ML20245C577

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Mar 1989 & Revised Monthly Operating Repts for Feb 1989 for Byron Nuclear Power Station
ML20245C577
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/10/1989
From: Pleniewicz R
COMMONWEALTH EDISON CO.
To:
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20244E074 List:
References
BYRON-89-0361, NUDOCS 8904270251
Download: ML20245C577 (1)


Text

,

s N(fC:mmonw::dth Edison 4

0 ) Byron Nuclear Station v

c O"-

-- 4450 North German Church Road Byron, Illinois 61010.

t

' April:10, 1989:

LTR:

BYRON 89-0361 FILE:

2.7.200--

Director, Office of' Management Information and. Program Control United States Nuclear Regulatory Commission Washington, D.C.

20555 l

ATTN:

Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron

. Nuclear Power Station for the period March 1 through March 31, 1989.

Sincerely, d

.R.

Pleniewicz

/

Station Manager g/

Byron' Nuclear Power Station RP/DJS/bb cc:

A.B. Davis, NRC, Region III NRC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety T.J. Malman/K.L. Graesser Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering INPO Records Center L. 01shan - USNRC 1

l 8904270251 890410 PDR ADOCK 05000454 R

PDR (0625M/0062M)

]

(0625M/0062M-1)