MONTHYEARML20203F4511999-02-12012 February 1999 SER Finding Licensee Adequately Addressed GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Virgil C Summer Nuclear Station ML20198F4241998-12-18018 December 1998 Safety Evaluation Granting Relief Request for Approval to Repair ASME Code Class 3 Service Water Piping Flaws in Accordance with GL 90-05 for VC Summer Nuclear Station ML20155G4551998-11-0404 November 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Use Code Case N-416-1 with Licensee Proposed Addl Exams ML20154Q9571998-10-21021 October 1998 SER Accepting Request Seeking Approval to Use Alternative Rules of ASME Code Case N-498-1 for Class 1,2 or 3 Sys ML20237A7181998-08-13013 August 1998 SER Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20248J0191998-06-0404 June 1998 Safety Evaluation Accepting Licensee Inservice Testing Program Interim Pump Relief Request Per 10CFR50.55a(a)(3) (II) ML20212C0381997-10-19019 October 1997 Safety Evaluation Accepting License Request for Deviation from Commitment to Meet Section III.G.2.c of App R to 10CFR50 Re Fire Protection of Safe Shutdown Capability for Plant ML20217E3491997-09-22022 September 1997 Safety Evaluation Authorizing Licensee Proposed Alternative for Current Interval Insp Program Plan ML20133J5551997-01-15015 January 1997 Safety Evaluation Granting Licensee Request Proposing Not to Perform Increased Frequency Testing on a Charging Pump at Virgil C Summer Nuclear Station ML20128G2931996-10-0202 October 1996 Safety Evaluation Supporting Amend 135 to License NPF-12 ML20128F4221993-02-0909 February 1993 Safety Evaluation Re Nuclear Physics Methodology for Reload Design.Request to Perform Reload Analyses Approved ML20056A7931990-08-0606 August 1990 Safety Evaluation Re Capability of Plant to Meet Requirements of Branch Technical Position Rsb 5-1, Design Requirements of RHR Sys. Design Satisfies License Condition 4 ML20245F5061989-06-22022 June 1989 Safety Evaluation Re Request for Relief from Section XI Re Hydrostatic Test Requirement ML20244D7361989-06-12012 June 1989 Safety Evaluation Accepting Util Response to Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability for All Domestic Operating Reactors ML20195B4421988-10-28028 October 1988 Safety Evaluation Supporting Amend 74 to License NPF-12 ML20151K0901988-07-28028 July 1988 Safety Evaluation Supporting Util Proposed Implementation of ATWS Rule Pending Resolution of Tech Spec Issue ML20151K7771988-07-27027 July 1988 Safety Evaluation Supporting Util Request to Deviate from Recommendations of Reg Guide 1.97 Re Instrumentation to Monitor Containment Temp ML20151R8561988-04-19019 April 1988 Safety Evaluation Supporting Related Inservice Testing Program & Request for Relief of Utils ML20236R4111987-11-13013 November 1987 Safety Evaluation Supporting Conformance to Reg Guide 1.97, Rev 3 ML20236K7701987-11-0505 November 1987 SER Accepting Util 831104 & 870401 Responses to Item 2.2.1 of Genreic Ltr 83-28 Re Equipment Classification Programs ML20237H3661987-07-22022 July 1987 Corrected Page to Safety Evaluation Issued W/Amend 67, Changing Second Paragraph & Deleting Third Paragraph on Page Three ML20214S8881987-06-0303 June 1987 Safety Evaluation Rept Granting Relief from Hydrostatic Testing After Repair to ASME Code Section Xi,Class 1,reactor Coolant Pump Seal Injection Line ML20209H3331987-01-30030 January 1987 SER Supporting Util 831104 Response to Generic Ltr 83-28, Item 4.5.2 Re on-line Testing of Reactor Trip Sys Reliability ML20213A5611987-01-30030 January 1987 SER Accepting Util 831104 Response to Generic Ltr 83-28,Item 2.1 (Part 2) Re Vendor Interface Program for Reactor Trip Sys Components ML20212F2841986-12-22022 December 1986 Safety Evaluation Supporting Amend 57 to License NPF-12 ML20211M4161986-12-0909 December 1986 Safety Evalution Supporting Licensee 860123 Submittals Re Fast Neutron Fluence for Fracture Toughness Requirements for Protection Against PTS Events (10CFR50.61) ML20203N0151986-09-15015 September 1986 Safety Evaluation Re Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Post-Maint Testing (RTS Components,All Other Safety-Related Components). Response Acceptable ML20199D4211986-06-0909 June 1986 SER on Util 831104 & 860423 Responses to Generic Ltr 83-28, Item 1.2 Re post-trip Review Data & Info Capabilities.Data & Info Capabilities Acceptable ML20211A2571986-05-22022 May 1986 Safety Evaluation Accepting Mods to App R,Clarified by Generic