM 2 - 0001.0.0
04/19/89
//
l
O
'\\
j
/
-
1'
_ _ - _ _ - _
_____a
c
.,
,
t~
L ,., ,
.-
,
-
,
,
Philadelphia Electric. Company
2
21 APR 1888
cc w/ enc 1:
John S. Kemper, Sr., Senior Vice President
S. Joseph Kowalski, Vice President, Nuclear Engineering
W. T. Ullrich, Superintendent, Limerick 2 Project
A. S. MacAinsh, Quality Assurance Manager
Graham M. Leitch, Vice President, Limerick Generating Station
-J. W. Gallagher,.Vice President - Nuclear
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
Dave Honan
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
.K. Abraham, PA0 (17)
Chairman Zech
Commissioner Roberts
Commissioner Carr
Commissioner Rogers
Commissioner Curtiss
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Sectior Chief, DRP
Robert J. Bores, DRSS
)
J. Liebe rman, OE
T. Martin, DRS
M. Knapp, DRSS
J. Taylor, DEDR
M. Miller, SLO
W. Russell
-J. Allan
D. Holody
Management Meeting Attendees
T. Kenny, SRI Limerick 1
R. Fuhrmeister, RI, Limerick 2
RI:
P
R DP
P
Williams /rh1
Linville
gWenzinger
fe
an
issell
4
89
4/)/89
4/p/89
4/d/89
4/7 0/89
4/N89
0FFICIAL RECORD COPY
SALP COVER LETTER / LIM 2 - 0002.0.0
04/18/89
)
<
_w--- _ . . . - _ . . - _ _ _
. - - _
-
_--
~
5 i
.:
.
ATTACHMENT'1
-
- i;
phi " 00
9'%g
4
UNITED STATES
g
I
'
4,
iS-
4 NUCLEAR REGULATORY COMMISSION
ij-
i
' d]'
'
14ECHON 1
475 at t 8mmALE MOAD
90NG OF Pf9USSIA. PENNSYLVANIA 19406
.
1b MAR 1989
Docket No'. 50-353
Philadelphia Electric Company
ATTN:
C. A. Mc Neill
. Executive Vice President - Nuclear
Correspondence Control Desk
P.O. Box 7520
Philadelphia, PA 19101
- -
Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP)
Report Number 50-353/87-99
On February 22, 1989 the NRC Region I SALP Board reviewed and evaluated the
performance of activities associated with the Limerick Generating Station Unit 2
for.the period from August 1987 to December 198o
This assessment is
documented in the enclosed SALP Board Report. We will contact you to schedule
a meeting,to discuss the SALP evaluation.
This assessme'nt has covered the completion of final construction activities
and the transition to the conduct of preoperational testing. We envision that
'
this will be the last SALP that will address Unit 2 separately from Unit 1.
At the SALP management meeting, please be prepared to discuss your evaluation
of our assessment. Additionally, we solicit your written comments within 30
days after the meeting.
We appreciate your cooperation. Should you have any questions concerning the
SALP report, we would be pleased to discuss them with you.
Si ncerely',
'
d(1/
William T. Russell
Regional Administrator
Enclosure:
NRC Region I SALP No. 50-353/87-99
.
i
ee*o D
EW
i
i
._ _
_.
,
e
-
-)..
-
,
,
e .
LPhiladelphiatElectric Company
2
cc w/ encl:
John S. Kemper, Sr., Senior Vice President
S. Joseph Kowalski, Vice President, Nuclear Eng.ineering
W. T. Ullrich, Superintendent, Limerick 2 Project
S. MacAinsh, Quality Assurance Manager - Limerick
Graham M. Leitch, Vice President, Limerick Generating Station
J. W. Gallagher, Vice President - Nuclear
Troy B. Conner, Jr. ,' Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
Dave Honan
Public Document Room (PDR)'
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
,
Commonwealth of Pennsylvania
K. Abraham, PA0 (17)
Chairman Zech
Ccmmission Roberts
Commissioner Carr
Commissioner Rogers
Commissioner Curtiss
l
. . _
J
w .
