Forwards Insp Repts 50-445/89-33 & 50-446/89-33 on 890503-0606.No Violations or Deviations Noted
ML20245D648
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/19/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20245D650 List:
References
NUDOCS 8906270189
Download: ML20245D648 (3)


See also: IR 05000445/1989033

Text

_ -_ - ___ - __ _ - -

.

.

<

.

'

JUN I 91989

-

In Reply Refer To:

Dockets:

50-445/89-33

50-446/89-33

Mr. W. J. Cahill

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the inspection conducted by Mr. M. F. Runyan and NRC

consultants during the period May 3 through June 6, 1989, of

i

activitics authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Penk Steam Electric Station, Units 1

and 2, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

ORIGINAL SICNED BY R. F. WARNICE

R. F. Warnick, Assistant Director

for Inspection Programs

,

Comanche Peak Project Division

1

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-33; 50-446/89-33

cc w/cnclosure:

See next page

JAh

HLivermore[#'j

IP:CPPD:NRR

IP:CPPD:NRR

AD:IP:CPPD:NRR

MRunyan

RWarnick O'4()

6/t)/89

6/lcj/89

6//9/89

][20/

'

8906270109 890619

PDR

ADOCK 05000445

t'

O

PNU

- - - - _ _ _ _ _ _ _

_

_

.

'.

[

\\'l

UNITED STATES

8"

NUCLEAR REGULATORY COMMISSION

-

'f

,E

]

wash:wcrow, o. c. 20sss

'%,...../

JUN ! 91989

In Reply Refer To:

-

Dockets:

50-445/89-33

50-446/89-33

{

l

Mr. W. J. Cahill

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the inspection conducted by Mr. M. F. Runyan and NRC

consultants during the period May 3 through June 6, 1989, of

!

activities authorized by NRC Construction Permits.CPPR-126 and

i

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1-

and 2, and to the discussion of our findings with you and other

j

members of your staff at the conclusion of the inspection.

l

l

The enclosed copy of our inspection report identifies areas examined

1

during the inspection.

Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

RF4)audek

l

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Nuclear Reactor Regulation

Enclosure:

,

l

Inspection Report 50-445/89-33; 50-446/89-33-

cc w/ enclosure:

See next page

- _ __-_-_-____ -__

. _ _ _ _ - _ _

__

_ _ _

_ _ .

_

_s

.

.

'

Wo J.

Cahill

j

cc w/cnclosure:-

l

Roger D. Waluer

TU Electric

Manager, Nuclear Licensing

c/o Bethesda Licensing

'TU Electric

3 Metro Center, Suite 610

,

Skyway Tower

Bethesda, Maryland- 20814

400 North Olive Street, L.B. 81

Dallas, TX

75201

E. F. Ottncy

P. O. Box 1777

Juanita Ellis

Glen Rose, Texas

76043

President - CASE

1426 South Polk Street

Joseph F. Fulbright

j

Dallas, TX

75224

Fulbright & Jaworski

i

1301 McKinney Street

Susan M. Thcisen

Houston, Texas

77010

(

Assistant Attorney General

_

Environmental Protection Division

George A. Parker, Chairman

'

P.O. Box 12548, Capitol Station

Public Utility Committee

Austin, TX

78711-1548

Senior Citizens Alliance of

Tarrant County, Inc.

GDS Associates, Inc.

6048 Wonder Drive

l

i

1850 Parkway Place, Suite 720

Fort Worth, Texas

76133-

)

l

Mariotta, GA

30067-8237

,

i

Jack R. Newman, Esq.

1

Lanny A. Sinkin

Newman & Holtzinger, P.C.

]

Christic Institute

Suite 1000

l

1324 N. Capitol Street

1615 L.-Street N.W.

I

Washington, DC

20002

Washington, D.C.

20036

Ms. Billie Pirner Garde, Esq.

Garde Law Office

)

104 East Wisconsin Avenue

~

Appleton, WI

54911

i

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

l

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

'

1025 Thomas Jefferson St., NW

Washington, DC

20007

i

i

i

!

l

'

_ _ _ - - _ - - - - - - -