Ltrs 81-12 & 83-33,to Prevent Spurious Equipment Operation Caused by fire-induced Conductor or Cable Faults, Facilitate Operator Actions & Resolve Addl Circuit Concerns ML20154A0621986-02-24024 February 1986 Safety Evaluation Supporting 850930 & 1204 Responses to 850802 & 1104 Requests,Respectively,For Addl Info Re Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events ML20154D1921986-02-14014 February 1986 Sser 1 Re Licensee 851204 Response to Generic Ltr 83-28, Item 3.2.2 Concerning Procedures & Programs to Review Info on safety-related Equipment.Response Acceptable & Meets Intent of Generic Ltr 83-28 ML20136B2291985-11-0707 November 1985 Safety Evaluation Supporting Amend 46 to License NPF-12 ML20209H8411985-11-0404 November 1985 Safety Evaluation Re Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2,4.1 & 4.5.1.Response to Item 3.2.2 Incomplete & Addl Info Required ML20137S5781985-09-24024 September 1985 SER Approving Licensee 831104 & 0715 Responses to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Program & Procedures for Restart from Unscheduled Reactor Trip Acceptable ML20133H7321985-08-0202 August 1985 SER Re Util 831104 Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Concerning Reactor Trip Sys Reliability. Licensee Should Add Undervoltage Trip Attachment to Trending Program ML20128A2181985-06-21021 June 1985 SER of Util Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Listed Addl Info Required Before Review Can Be Completed 1999-02-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D6401999-10-31031 October 1999 Rev 2 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With ML20216J4191999-09-24024 September 1999 Part 21 Rept Re 990806 Abb K-Line Breaker Defect After Repair.Vendor Notified of Shunt Trip Wiring Problem & Agreed to Modify Procedure for Refurbishment of Breakers RC-99-0180, Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression1999-09-0808 September 1999 Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With ML20211K6161999-08-31031 August 1999 Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, Dtd Aug 1999 RC-99-0168, Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed1999-08-19019 August 1999 Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed ML20210M7071999-07-31031 July 1999 Rev 1 to VC Summer Nuclear Station COLR for Cycle 12 ML20211C2201999-07-31031 July 1999 Rev 1 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0137, Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With ML20206H2971999-05-0505 May 1999 Part 21 Rept Re Common Mode Failure for magne-blast Breakers.Vc Summer Nuclear Station Utilizes These Breakers in Many Applications,Including 7.2-kV EDG Electrical Buses RC-99-0103, Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With ML20206K2421999-04-30030 April 1999 Rev 0 to COLR for Cycle 12 for Summer Nuclear Station RC-99-0087, Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory1999-04-15015 April 1999 Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory RC-99-0083, Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0063, Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced1999-03-26026 March 1999 Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced ML20196K5421999-03-22022 March 1999 Rev 2 to VC Summer Nuclear Station,Training Simulator Quadrennial Certification Rept,1996-99, Books 1 & 2. Page 2 of 2 Section 2.4.4 (Rev 2) of Incoming Submittal Were Not Included RC-99-0055, Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 9903121999-03-16016 March 1999 Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 990312 RC-99-0050, Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML20203F4511999-02-12012 February 1999 SER Finding Licensee Adequately Addressed GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Virgil C Summer Nuclear Station ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20206R5241998-12-31031 December 1998 Santee Cooper 1998 Annual Rept RC-99-0052, Vsns 1998 Annual Operating Rept. with1998-12-31031 December 1998 Vsns 1998 Annual Operating Rept. with RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With ML20206R5191998-12-31031 December 1998 Scana Corp 1998 Annual Rept ML20198F4241998-12-18018 December 1998 Safety Evaluation Granting Relief Request for Approval to Repair ASME Code Class 3 Service Water Piping Flaws in Accordance with GL 90-05 for VC Summer Nuclear Station RC-98-0223, Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method1998-12-16016 