ML20245C561
| ML20245C561 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/20/1989 |
| From: | Jim Hickey NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20245C562 | List: |
| References | |
| EA-89-074, EA-89-74, NUDOCS 8904270228 | |
| Download: ML20245C561 (2) | |
See also: IR 05000266/1989014
Text
__
- _ - _ _ _ _ _ _
"
u,.
'
- .
- CS A E "A ' I n 5 m n
,.-m
,
>
. .
.
-
c
0
vn
L.u sn u0
11J U T V M ,U T
4
. APR 2 01989
Docket No. 50-266-
Docket No. 50-301
EA 89-074
Wisconsin Electric' Power Company
ATTH:
Mr.-C.'W. Fay
.-
Vice President
Nucle 6r. Power
'231 West Michigan' Street - P379
.
Milwaukee, L'I . 53201
s-
-
Gentlemen:
'
This refers to the reactive safeguards' inspection conducted by Mr. T. J. Madeda
of this offic<., on April 3 and 4,1989, .of activities at the Point Beach Nuclear
Plant authorized by NRC Operating' Licenses No. DPR-24 and No. DPR-27 and to the
discussion of our findings with Mr.'J. Zach and other members of your staff at
- the conclusion of the inspection.
During this inspection, certain of your activities appeared to be in violation
of.NR0 requirements. You will be notified by separate correspondence of our
dec', ion regarding enforcement actions based on the findings of this inspection.
No written response is required until you are notified of the proposed
- e>,forcement action.
Areas: examined dur.ing this inspection concern a subject matter which is exempt
.
from disclosure'according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, our report
of this inspection will not be placed in the NRC Public Document Rcom.
' We will gladly discuss any questions you have concerning this inspection.
Sincerely,
8904270228 890420
4
{DR
ADOCK 05000266lN
/s/ John H. N. Hickey
John W. N. Hickey, Director
Division of Radiation Safety
and Safeguards
Enclosure:
Inspection Reports
No. 50-266/89014(DRSS);
g 'QN
No. 50-301/89013(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
I[
See Attached Distribution
RIII
RIII
EIII
RIII
RI I
RI I
shv
I
.A ckey h
/
o-
,
M deda/rr
C ed
ger
D
y tte
S
. ton
y y/ g
4
9
.
Enclosure contains
/
-
j
SAFEGUARDS INFORMATION
Oa
^
- -mn
M:': UNI \\l>v
Upon separation this
re n m n nx,..y.i m ,
11is vniva siiva
page is Decontrolled
-___
___-__:_______-____________
- _ _ _ _
__
..%'
-S!!ECUA!!DS INFORiviriL0a
..
-
.
Wisconsin Electric Power Company
2
ApR 2 01383
Distribution
L
cc w/ enclosure:
J. J. Zach, Plant Manager
NRR/DRIS/SGB
NRR/DRIS/ SIB
NRR/DLPQ/PEB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Virgil Kanable, Chief
Boiler Section
Charles Thompson, Chairman
Wisconsin Public Service
Commission
R. I. Braund (SLO),
WI Div. of Emergency Government
Lawrence J. McDonnell, Chief
Radiation Protection Section
WI Department of Health and
Social. Services, Division
of Health
i
Enclosure contains
SAFEGUARDS INFORMATION
Upon separation this
on:n,,~. .~
pus 2 is Decontrolled
NntLOUnntJQ lly j'VjGijM l lQj\\
- _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _
_
_- _