Forwards Safety Insp Rept 50-461/89-16 on 890227-0303 & 0316-17.No Violations Noted
ML20245D722
Person / Time
Site: Clinton 
Issue date: 06/14/1989
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20245D727 List:
References
NUDOCS 8906270213
Download: ML20245D722 (2)


See also: IR 05000461/1989016

Text

-

. . -

-

..

.

JUN 141989

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the special safety inspection of activities related to

Allegation RIII-87-A-0027 conducted by Messrs. R. W. Cooper, and M. P. Huber

of this office on February 27 through March 3 and March 16-17, 1989, of-

activities at Clinton Power Station, Unit 1, authorized by NRC Operating

License No. NPF-62, and to the discussion of our findings with Mr. D. P. Hall

)

and others of your staff at the conclusion of the inspection.

This allegation

involved containment integrity, the inservice testing program, and the extent

to which licensee management understood the alleger's concerns t:o be

programmatic safety issues prior to fuel load.

The enclosed copy of our inspection report identifies areas examined during

I

the inspection. Within these areas, the inspection consisted cf a selective

examination of procedures and representative records, observations, and

interviews with personnel.

'

No violations of NRC requirements were identified during the course of this

inspection.

l

l

In accordance with 10 CFR 2.790 of t'a Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

i

,

We will gladly discuss any questions you have concerning this inspection.

'

Sincerely,

,

_ DElGINAL S!CNED Ly }wgg g g

H. J. Miller, Director

Division of Reactor Safety

l

Enclosure:

Inspection Report

l

No. 50-461/89016(DRS)

i

See Attached Distribution

8906270213 890614

PDR

ADOCK 05P)OO461

Q

PDC

,

RIII

RIII

R II

RIII,

R;

Z11/)

.bVW)

44'

C4IMfQl'VJ(

t

\\\\

~

Huber/ Jaw /lc

Danielson

'

Ring /

Mihl er N p l

'

o

4/perf/MfWft

M

>

-

  1. 1

/f

-

,-

-

s

.

.

(.'

JUN 141989

Illinois Power Company

2

Distribution

cc w/ enclosure:

D. P. Hall, Vice President

J. S. Perry, Assistant

Vice President

R. D.-Freeman, Manager,

Nuclear Station

Engineering Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. U. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent a Lundy

Engineers

David Rosenblatt, Governor's

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers

l

l

l

l

l

l

l

l

l

i

- _ _ - _ - _ . -