Forwards Final SALP Rept 50-353/87-99 for Aug 1987 - Dec 1988,initially Forwarded in .Util Continued to Maintain Very Good Controls Over Const Activities & Effectively Addressed Weaknesses Identified in SALP Rept
ML20245F616
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/21/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Neill C
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20245F620 List:
References
NUDOCS 8905020441
Download: ML20245F616 (4)


See also: IR 05000353/1987099

Text

._

_ _ ,

_

_

_

_ _ _ _ _ _ _

&

);. <; . , *

,<

1

1

21 APR 1989

Docket No. 50-353

Philadelphia Electric Company

ATTN:

C. A. Mc Neill

T

Executive Vice President - Nuclear

.

Correspondence Control Desk

P.O. Box 7520

Philadelphia, PA 19101

Gentlemen:

Subject:

Systematic. Assessment of Licensee Performance (SALP) Report Number

50-353/87-99

This refers to the Systematic Assessment of Licensee Performance (SALP) of the

L4merick Generating Station Unit 2 for the period of August 1987 to December

1988, initially forwarded to you by our March 15, 1989 letter (Enclosure 1).

This SALP evaluation was discussed with you and your staff at a meeting held

on March 30, 1989 (see Enclosure 2 for attendees). We have determined that no

changes are necessary to the SALP report which is being transmitted as the

final report (Enclosure 3).

Our overall assessment was that you and your staff have continued to maintain

very good controls over the construction activities and have effectively

addressed weaknesses identified in the previous SALP report.

In addition,

your efforts to prepare for startup including verification of construction and

design activities, and preoperational testing have been comprehensive and well

managed.

We appreciate your cooperation.

Sincerely,

ORiGEL SENED BY:

!WES M. ALLM1

_y

W. T. Russell

Regictal Administrator

Enclosures:

1.

March 15, 1989 Letter from NRC to PECo transmitting SALP Board Report.

2.

Attendees at Limerick 2 SALP Management Meeting.

3.

Final SALP Report.

h

Obk

O

OFFICIAL RECORD COPY

SALP COVER LETTER / LIM 2 - 0001.0.0

04/19/89

//

l

O

'\\

j

/

-

1'

_ _ - _ _ - _

_____a

c

.,

,

t~

L ,., ,

.-

,

-

,

,

Philadelphia Electric. Company

2

21 APR 1888

cc w/ enc 1:

John S. Kemper, Sr., Senior Vice President

S. Joseph Kowalski, Vice President, Nuclear Engineering

W. T. Ullrich, Superintendent, Limerick 2 Project

A. S. MacAinsh, Quality Assurance Manager

Graham M. Leitch, Vice President, Limerick Generating Station

-J. W. Gallagher,.Vice President - Nuclear

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire, Assistant General Counsel

Dave Honan

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

.K. Abraham, PA0 (17)

Chairman Zech

Commissioner Roberts

Commissioner Carr

Commissioner Rogers

Commissioner Curtiss

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Sectior Chief, DRP

Robert J. Bores, DRSS

)

J. Liebe rman, OE

T. Martin, DRS

M. Knapp, DRSS

J. Taylor, DEDR

M. Miller, SLO

W. Russell

-J. Allan

D. Holody

Management Meeting Attendees

T. Kenny, SRI Limerick 1

R. Fuhrmeister, RI, Limerick 2

RI:

P

R DP

P

Williams /rh1

Linville

gWenzinger

fe

an

issell

4

89

4/)/89

4/p/89

4/d/89

4/7 0/89

4/N89

0FFICIAL RECORD COPY

SALP COVER LETTER / LIM 2 - 0002.0.0

04/18/89

)

<

_w--- _ . . . - _ . . - _ _ _

. - - _

-

_--

~

5 i

.:

.

ATTACHMENT'1

-

  • i;

phi " 00

9'%g

4

UNITED STATES

g

I

'

4,

iS-

4 NUCLEAR REGULATORY COMMISSION

ij-

i

' d]'

'

14ECHON 1

475 at t 8mmALE MOAD

90NG OF Pf9USSIA. PENNSYLVANIA 19406

.

1b MAR 1989

Docket No'. 50-353

Philadelphia Electric Company

ATTN:

C. A. Mc Neill

. Executive Vice President - Nuclear

Correspondence Control Desk

P.O. Box 7520

Philadelphia, PA 19101

  1. -

Gentlemen:

Subject:

Systematic Assessment of Licensee Performance (SALP)

Report Number 50-353/87-99

On February 22, 1989 the NRC Region I SALP Board reviewed and evaluated the

performance of activities associated with the Limerick Generating Station Unit 2

for.the period from August 1987 to December 198o

This assessment is

documented in the enclosed SALP Board Report. We will contact you to schedule

a meeting,to discuss the SALP evaluation.

This assessme'nt has covered the completion of final construction activities

and the transition to the conduct of preoperational testing. We envision that

'

this will be the last SALP that will address Unit 2 separately from Unit 1.

At the SALP management meeting, please be prepared to discuss your evaluation

of our assessment. Additionally, we solicit your written comments within 30

days after the meeting.