December 1998 Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With ML20155G4551998-11-0404 November 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Use Code Case N-416-1 with Licensee Proposed Addl Exams RC-98-0208, Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With ML20207J5701998-10-31031 October 1998 Non-proprietary Rev 1 to WCAP-14955, Probabilistic & Economic Evaluation of Rv Closure Head Penetration Integrity for VC Summer Nuclear Plant ML20154Q9571998-10-21021 October 1998 SER Accepting Request Seeking Approval to Use Alternative Rules of ASME Code Case N-498-1 for Class 1,2 or 3 Sys ML20154K7901998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15101, Analysis of Capsule W from Sceg VC Summer Unit 1 Rv Radiation Surveillance Program RC-98-0184, Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With ML20154K8041998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15103, Evaluation of Pressurized Thermal Shock for VC Summer Unit 1 RC-98-0166, Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With ML20237A7181998-08-13013 August 1998 SER Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RC-98-0153, Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0131, Monthly Operating Rept for June 1998 for VC Summer Nuclear Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for VC Summer Nuclear Station ML20248J0191998-06-0404 June 1998 Safety Evaluation Accepting Licensee Inservice Testing Program Interim Pump Relief Request Per 10CFR50.55a(a)(3) (II) RC-98-0113, Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0100, Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 1 ML20217G7411998-04-22022 April 1998 Rev 1 to VC Summer Nuclear Station COLR for Cycle 11 RC-98-0076, Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure1998-04-17017 April 1998 Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure RC-98-0084, Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 1 ML20212H1421998-03-0202 March 1998 Interim Part 21 Rept SSH 98-002 Re EG-B Unit That Was Sent to Power Control Svcs for Determination of Instability & Refurbishment of a Dg.Cause of Speed Oscillations Unknown. Completed Hot Bore Checks on Power Case 1999-09-08
[Table view] |
Text
_ _ -___ - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - -
=
M.
Yk.
!! o UNITED STATES NUCLEAR REGULATORY COMMISSION
'$[o E
,. WASHINGTON, D. C. 20S551 .;
1
, SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION' REGARDING A REQUEST FOR RELIEF:FROM SECTION XI-HYDROSTATIC TEST REQUIREMENT-SOUTH CAROLINA ELECTRIC & GAS-CONPANY-
' SOUTH CAROLINA PUBLIC SERVICE AUTHORITY VIRGIL C. SUP9tER NUCLEAR STATION. UNIT NO. 1 DOCKET'NO 50-395 I.- BACKGROUND INFORMATION The. Virgil C.. Summer Nuclear Station Operating License was. issued on August 6, 1982. Paragraph 10 CFR 50.55a(g)(4) requires that throughout
.the service life of.a boiling or pressurized water-cooled nuclear power facility, components, including supports, which are classified as ASME
. Code Class 1: . Class 2 and Class 3 shall meet the requirements set forth in
- the applicable'Section XI Editions and Addenda of the ASME Boiler and Pressure Vessel Code.to the extent practical within the limitations of-l design,' geometry and materials of construction of the components. By.
letter dated March 30, 1988, South Carolina' Electric & Gas Company
(licensee) requested: relief'from the hydrostatic test requirements of the 1977. Edition through Summer 1978 Addenda of Section XI of the.ASME Code following: replacement of valves by welding in the steam generator blowdown lines:at Virgil.C. Summer Nuclear Station. The relief request contained information in support of the licensee's determination that the requirement is impractical to perform at Virgil C. Summer Nuclear Station.
II. . REQUEST, REQUIREMENT, AND SUPPORTING INFORMATION A. Relief Request Relief is requested from performing the hydrostatic test of the welds made during replacement of steam generator blowdown isolation valves XVG-503A-BD, XVS-5038-BD, and XVG-503C-BD.
4 B. Blowdown System Function L The blowdown system function is to assist in controlling the chemistry of the secondary side of the steam generator by reducing the soluble and particulate chemical impurities concentrated, by evaporation of secondary water, in the steam generator (SG). By removing a small !
fraction of the water from the steam generator on a continuous basis, l j.
control of chemical impurities can be achieved.
