ML20245C737

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1986 for Wolf Creek Generating Station
ML20245C737
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/31/1986
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20244E085 List:
References
NUDOCS 8904270363
Download: ML20245C737 (2)


Text

-, - - _

[ ::

s.,'

i,~

f.

h

,j U<

r.

.l u

i

' Attachment' 2 to WM 89-0108 Revised.Page'to October 1986 Monthly Operating Report i.

i ADOCK05000482g[-

B904270363 890413 PDR PDR y R

1

'Att'achmsnt 2 to WM 89-0108 l

~ Page 1 of 1 l

OPERATING DATA REPORT DOCKET NO. STN 50-482 WOLF CREEK GENERATING STATION KANSAS GAS AND ELECTRIC COMPANY DATE 11-01-86 COMPLETED BY M. Williams TELEPHONE 316-364-8831 l

OPERATING STATUS 1.

Reporting Period:

October, 1986 Gross Hours in Reporting Period:

745 2.

Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (tMe-Net): 1128 Design Electrical Rating (MWe-Net):

1170 3.

Power Level to Which Restricted (If Any) (Mwe-Net):

N/A 4.

Reasons for restriction (If Any):

N/A This Month Yr to Date Camulative 5.

Number of Hours Reactor was Critical 363.1 6,216.7 9,007.0 6.

Reactor Reserve Shutdown Hours 0.0 92.5 171.3 7.

Hours Generator on Line 362.0 6,178.4 8,950.0 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thernal Energy Generated (MNH) 1,219,774 20,220,409 29,095,342

10. Gross Electrical Energy Generated (ttm) 428,192 7,069,422 10,140,512 11.

Net Electrical Energy Generated (MNH) 404,174 6,759,049 9,701,149 l

12.

Reactor Service Factor 48.7 85.2 88.5 13.

Reactor Availability Factor 48.7

86. 5 90.2 14.

Unit Service Factor 48.6 84.7 88.0

15. Unit Availability Factor 48.6 84.7 88.0 i
16. Unit Capacity Factor (Using MDC) 48.1 82.1 84.5 l
17. Unit Capacity Factor (Using Design MWe) 46.4 79.2 81.5 l

[

18.

Unit Forced Outage Rate 0.0 4.5 4.3 19.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None 20.

If Shut Down at End of Report Period, Estimated Date of Startup:

N/A 21.

Units in test Status (Prior to Commercial Operation): Forecast Achieved l

Initial Criticality 5-22-85 5-22-85 Initial Electricity 6-13-85 6-12-85 Commercial Operation 9-09-85 9-03-85 Page 8 of 11

!