We appreciate your cooperation. Should you have any questions concerning the

SALP report, we would be pleased to discuss them with you.

Si ncerely',

'

d(1/

William T. Russell

Regional Administrator

Enclosure:

NRC Region I SALP No. 50-353/87-99

.

i

ee*o D

EW

i

i

._ _

_.

,

e

-

-)..

-

,

,

e .

LPhiladelphiatElectric Company

2

cc w/ encl:

John S. Kemper, Sr., Senior Vice President

S. Joseph Kowalski, Vice President, Nuclear Eng.ineering

W. T. Ullrich, Superintendent, Limerick 2 Project

S. MacAinsh, Quality Assurance Manager - Limerick

Graham M. Leitch, Vice President, Limerick Generating Station

J. W. Gallagher, Vice President - Nuclear

Troy B. Conner, Jr. ,' Esquire

Eugene J. Bradley, Esquire, Assistant General Counsel

Dave Honan

Public Document Room (PDR)'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

,

Commonwealth of Pennsylvania

K. Abraham, PA0 (17)

Chairman Zech

Ccmmission Roberts

Commissioner Carr

Commissioner Rogers

Commissioner Curtiss

l

. . _

J

w .

,,,;

-

-- -

- - - - - - - - - - - - - -

Y

']

s

$

.c. j

'

s % -

'

, :

.c

L',

-f.; ,

'~

,

y'-

-

].f ggg

Philadelphia Electric; Company

3 -:

-3

+

'

'

,<

,

',l

l-

O'

bec w/ enc 1:

.

.

i

,

,

4'

Region I Docket Ro'om (with concurrences)

Management Assistant, DRMA (w/o enc 1)-

L.

. Section Chief,'DRP

b,:

. Robert 'J,f Bores, DRSS .

l ,,

- J. Lieberman, OE

T.. Martin, DRS-

S. : Ebneter,- DRSS -

E'

'J. Tayler, DEDR

j

M.: Miller,. SLO

W.' Russe 11i

)

J.'Allan.

D. Holody:

- Board Members-

. T. Kenny, SRI Limerick 1

- R. Fuhrmeister, RI, Limerick 2

1

,

-

y

l

,

l

,

i

\\

)

)

i

l

.._.s

-

--.

_ .-.

__

_ _- - _ .

___ .- __.- _ - . _ _ _ - - _ _ - - _ - _ - - . . - - _ _ _ _ _ _ - _ _ _ _ _ _ . . _ _ - - _

_

. _ - _ - - .

s-

,o-

..

.

-

e:

' ATTACHMENT 2

HANAGEMENT MEETING ATTENDEES

LIMERICK UNIT 2

MARCH 30, 1989

NRC

S. Collins

Deputy Director, Division of Reactor

i

Projects (DRP)

i

E. Wenzinger

Chief, Projects Branch No. 2, DRP

M. Knapp

Director, Division of Radiation Safety

and Safeguards (DRSS)

J. Gadzala

Reactor Engineer, Reactor Projects

Section 2A, DRP

T. Kenny

Senior Resident Inspector, Limerick

'

R. Gramm

Senior Operations Engineer, NRC/NRR

R.' . Fuhrmei ster

Resident Inspector, Limerick

!

C. Seelig

Program Analyst, NRC

j

PECo

R. Krich

Branch Head, Limerick Licensing

N. McDermott

Manager-Public Information

.

D. Helwig

Assistant to Executive Vice President

-S. Kowalski-

Vice President, Nuclear Engineering

G. Leitch

Vice President, Limerick

J. Kemper

Senior Vice President, Nuclear Construction

C. McNeill

Executive Vice President-Nuclear

P. Naugle

Manager, Limerick Unit 2

T. Gotzis

General Manager, NED

D. Fetters

Project Manager, Limerick

q

'M. McCormick

Plant Manager, Limerick

j

J. Gallagher

Vice President, Nuclear Service

j

W. Ullrich

Manager, Lime'ick Unit 2 Startup

G. Hunger, Jr.

Director, Licensing

G. Fogarty

Manager, Nuclear Support

H. Honan

Licensing Branch Head

J. Corcoran

Superintendent Startup, Limerick

L, Pyrih

Manager, Engineering

J. Madara, Jr.

General Manager, NQA

A. MacAinsh

Manager, Quality, Limerick

W. Shych

Chief Section Coordinator, Site Security

D. Shaner

Technical Writer

G. Edwards

Transition Manager

L

_ _ _ _ _ _ _

_ _ _ . _

- _ -

_ _ _ _ .

-

<,.-

.

o

i

-

f

I

[.

Other

r

A. Bhattachadyya

Commonwealth of Pennsylvania

I

G. Lawson

Times Herald

S. McClue

The Mercury

K. Suroviec

Evening Phoenix

L

K. Haney

Daily News

i

J. Lloyd

KYW - News Radio

'

B. Monaco

KYW - TV News

W. Maurer

Bechtel

R. Jagecs

Bechtel

L. Memula

Bechtel

B. Rute

Associated Press

l

!

f

l

!

l

l

i

__

_______- _ _____ _ D