8906280157 890622 PDR ADOCK 05000395 P PDC
M~ is <
x q '[ .
E,
, 2 C. System Modification-p The current design of the blowdown isolation valves (XVG-503A, B, and C).is one that is susceptible to thermal binding.- SCE&G intends to
- h. replace'these valves with a design that is less susceptible to thermal binding during the next refueling outage scheduled for April 1990. . Design ~and installation will be.in accordance with the ASME, 1 Code,Section XI,'1977 Edition through and. including Summer,'1978
~ Addenda.
D.Section XI Code Requirements The ASME Section XI.' Code requires that, subsequent.to repairs or modifica-
- tions by welding which penev Les the pressure boundary on piping
. greater than one inch diameter, conduct of a hydrostatic test on such piping be performed.
Pursuant to ASME Code,Section XI, 1977 Edition through and including
< Summer 1978 Addenda, hydrostatic test pressure is 1.25 Psv or 1470 PSI where Psv is the lowest pressure setting among the main steam safety valves.
E. Basis for Relief The licenst indicated that performing the required hydrostatic test on the. blowdown piping. subsequent to the modification would be extremely difficult, impractical, and expensive due to the following:
- 1. Due to the location of the valves to be replaced, a hydrostatic test, as required by the Code, would impact the secondary side of the Steam Generators and portions of the main feedwater, main steam, and blowdown systems.
- 2. The inability to maintain pressure due to potential leakage through the feedwater isolation valves, main steam isolation valves, and other valves connected to the-system.
- 3. Additional time and. effort to pin or block main steam constant i support and variable spring hangers. !
- 4. Additional time and effort to remove the main steam safety valves and blank the inlet piping.
- 5. Potential for placing excess stress on the steam generator shells.
- 6. Potential for damage to system instrumentation and considerable time to isolate or remove instrumentation.
- 7. Potential for damage to main steam system and its hangers due to static loads caused by water solid condition.
4 , ,, e <
s ,
.ii ~ u m
)
.-3--
- 8. Potential for damage to steam generator tube bundles.
- 9. Isolation and preparation of this-system would result in -
additional' radiation exposure.to personnel.-
m , - 10. Inadditiontotheabove~nine-(9) reasons,.thealternate examinations specified will provide a . level of confidence and quality equal to or better than' the" required testing per the ASME Code.
~ F .~ Proposed Alternate Examinations Far Steam Generator Blowdown System Piping Welds The licensee has. committed to performing the following examinations on the affected blowdown system piping welds. prior to declaring the blowdown system operable, except for, Item 4, which will.be completed at the end of the first inspection interval:
l'. Magnetic particle testing examination on the root pass and the final weld surface pursuant to ASME Code Section.V, Article 7.
- 2. : Visual examination.
- 3. Perform inservice leak test at nominal operating pressure.
- 4. Perform hydrostatic test at the'end of the 10 Year interval.
III. STAFF EVALUATION AND CONCLUSION The staff has reviewed the licensee's justification'for the. request.for relief from performing the Section XI testing ~on the steam generator blowdown valves.: The staff has. determined.that it is impractical to perform the' Code-required hydrostatic test on the welds made during replace-ment of valves XVG-503A-BD, XVG-502B-BD, and XVG-503C-BD.because the valves cannot be isolated from the secondary side of the' steam generators, the-main steam,. and main feedwater systems. To accomplish the hydrostatic test. requirements would cause-the steam generators to be subjected to 1470 !
psig also, .a pressure cycle not. warranted or accounted for in their design. {
'The licensee's proposed alternate examinations (magnetic particle _ testing, I visual examination and an inservice leak test) will provide assurance i that the welds'made during the replacement of the~ steam generator blowdown 1 isolation, valves are structurally sound. The staff, therefore,. concludes that )
relief from the hydrostatic test requirements of the 1977 Edition through- l Summer 1978 Addenda of Section XI of the ASME Code for the subject welds may be granted under 10 CFR 50.55a(g)(5)and(6).
Principal Contributor: G. Johnson Dated: June 22, 1989 -
L L ,
l 4
.