1.
Wisconsin Electnc m com 231 W.MICIilGAN.P.O. BOX 2046 AILWAJKEE,WI53201 (414)221-2345 VPNPD-8 9-2 3 7 t-NRC-89-047 April 18, 1989 Document Control Desk U.
S. NUCLEAR RI301.ATORY COMMISSION Mail Station P137 Washington, D.C.
20555 l
Gentlemen:
DOCKET NOS. 50-266 AND 50-301 TMI ACTION PLAN STATUS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Please find attached the status of Wisconsin Electric's implementation of TMI Action Plan Items at Point aeach Nuclear Plant.
This was
. requested in your letter dated April 14, 1989.
To the best of my knowledge, all items are complete with two exceptions.
Expected completion dates for these two items are provided in notes on the attachment.
He would be pleased to answer.any questions you may have regarding this information.
Sincerely, su.g/-
C.
W. ray Vice-President Nuclear Power Attachment ~
Copy to NRC Regional Administrator, Region III NRC Resident Inspector 4
ddh 8904270382 890418 PDR ADOCK 05000266L P
PNU l
._.-__ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ = _ _ - _ _ _ - _ _ _.. _ _ _ _ _ _ _ - - _ _ - - _ - - - - _ _ - _ _ _ _ _ _ _ _ _,
3
,o ATTACHMENT 1 TMI ACTION PLAN STATUS LIST POINT BEACH NUCLEAR FLANT, UNITS 1 AND 2 April 18, 1989 ISalE NUMBER LICENSEE IMPLEMENTATION STATUS-I.A.l.l.1 C-1981 I.A.l.l.2 C
1981 I.A.l.l.3 C
'1981 I.A l.l.4 C
1981 I.A.1.2 C
4/81 I.A.l.3.1 C
1981 I.A.l.3.2 C
2/85 I.A.2.1.1 C
1981 I.A.2.1.2 C
1981 I.A.2.1.3 C
1981 I.A.2.1.4 C
1981 I.A.2.1.5 C
1981 I.A.2.3 C
1980 I.A.3.1.1 C
I.A.3.1.2 C
I.A.3.1.3.A N/A I.A.3.1.3.B C
I.B.l.2 N/A I.C.l.1 C
I.C.1.2.A C
I.C.l.2.B C
7/85 I,,C.1.3.A.
C I.C.1.3.B
'c 7/85 I.C.2 C
I.C.3 C
I.C.4 C
I.C.5 C
1980 I.C.6 C
1980 I.C.7.1 N/A I.C.7.2 N/A I.C.8 N/A I.D.1 Note 1 I.D.2.1 C
6/86 I.D.2.2 C
1/87 I.D.2.3 C
1/87 = _ - _
_ _ = _ -
c-7, I
/
ISSUE NUMBER-LICENSEE IMPLEMENTATION STATUS I.G.l.1 N/A I. G.1. 2.
'N/A cI.G.l.3 N/A i
- II.B.l.11 C
'II.B.l.2
.C Ul l/84 U2 12/84 II.B.l.3 C
'II.B.2.1 C
[
II.B.2.2 C
II.B.2.3 C
1/84 II.B.2.4 N/A II.B.3.1 C
II.B.3.2
'N/A II.B.3.3 lN/A II.B.3.4 C
9/84 II.B.4.1 C
t
-II'B.4.2.A' C
II.B.4.2.B C-1981
'II.D.l.1 C
II.D.l.2.A C
II.D.l.2.B Note 2 LII.D.l.3 N/A' II.D.3.1 C
II.D.3.2 C
II.E.1.1.1 N/A II.E.1.1.2 C
L.
II.E.1.1.3 C
II.E.1.2.1.A NC II.E.1.2.1.B NC
'II.E.1.2.2.A C
II.E.1.2.2.B C
II.E.1.2.'2.C C-II.E.3.1.l' NC II.E.3.1.2 C
II.E.4.1.11 NC
'II.E.4.1.2 N/A
'II.E.4.l'.3 NC U
.II.E.4.2.1-4 C
1983 II.E.4.2.5.A C
1981 II.E.4.2.5.B NC II.E.4.2.6 C
II.E.4.2.7 NC
- II.E.4.2.8 C
II.F.1.1 N/A II.F.1.2.A C
3/85 II.F.1.2.B C
3/85 c.
