JUN 141989
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the special safety inspection of activities related to
Allegation RIII-87-A-0027 conducted by Messrs. R. W. Cooper, and M. P. Huber
of this office on February 27 through March 3 and March 16-17, 1989, of-
activities at Clinton Power Station, Unit 1, authorized by NRC Operating
License No. NPF-62, and to the discussion of our findings with Mr. D. P. Hall
)
and others of your staff at the conclusion of the inspection.
This allegation
involved containment integrity, the inservice testing program, and the extent
to which licensee management understood the alleger's concerns t:o be
programmatic safety issues prior to fuel load.
The enclosed copy of our inspection report identifies areas examined during
I
the inspection. Within these areas, the inspection consisted cf a selective
examination of procedures and representative records, observations, and
interviews with personnel.
'
No violations of NRC requirements were identified during the course of this
inspection.
l
l
In accordance with 10 CFR 2.790 of t'a Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
i
,
We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
,
_ DElGINAL S!CNED Ly }wgg g g
H. J. Miller, Director
Division of Reactor Safety
l
Enclosure:
Inspection Report
l
No. 50-461/89016(DRS)
i
See Attached Distribution
8906270213 890614
ADOCK 05P)OO461
Q
,
RIII
RIII
R II
RIII,
R;
Z11/)
.bVW)
44'
C4IMfQl'VJ(
t
\\\\
~
Huber/ Jaw /lc
Danielson
'
Ring /
Mihl er N p l
'
o
4/perf/MfWft
M
>
-
- 1
/f
-
,-
-
s
.
.
(.'
JUN 141989
Illinois Power Company
2
Distribution
cc w/ enclosure:
D. P. Hall, Vice President
J. S. Perry, Assistant
Vice President
R. D.-Freeman, Manager,
Nuclear Station
Engineering Department
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. U. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division, Sargent a Lundy
Engineers
David Rosenblatt, Governor's
Office of Consumer Services
Sheldon Zabel, Esquire,
Schiff, Hardin, & Waite
L. Larson, Project Manager,
General Electric Company
Chairman of DeWitt County
Illinois Department of
Nuclear Safety
D. Schopfer, Project Manager,
Sargent & Lundy Engineers
l
l
l
l
l
l
l
l
l
i
- _ _ - _ - _ . -