e-_r,-

. p.

mousmusumus

==

F """":

Log # TXX-89212 File # 10130

.=

=

IR:85-13 Ref. s 10CFR2.201 7UELECTR/C E$22 rra,isen,

^9'i' 28' 1989 U. S. Nuclear Regulatory Commission Attn:

Document Control. Desk Washington, D.~C. 20555'

)

SUBJECT:

. COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N0. 50-445 4

NRC INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09 l

' REVISED DATE-0F FULL COMPLIANCE FOR NOTICE OF.. VIOLATION ITEM D (445/8513-V-01)

REF:

TV Electric Letter TXX-88745 from W. G. Counsil to U.S.N.R.C. dated October 20, 1988 i

Gentlemen:

The referenced letter stated that the implementation of approximately 155 Design Change Authorizations (DCA's) and approximately 70 Nonconformance Reports (NCR's) resulting from engineering walkdowns to identify conduit sleeves would be complete by May 1, 1989..The 70 NCR's mentioned'.in the referenced letter pertain to another attribute covered by the engineering walkdown and are not related to conduit sleeve identification.

These NCR's will not necessarily be complete by the above date.

Implementation of'the approximately 155 DCA's has been incorporated into the CPSES Unit.1 room and area completion program and will be complete prior to Unit'1 fuel load.

Sincerely, l

AL William J. bahill, Jr.

BSD:bsJ c - Mr. R. D. Martin, Region IV Resident Inspectors CPSES (3) 8905020299 890428 h

PDR ADOCK 05000445 0

G PNV F

l0 400 North Olive Street LB 81 Dallas, Te as 75201

.