ML20245D711
| ML20245D711 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/29/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20245D713 | List: |
| References | |
| NUDOCS 8810060254 | |
| Download: ML20245D711 (2) | |
See also: IR 05000382/1988023
Text
- _ _ . _ - - - _ - _
_ _ _ . _
S E P 2 ~9 2
-
-
'
In Reply Refer To:
~
Docket:
50-382/88-23
Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
317 Baronne Street
New Orleans, Louisir:nt 70160
Gentlemen:
-
This refers to the inspection conducted by Mr. W. M. McNeill of this office
~
during the period August 22-26 and September 19-23, 1988, of activities
authorized by NRC Operating License NPF-38 for the Waterford Steam Electric
Station, Unit 3, and to the discussions of our findings with Mr. R. P. Barkhurst
and other members of your staff at the conclusion of the site inspection, and
with Mr. N. S. Carns and other members of your staff following completion of
additional reviews in the Region IV office.
The area examined during the inspection dealt with potential enforcement
findings which were identified by the Vendor Inspection Branch in NRC
Inspection Report 50-382/87-19. Within this area, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
In your response,
reference may be made, as appropriate, to your previous correspondence
concerning NRC Inspection Report 50-382/87-19.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Original Signed By
-
W. B. Beach
,
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(see next page)
{
RIV:RI
d
C:MQPS g
D.
D:Ek
WiticNeill/tw
IBarnes
JLMyh06n
LJCallan
7 /27/88
1/27/88
- )/A7/88
9 /l6 /88
-
l
89100602b4 880929
[
- {DR
ADOCK 05000382
i
PNV
gg
,
L_ _ _ _ _ ___ __
_
__.
_ - _ _ _ .
___
- - - _ - _ - - - . - _ _ - - ,
..
p.
.
~ Louisiana Power & Light Company-
-2-
s
Erclosures:
1.
Appendix A - Notice of Violation.
2.
Appendix B - NRC Inspection Report
-50-382/88-23
cc w/ enclosures:
Louisiana Power & Light Company
.
ATTN:
,G. E. Wuller, Onsite
Licensing Coordinator
,
P.O. Box B
Killona, Louisiana ~70066
L
Louisiana Power & Light Company
l
ATTN:
N. S. Carns, Plant Manager
P.O. Box B
Killona Louisiana 70066
'
Middle South Services
ATTN: Mr. R. T.-Lally
P.O. Box 61000
New Orleans, Louisiana 70161
Louisiana Power & Light Company
ATTN:
R. F. Burski, Acting Manager
Nuclear Safety and Regulatory
Affairs
317 Baronne Street
P.O. Box 60340
New Orleans, Louisiana 70160
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
.
- Section Chief (DRP/A)
- DRP
- RPB-DRSS
- MIS System
- Project Engineer, DRP/A
- RSTS Operator
- RIV File
- D. Wigginton, NRR Project Manager
- DRS~
Lisa Shea, RM/ALF
- W. M. McNeill
- I. Barnes
G. Sanborn
- w/766
_ _ - _ _ _ _ - -
___- _ -