ML20245C584

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Byron Units 1 & 2 for Feb 1989
ML20245C584
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/28/1989
From: Spitzer D
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20244E074 List:
References
NUDOCS 8904270260
Download: ML20245C584 (4)


Text

.

4 l

Attached are corrections to the " Operating Status" sections of the February report (originally submitted March, 1989). These changes are due to corrections in the computer program that calculates these values.

l l

l B904270260 890410 PDR ADOCK 0500 4,

R (0625M/0062M-16)

I

d B.

OPERATING DATA REPORT DOCKET NO.:

050-454 L

UNIT:

Byron One l

DATE:

03/10/89 COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 x2023 OPERATING STATUS 1.

Reporting Period February 1989.

Gross Hours:

672 l

2.

Currently Authorized Power Level: 3411 (MWt) l Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restricted (If Any): N/A 4.

Reasons for Restriction (If Any):

THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

672 1416 30289 6.

Rx Critical Hours 668.7 1398.7 23195.8 7.

Rx Reserve Shutdown Hours 0

0 37.8 8.

Hours Generator on Line 663.6 1393.6 22750.5 9.

Unit Reserve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 2133181 4568669 68095982
11. Gross Elec. Energy (MWH) 719363 1552072 22864953
12. Net Elec. Energy (MWH)
    • 684815 ** 1491982 ** 21510230
13. Reactor Service Factor 99.5 98.8 76.6
14. Reactor Availability Factor 99.5 98.8 76.7
15. Unit Service Factor 98.8 98.4 75.1
16. Unit Availability Factor 98.8 98.4 75.1
17. Unit Capacity Factor (MDC net) 92.2
    • 95.3 64.3
18. Unit Capacity Factor (DER net) 90.9
    • 94.1 63.4
19. Unit Forced Outage Hrs.

8.4 22.4 1057

20. Unit Forced Outage Rate 1.3 1.6 4.4
21. Shutdowns Scheduled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.
    • These values have been revised due to a computer algorithm problem.

(0625M/0062M-17)

L O

B.

OPERATING DATA REPORT DOCKET NO.:- 050-455 UNIT:

Byron Two DATE:

03/10/89 COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 x2023 OPERATING STATUS 1.

Reporting Period:

February 1989. Gross Hours:

672 2.

Currently Authorized Power Levels.3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restricted (If Any): N/A 4.

Reasons for Restriction (If Any):

THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

672 1416 13393 6.

Rx Critical Hours 0

144.3 11149.5 7.

Rx Reserve Shutdown Hours 0

0 0

8.

Hours Generator on Line 0

144.3 10845.5 9.

Unit Recerve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 0 156411 26981828
11. Gross Elec. Energy (MWH) 0 48706 8946623
12. Net Elec. Energy (MWH)
    • -8229
    • 27885 ** 8356711
13. Reactor Service Factor 0

10.2 83.2

14. Reactor Availability Factor 0

10.2 83.2

15. Unit Service Factor 0

10.2 81.0

16. Unit Availability Factor 0

10.2 81.0

17. Unit Capacity Factor (MDC net) 0 1.8 56.4
18. Unit Capacity Factor (DER net) 0 1.8 55.7
19. Unit Forced Outage Hrs.

0 0

462.6

20. Unit Forced Outage Rate 0

0 4.1

21. Shutdowns Scheduled Over Next 6 Months:

If Shutdown at End of Report Period, Estimated Date of Startup:

03/06/89 22.

23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.
    • These values have been revised due to a computer algorithm problem.

l (0625M/0062M-18)

>