ML20245C519
| ML20245C519 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/23/1987 |
| From: | Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20245C522 | List: |
| References | |
| NUDOCS 8711030191 | |
| Download: ML20245C519 (5) | |
See also: IR 05000445/1987021
Text
_ _ _
_
_ - _ _ __ _ _ __-
.
.
VWminx
~
.!} 0CT 2 31967 f
In Reply Refer To:
g ig ; g n . n g.,.
Docket:
50-445/87-21
'
'
TU Electric.
ATTN:
Mr.
W.'G.
Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas,. Texas
75201
Gentlemen:
l
This refers to the inspection conducted by Mr. D. L. Kelley of the
-Comanche Peak Project Division during the period September 3
'
through October 6, 1987, of activities authorized by NRC
Construction Permits CPPR-126 for the Comanche Peak Steam Electric
Station, Unit 1, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observation by the
inspectors.
Within the scope of the inspection, no violations or deviations
were' identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of'this letter, the enclosures, and your response to this
letter will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
1
be pleased to discuss them with you.
Sincerely,
i
ORIGINAL SIGNED BY R. F WARNICK
R.
F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Special Projects
Enclosures:
Inspection Report 50-445/87-21
cc: See next page
OSP:CPPD:Ip:, SRI
AD:IP RR@
s
DKelley W
RWarnick
10/ 0/87
10/23/87
7
8711030191 871023
ADOCK 05000445
G
- - __
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _
l
l
!
.
.
8
'o
UNITED STATES
- g
!"-
NUCLEAR REGULATORY COMMISSION
o
l
$,
$
WASHINGTON, D, C. 20555
IMMl!Xit7$Gd
{
i
w
1
\\
In Reply Refer To:
l
Docket:
50-445/87-21
I
TU Electric
ATTN:
Mr. W. G.
Counsil
Executive Vice President
l
400 North Olive Street, Lock Box 81
l
Dallas, Texas
75201
l
I
Gentlemen:
'
This refers to the inspection conducted by Mr. D.
L. Kelley of the
Comancho Peak Project Division during the period September 3
through October 6, 1987, of activities authorized by NRC
Construction Permits CPPR-126 for the Comanche Peak Steam Electric
Station, Unit 1, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observation by the
inspectors.
Within the scope of the inspection, no violations or deviations
were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
I
copy of this letter, the enclosures, and your response to this
letter will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
l
Sincerely,
kf0&
R.
F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Special Projects
Enclosures:
Inspection Report 50-445/87-21
cc: See next page
-
_ _ - _ _ - _ _ _ _ _ _ _
', TU Electric
'
cc w/ enclosure:
TU Electric
Bureau of Radiation Control
ATTN:
R. D. Walker
State of Texas
Mgr., Nuclear Licensing
1100 West 49th Street
Skyway Tower
Austin, TX
78756
400 North Olive Street, L.B.81
Dallas, TX
75201
Nancy H. Williams
CYGNA Energy Services
Juanita Ellis
Suite 390
i
President - CASE
2121 N. California Blvd
1426 South Polk Street
Walnut Creek, CA
94596
Dallas, TX
75224
4
Thomas G. Dignan, Jr.
Renea Hicks, Esq.
Ropes & Gray
Assistant Attorney General
225 Franklin Street
Environmental Protection Division
Boston, MA
02110
P.O.
Box 12548, capitol Station
Austin, TX
78711-2548
Robert A. Wooldridge, Esq.
Worsham, Forsythe, Sampels
Administrative Judge Peter Bloch
and Wooldridge
U.S. Nuclear Regulatory Commission
2001 Bryan Tower
!
20555
Sui *a 2500
-
Dallas, TX
75201
Elizabeth B. Johnson
Administrative Judge
Mr. Homer C. Schmidt
Oak Ridge National Laboratory
Director of Nuclear
Post Office Box X, Building 3500
Services
Oak Ridge, TN
37830
TU Electric
Skyway Tower
Dr. Kenneth A. McCollom
400 N. Olive St.,
L.B.
81
1107 West Knapp
Dallas, TX
75201
Stillwater, OK
74075
Mr. Robert E. Ballard, Jr.
Dr. Walter H. Jordan
Director of Projects
Administrative Judge
Gibbs and Hill, Inc.
881 West Outer Drive
11 Penn Plaza
Oak Ridge, TN
37830
New York, NY
10001
Anthony Z. Roisman, Esq.
Mr.
R. S.
Howard
suite 600
Westinghouse Electric
1401 New York Avenue,
N.W.
Corporation
20005
Post Office Box 355
Pittsburgh, PA
15230
Ms. Billie Pirner Garde, Esq.
Government Accountability Project
Lanny A. Sinkin
Midwest Office
Christic Institute
104 East Wisconsin Avenue
1324 N. Capitol Street
Appleton, WI
54911
20002
,
,
.
TU Electric
cc w/ enclosure:
(continued)
David R.
Pigott, Esq.
Orrick, Herrington & Sutcliffe
600 Montgomery Street
San Francisco, CA
94111
Robert Jablon
Bonnie S.
Blair
Spiegel & McDiarmid
1350 New York Avenue, NW
20005-4798
George A.. Parker, Chairman
Public Utility Committee
)
Senior Citizens Alliance of
Tarrant County, Inc.
6048 Wonder Drive
Fort Worth, TX
76133
Joseph F.
Fulbright
1
Fulbright & Jaworski
1301 McKinney Street
Houston, TX
77010
l
Mr. Jack Redding
c/o Bethesda Licensing
]
TU Electric
3 Metro Center, Suite 610
Bethesda, MD
20814
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert &
Rothwell
suite 700
1025 Thomas Jefferson St.,
NW
20007
James M. McGaughy
GDS Associates, Inc.
Suite 450
2525 Cumberland Parkway
i
Atlanta, GA
30339
Regional Administrator, Region IV
U.S.
Nuclear Regulatory Commission
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
..
- - - ___ - -__-____ ___ __
. _ _ _ _ _ _ _
_____
_ _ _ _
_ -___- _ _
______ - _ _ _ _ _ __ _ _
.
.>
f
.
DISTRIBUTION _:
, o . , , ,
. a. m vy~ ,. .
1
' Docket.c Files i ( 50$, . .- .- . .,, .45/,4461;y'
.
'
NRC PDR
l
LPDR
l
OSP Reading
l-
CPPD-LA
CPPD Reading (HQ)
- Site Reading
- CPRT Group
- SRI-OPS
- SRI-CONST
AD for. Projects
- MIS System, RIV
- RSTS Operator, RIV
RPB, RIV
RIV Docket File
.
!
- DWeiss, RM/ALF
JTaylor
JKeppler/JAxelrad
CIGrimes
PFMcKee
JLyons
AVietti-Cook
MMalloy
JMoore, OGC
JGilliland, RIV
FMiraglia
EJordan
l
JPartlow
BHayes
- w/766
l