_ - _ ,. -
,
APR I'81989
l
.
..- .
1
-
In Reply Refer To:
Dockets:
50-313/89-16
50-368/89-16
)
Arkansas Power & Light Company
!
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
,
Gentlemen:
This refers to the inspection conducted by Mr. W. M. McNeill of this office
during the period March 27-31, 1989, of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for Arkansas Nuclear One Units 1 and 2, and to the
discussion of our findings with Mr. E. C. Ewing and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection involved action on previcusly identified
inspection findings and licensee self-assessment capabilities. Within these
areas,-the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspector. The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:RI
C:MQPS g
D:
S fo
D DR
WMMcNeill;ap
IBarnes
J.Mi hoan
LJCallan
4 / 13/8 9
+ /a/89
/j
89
4/l5/89
"
~
gp
l
89042703B4 890418
f'
POR
ADDCK 05000313
G
PNV
g
,
p,,
.-
>
-
,
,
,
q
- .
T.
li
'
'
O. .
nd
L
i
'! Arkansas-Power & Light' Company
-2-
'
Should you have:any questions concerning this' inspection, we will be pleased to
discuss =them with you.
Sincerely,
~
n
.
)
L. J. Callan Director
-
Division'of Reactor Projects
-Enclosures: ~
'
,
1. . Appendix A --Notice of Violation
2.
Appendix B.- NRC' Inspection Report
.
50-313/89-16
~
50-368/89-16
cc w/ enclosures:
Arkansas Nuclear'One
ATTN:- J
M. Levine,' Executive-
.
Director, Nuclear Operations
'P.O. Box 608-
Russellville Arkansas .72801
' Arkansas Radiation Control Program Director-
bccto'DMB(IE01)
bec~distrib. by RIV:
- RRI
- R. D. Martin, RA.
- RPB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
'*RIV File.
- DRP
- MIS System
- RS'S Operator
- Project Engineer, DRP/A
- DRS
.
- B. McNeill
- C. Harbuck, NRR Project Manager (MS: ' 13-D-18)
- C. Poslusny,'NRR' Project Manager (MS:
13-D-18)
- I. Barnes
- w/766
4
-
__________________________m.
_ _ _ _ _ _ _ _