ML20245D495
| ML20245D495 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/21/1989 |
| From: | Strosnider J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20245D498 | List: |
| References | |
| NUDOCS 8905010019 | |
| Download: ML20245D495 (2) | |
See also: IR 05000277/1989006
Text
-
- _ _ _
_ _ - - . _ _ _ _ _ _ -
- - _
_ - _ _ - - _ - - _ _ _.
. _ _ _ - _ _ _
c
>
gym 'f "
sc
s
<
,.
- n
.. ) ,
APR 211939 -
DocketLNos.
50-277
50-278
Philadelphia Electric Company
, ATTN: Mr. C. A. McNeill
Executive Vice president-Nuclear
Correspondence Control Desk
.P; 0. Box 7520
,
Philadelphia,' Pennsylvania 19101
. Gentlemen:
Subject: Combined Inspection Report Nos. 50-277/89-06 and 50-278/89-06
'I
This letter refers to.the routine safety inspection conducted by
~
Mr. Joseph. A. Golla of this office on February 27 - March 7,1989 at Peach..
Bottom Units 2 and 3.
The inspection focused on your follow up actions related
to several Inservice and Local Leak Rate Testing open items. Mr. Golla discussed
the findings' of the inspection with Mr. George Daebeler of your staff at.the-
conclusion:of'the inspection.
Areas- examined du' ing .this inspection are described in the NRC Region I
r
Inspection Report which
inspection consisted of is enciesed with this letter. Within these areas,.the
selective examinations.of-procedures ~and representative
records, interviews with personnel,.and observations by the inspector.
Within the scope ofLthis inspection, no. violations were observed.
It appears
that your staff has effectively addressed weaknesses previously identified in
the ' inservice testing and containment leak rate testing programs.
Also, I would
like to call to your attention;the commitments made by your staff with regard-
-
to containmentuleak rate testing as' described in Section 4.13, item 3 on
pageL11 of'the enclosed report.
.No reply to this letter is requirei. Your cooperation with us in this matter
is appreciated.
Sincerely,
OrMind Signed By:
,
Eck R. Strosnicier
Jack Strosnider, Chief
Engineering Branch
' '
Division of Reactor Safety
Enclosure: Combined NRC Region I Inspection Report Numbers
'50-277/89-06 and 50-278/89-06
,
0FFICIAL RECORD COPY
CIR PB 89-06 - 0001.0.0
04/20/89
8905020019 890421
V
1t
gDR- ADOCK 0500
7
~[
Q *. Q)
i
=-
-
L
-
--
- -- --
- - - -
_ _ _
_
. _ _ _ _ _ _ _ _ - _ _ _ _ - _
'
'.
'
~
APR 211989
,
-
.
Philadelphia Electric Company
-2-
cc w/ encl:
John S. Kemper, Sr., Senior Vice President-Nuclear
J. W. Gallagher, Vice President, Nuclear Services
E. C.' Kistner, Chairman, Nuclear Review Board
Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
Eugene J. Bradley, Esquire, Assistant General Ccunsel (Without Report)
.
l
.Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
PA0 (23) SALP and (2) Inspection Reports
Robert J. Bores, DRSS
R. Martin, NRR
M. Johnson, EDO
!
-
w
I:DRS
RI:DRS
hfEapen
[)RI:DRS
Golla/kl
Strosnider
4/ /Z/89
4//p/89
4/ 20 /89
0FFICIAL RECORD COPY
CIR PB 89-06 - 0002.0.0
i
04/11/89
)
-_- - - -