Pr.
g,.-
l 9
' ISSUE NUMBER' LICENSEE IMPLEMENTATION STATUS
'II.F.1.2'C C
'3/85 L
TII.F.1.2,D C-3/85 j
'II.F.1.2.E C
3/85.
II.F.1.2.F' C
3/85' i
II.F.2.1 N/A II.F.2.2.
C II.F.2.3 C (Tech' Spec)
II.F.2.4 C-(Install level instru-mentation)
'II.G.l.1 NC
'II.G.l.2 C
9/81' II.K.It C.
II. K.' l. 5 N/A
-II.K.l.10 N/A II.K.l.20 N/A L
II.K.1.21 N/A II.K.l.22-N/A II.K.l.=23.
'N/A II.K.2.2 N/A II.K.2.8 N/A II.K.2.9 N/A II.K.1.10 N/A II.K.2.ll N/A II.K.2.13 C
6/84 II.K.2.14 N/A II.K.2.15 N/A II.K.2.16 N/A II.K.2.17 C
1/84
'II.K.2.19 N/A II.K.2.20 N/A II.K.3.1.A N/A II.K.3.1.B N/A II.K.3.2 NC II.K.3.3
.C II.K.3.5.A C
II.K.3.5.B C
7/85 II.K.3.7 N/A II.K.3.9 C
II.K.3.10 NC II.K.3.ll N/A II.K.3.12.A NC
'II.K.3.-12.B NC II.K.3.13.A N/A II.K.3.13.B N/A
'II.K.3.14 N/A 3'-
D I.,
r'-
n--.--
I l
k 1
ISSUE NUMBER LICENSEE IMPLEMENTATION STATUS II.K.3.15 N/A II.K.3.16.A N/A II.K.3.16.B N/A II.K.3.17 C
1983 II.K.3.18.A N/A II.K.3.18.B N/A II.K.3.18.C N/A II.K.3.19 N/A II.K.3.20 N/A II.K.3.21.A N/A II.K.3.21.B N/A II.K.3.22.A N/A II.K.3.22.B N/A II.K.3.24 N/A II.K.3.25.A NC II.K.3.25.B NC II.K.3.27 N/A II.K.3.28 N/A II.K.3.29 N/A II.K.3.30.A C
II.K.3.30.B C
II.K.3.30.C C
8/85 II.K.3.31 C
II.K.3.40 N/A II.K.3.43 N/A II.K.3.44 N/A II.K.3.45 N/A II.K.3.46 N/A II.K.3.57 N/A III.A.l.1 C
III.A.l.2.1 C
III.A.l.2.2 C
1/87 III.A.1.2.3 C
III.A.2.1 C
III.A.2.2 C
11/87 III.D.l.l.1 C
III.D.l.l.2 C
III.D.3.3.1 C
III.D.3.3.2 C
III.D.3.4.1 C
III.D.3.4.2 N/A III.D.3.4.3 C
MPA-F008 C
MPA-F063 C
1/87 -
1
)
ISSUE NUMBER LICENSEE IMPLEMENTATION STATUS 4
MPA-F064 C
12/84 MPA-F065 C
1/87 MPA-F071 Note 1 MPA-B072 C
1983 MPA-B083 C
7/86 67.4.1-(G001)
C 12/85 Notes 1.
I.D.1:
Control Room Design Review The Control Room Design Review is complete.
All HED's are expected to be complete by 12/31/90 with one exception, the installation of instrument bus static transfer switches is expected to be complete by 12/31/93.
2.
II.D.l.2.B:
Relief and Safety Valve Test Requirements We expect to complete implementation of this item by June 30, 1989.
Complete C
=
No Changes Required NC
=
N/A =
Not Applicable to PBNP i
I.