ML20245C808

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/89-03 on 890201-0318 & Notice of Violation
ML20245C808
Person / Time
Site: Fort Saint Vrain 
Issue date: 04/14/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245C810 List:
References
NUDOCS 8904270394
Download: ML20245C808 (2)


See also: IR 05000267/1989003

Text

w ,

,

:t '; Ql

r

c,

w,

p,;

' .

-

o

m j

,

,

~

'

p

APRfl 4 3

-

,

In Reply Refer To':

,

' Docket:

50-267/89-03

,

o

L

b

.

Public l Service' Company "of Colorado

,'

ATTN:

Robert'O.- Williams, Jr.

I:g ,

' Senior Vice President, Nuclear Operations

P.0;. Box;840 .

,

[,

Denver,1 Colorado 180201-0840

s

'

P

Gentlemen:

This refers to the inspection conducted _by Messrs. R. E..Farrell and P. W.:

'

Fl

Michaud'of this office during:the period February 1 through March 18, 1989, of;

activities l authorized by NRC Operating License DPR-34 for Fort St. Vrain

Nuclear Generating' Station, and to the-discussion of our-findings with you and

'o

"

other, members.of your: staff-at the conclusion of the inspection.

m

, Areas examined'durir.g the2 inspection included onsite followup of licensee event

i

f

reports:(LERs) reserve shutdown material removal, operational safety

..

L

verification, radiological controls, monthly surveillance observation, monthly

' maintenance observation, and a coastdown and defueling meeting. 'Within these

'O

areas, the inspection consisted of selective examination of, procedures and

representative records, interviews with personnel, and observations'by the

minspectors. .The; inspection findings are documented in the enclosed inspection-

/ report.

During this inspection, it was_found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

o

".

this~ violation, in. writing, in'accordance with the provisions _of Section 2.201

'of the NRC's "RulesEof Practice,".Part 2,-Title 10, Code of Federal Regulations.

' '

Your. response should be based on the specifics contained in the Notice of

Violation' enclosed with this' letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance' procedures of the Office of Management and Budget as required

by the Paperwork Reduction ~Act of 1980, PL 96-511. ,

i

e

hN

/

'

g

A

PE:DRP/B

C:DRP/B

D:DRP

U

J

RIV: SRI-

R

..

RPMullikin

TFWesterman

LJCallan

-

.REFarrell/kc -

PWMichaud

/

a y //189

j y //g89

L(// g/89 '

y'/lJ/89

f/p//89

8904270394 890414

~

D \\

PDR

ADOCK 05000267

L(

G

PNU

_ _ _ _ - .__ - _

_ -- _

.

- - ---_ __--

. . .

'.

"

,

.

.

'

~

Public Service Company of Colorado

-2-

l

i

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

)

Original Signed By

.

.I. F,1Nestenuan

,

L. J. Callan, Director

Division of P.eactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-267/89-03

cc w/ enclosures:

Fort St. Vrain Nuclear Station

ATTN:

C. Fuller, Manager, Nuclear

Production Division

16805 WCR 191

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

ATTN:

P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 19}

Platteville, Colorado 80651

Colorado Public Utilities Connission

ATTN:

Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

Colorado Ra.iiation Control Program Director

bec to DMB (IE01)

bec distrib by RIV:

  • RR1
  • R. D. Martin, RA
  • SectionChief(DRP/B)
  • Project Engineer, DRP/B
  • RPBDRSS
  • Lisa Shea, RM/ALF
  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager (MS:

13-D-18)

  • RIV File
  • DRP
  • DRS
  • w/766

_ - - - _