ML20245C808
| ML20245C808 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/14/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20245C810 | List: |
| References | |
| NUDOCS 8904270394 | |
| Download: ML20245C808 (2) | |
See also: IR 05000267/1989003
Text
w ,
,
- :t '; Ql
r
c,
w,
p,;
' .
-
o
m j
,
,
~
'
p
APRfl 4 3
-
,
In Reply Refer To':
,
' Docket:
50-267/89-03
,
o
L
b
.
- Public l Service' Company "of Colorado
,'
ATTN:
Robert'O.- Williams, Jr.
I:g ,
' Senior Vice President, Nuclear Operations
P.0;. Box;840 .
,
[,
Denver,1 Colorado 180201-0840
s
'
P
Gentlemen:
This refers to the inspection conducted _by Messrs. R. E..Farrell and P. W.:
'
Fl
Michaud'of this office during:the period February 1 through March 18, 1989, of;
- activities l authorized by NRC Operating License DPR-34 for Fort St. Vrain
Nuclear Generating' Station, and to the-discussion of our-findings with you and
'o
"
other, members.of your: staff-at the conclusion of the inspection.
m
, Areas examined'durir.g the2 inspection included onsite followup of licensee event
i
f
reports:(LERs) reserve shutdown material removal, operational safety
..
L
verification, radiological controls, monthly surveillance observation, monthly
' maintenance observation, and a coastdown and defueling meeting. 'Within these
'O
areas, the inspection consisted of selective examination of, procedures and
representative records, interviews with personnel, and observations'by the
minspectors. .The; inspection findings are documented in the enclosed inspection-
/ report.
During this inspection, it was_found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
o
- ".
this~ violation, in. writing, in'accordance with the provisions _of Section 2.201
'of the NRC's "RulesEof Practice,".Part 2,-Title 10, Code of Federal Regulations.
' '
Your. response should be based on the specifics contained in the Notice of
Violation' enclosed with this' letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance' procedures of the Office of Management and Budget as required
by the Paperwork Reduction ~Act of 1980, PL 96-511. ,
i
e
hN
/
'
g
A
PE:DRP/B
C:DRP/B
D:DRP
U
J
RIV: SRI-
R
..
RPMullikin
TFWesterman
LJCallan
-
.REFarrell/kc -
PWMichaud
/
a y //189
j y //g89
L(// g/89 '
y'/lJ/89
f/p//89
8904270394 890414
~
D \\
ADOCK 05000267
L(
G
PNU
_ _ _ _ - .__ - _
_ -- _
.
- - ---_ __--
. . .
'.
"
,
.
.
'
~
Public Service Company of Colorado
-2-
l
i
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
)
Original Signed By
.
.I. F,1Nestenuan
,
L. J. Callan, Director
Division of P.eactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/89-03
cc w/ enclosures:
Fort St. Vrain Nuclear Station
ATTN:
C. Fuller, Manager, Nuclear
Production Division
16805 WCR 191
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
ATTN:
P. Tomlinson, Manager
Quality Assurance Division
16805 WCR 19}
Platteville, Colorado 80651
Colorado Public Utilities Connission
ATTN:
Ralph Teague, P.E.
1580 Logan Street OL1
Denver, Colorado 80203
Colorado Ra.iiation Control Program Director
bec to DMB (IE01)
bec distrib by RIV:
- RR1
- R. D. Martin, RA
- SectionChief(DRP/B)
- Project Engineer, DRP/B
- RPBDRSS
- Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager (MS:
13-D-18)
- RIV File
- DRP
- DRS
- w/766
_ - - - _