,,,;
-
-- -
- - - - - - - - - - - - - -
Y
']
s
$
.c. j
'
- s % -
'
, :
.c
L',
-f.; ,
'~
,
- y'-
-
].f ggg
Philadelphia Electric; Company
3 -:
-3
+
'
'
,<
,
',l
l-
O'
bec w/ enc 1:
.
.
i
,
,
4'
Region I Docket Ro'om (with concurrences)
Management Assistant, DRMA (w/o enc 1)-
L.
. Section Chief,'DRP
b,:
. Robert 'J,f Bores, DRSS .
l ,,
- J. Lieberman, OE
T.. Martin, DRS-
S. : Ebneter,- DRSS -
E'
'J. Tayler, DEDR
j
M.: Miller,. SLO
W.' Russe 11i
)
J.'Allan.
- D. Holody:
- Board Members-
. T. Kenny, SRI Limerick 1
- R. Fuhrmeister, RI, Limerick 2
1
,
-
y
l
,
l
,
i
\\
)
)
i
l
.._.s
-
--.
_ .-.
__
_ _- - _ .
___ .- __.- _ - . _ _ _ - - _ _ - - _ - _ - - . . - - _ _ _ _ _ _ - _ _ _ _ _ _ . . _ _ - - _
_
. _ - _ - - .
s-
,o-
..
.
-
e:
' ATTACHMENT 2
HANAGEMENT MEETING ATTENDEES
LIMERICK UNIT 2
MARCH 30, 1989
NRC
S. Collins
Deputy Director, Division of Reactor
i
Projects (DRP)
i
E. Wenzinger
Chief, Projects Branch No. 2, DRP
M. Knapp
Director, Division of Radiation Safety
and Safeguards (DRSS)
J. Gadzala
Reactor Engineer, Reactor Projects
Section 2A, DRP
T. Kenny
Senior Resident Inspector, Limerick
'
R. Gramm
Senior Operations Engineer, NRC/NRR
R.' . Fuhrmei ster
Resident Inspector, Limerick
!
C. Seelig
Program Analyst, NRC
j
PECo
R. Krich
Branch Head, Limerick Licensing
N. McDermott
Manager-Public Information
.
D. Helwig
Assistant to Executive Vice President
-S. Kowalski-
Vice President, Nuclear Engineering
G. Leitch
Vice President, Limerick
J. Kemper
Senior Vice President, Nuclear Construction
C. McNeill
Executive Vice President-Nuclear
P. Naugle
Manager, Limerick Unit 2
T. Gotzis
General Manager, NED
D. Fetters
Project Manager, Limerick
q
'M. McCormick
Plant Manager, Limerick
j
J. Gallagher
Vice President, Nuclear Service
j
W. Ullrich
Manager, Lime'ick Unit 2 Startup
G. Hunger, Jr.
Director, Licensing
G. Fogarty
Manager, Nuclear Support
H. Honan
Licensing Branch Head
J. Corcoran
Superintendent Startup, Limerick
L, Pyrih
Manager, Engineering
J. Madara, Jr.
General Manager, NQA
A. MacAinsh
Manager, Quality, Limerick
W. Shych
Chief Section Coordinator, Site Security
D. Shaner
Technical Writer
G. Edwards
Transition Manager
L
_ _ _ _ _ _ _
_ _ _ . _
- _ -
_ _ _ _ .
-
<,.-
.
o
i
-
f
I
[.
Other
r
A. Bhattachadyya
Commonwealth of Pennsylvania
I
G. Lawson
Times Herald
S. McClue
The Mercury
K. Suroviec
Evening Phoenix
L
K. Haney
Daily News
i
J. Lloyd
KYW - News Radio
'
B. Monaco
KYW - TV News
W. Maurer
Bechtel
R. Jagecs
Bechtel
L. Memula
Bechtel
B. Rute
Associated Press
l
!
f
l
!
l
l
i
__
_______- _ _____ _ D