Forwards Amend 29 to License DPR-21 & Safety Evaluation. Amend Removes cycle-specific Parameter Limits,Decreases Min Critical Power Ratio from 1.07 to 1.04 & Removes Previous Approval to Initiate Reactor Startup
ML20245D286
Person / Time
Site: Millstone 
Issue date: 04/14/1989
From: Boyle M
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20245D289 List:
References
TAC-71929, NUDOCS 8904280211
Download: ML20245D286 (4)


Text

_

April'14, 1989 p..,

?

, Docket No. 50-245 DISTRIBUTION

% DocketsFile m TMeek (4)-

NRC & Local PDRs WJones Plant File EButcher

.Mr. Edward J. Mroczk'a svarga:

ACRS(10)

Senior Vice President BBoger

.GPA/PA Nuclear Engineering and Operations SNorris ARM /LFMB Northeast Nuclear Energy Company MBoyle.

3rd Fieso P. O. Box 270 0GC Tr/1)ung Hartford, Conriecticut 06141-0270 DHagan Edordan

Dear Hr. Mroczka:

BGrimes

SUBJECT:

ISSUANCE OF AMENDMENT (TAC NO. 71929)

The Commission has issued the enclosed Amendment No. 29 to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit No. 1, in response to your application dated January 20, 1989 The amendment to the Technical Specifications removes cycle-specific parameter limits, decreases the Minimum Critical Power Ratio from 1.07 to 1.04 6.nd removes a previous approval to initiate reactor startup with flow indication from 1.of the 20 jet pumps unavailable.

A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's bi-weekly Federal Register notice.

Sincerely,

/s/

Michael L. Boyle, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reac. tor Regulation

Enclosures:

1.

Amendment No. 29 to DPR-21 l

2.

Safety Evaluation cc w/ enclosures:

See next page LA:PDI PM:PDI-4(@

PD:PDI-4 OGC SNd?r MBoyle:cb j'/Stolz03/g/89 03/3 #/89 03/J8'/89 03/g6/89 6904280211 890414 i'7 h

DR ADOCK O g54 4

b

e M:

April 14, 1989-Docket No. 50-245 DISTRIBUTION Docket File THeek(4)

NRC & Local PDRs k' Jones Plant File EButcher Mr. Edward J. Mroczka svarr,a.

CLYACRS(10): A Senior Vice President BBoger GPA/PA l

Nuclear Engineering and Operations SNorris ARM /LFMb Northeast Nuclear Energy Company MBoyle ura Fiewo P. O. Box 270 OGC

-r yT>w;$

Hartford, Connecticut 06141-0270 DHagan EJordan

Dear Mr. Mroczka:

BGrimes

SUBJECT:

ISSUANCE OF AMENDMENT.(TAC NO. 71929)

The Commission has issued the enclosed Amendment No. 29 to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit No.1, in response to your application dated January 20, 1989.

The amendment to the Technical Specifications removes cycle-specific parameter limits, decreases the Minimum Critical Power Ratio from 1.07 to 1.04 and removes a previous approval to initiate reactor startup with flow indication from 1 of the 20 jet pumps unavailable.

A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's bi-weekly Federal Register notice.

Sincerely, Is/

Michael L. Boyle, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Peactor Regulation

Enclosures:

1.

Amendment No. 29 to DPR-21 2.

Safety Evaluation cc w/ enclosures:

See next page LA:PD S PM:PDI-4 0 PD:PD?-4gf' OGCgf #

1 SNc?ris MBoyle:ch

/Stolz 03/)ff/89 03/p/89 f01/g/89 03/3#/89

.C :.

l

>3 tic

,[

e, UNITED STATES 3

,c.

NUCLEAR REGULATORY COMMISSION

{(

' j,E WASHINGTON, D. C. 20555

% pD 4,/

April 14, 1989 a...+

Docket No. 50-245 Mr. Edward J. Nroczka Senior Vice President Nucle:.r Engineering and Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

ISSUANCE OF AMENDMENT (TAC NO. 71929)

The Consnission has issued the enclosed Amendment No.29 to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit No.1, in response to your application dated January 20, 1989.

The amendment to the Technical Specifications removes cycle-specific parameter limits, decreases the Minimum Critical Power Ratio from 1.07 to 1.04 and rtiroves a previous approval to initiate reactor startup with flow indication from 1 of the 20 jet pumps unavailable.

A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's bi-weekly Federal Register notice.

Sincerely, m e.. b j q i Michael L. Boyle, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 29 to DPR-21 2.

Safety Evaluation cc w/ enclosures:

)

See next page i

1

p

+

Mr. Edward J. Mroczka-Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. I cc:

Gerald Garfield, Esquire -

R. M. Kacich, Manager Day. Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company-City Place.

Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 1

W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance l

Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission State.0ffice Building 475 Allendale Road

. Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 l

Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Bostan Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 J. P. Stetz, Unit Superintendent Millstone Unit No. 1 Northeast Nuclear Energy Company Post Office Box 128 Waterford, Connecticut 06385 1

i J

I

_