ML20245B710
| ML20245B710 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/05/1989 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20245B712 | List: |
| References | |
| NUDOCS 8904260236 | |
| Download: ML20245B710 (4) | |
Text
._
O 4
It N
Duke heer Company llu R Tao l
P C tha,1.1198
\\1o President Charintte. N C 282n Auckar Prodrt,n,
. t crot>samt i
I:{
)
DUKEPOWER 1
April 5, 1989 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.
20555 l
Re:
Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Emergency Plan Implementing Procedures
Dear Sir:
Please find enclosed for NRC Staff use and review one copy of the following Catawba Nuclear Station Emergency Plan Implementing Procedures:
HP/0/B/1000/06 - Emergency Equipment Functional Check and Inventory Directive 3.8.4 - Onsite Emergency Organization Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room, specifically:
Directive 3.8.4, Enclosure 1, pages 1 thru 14 of 14 This revision is being submitted in accordance with 10 CFR 50.54(q) and does not decrease the effectiveness of the Emergency Plan Implementing Procedures or the Emergency Plan.
By copy of this letter, two copies of the above document is being provided to the NRC, Region II.
Very truly yours, M
Hal B. Tucker 6
KLC:k1c l
OfE U Enclosures 8904260236 890405
{DR ADOCK 05000413 PDC l
'~~
xc:
(w/ enclosure)
(w/o enclosure)
Mr. Stewart D. Ebneter, NRC Resident Inpector Regional Administrator Catawba Nuclear Station U.
S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, suite 2900 Atlanta, Georgia 30323
7
- 7 3
q_
.s.a p AL.'
l' l.
~
n Page 1 of 2
- r n s
DUKE POWER COMPAhY d'
CATAWBA NUCLEAR STATION
~i EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX
+:
PROCEDURE #
TITLE m
RP/0/A/5000/01 Classification of Emergency (9/14/88)
RP/0/A/5000/02 Notification of Unusual Event (7/15/88)
RP/0/A/5000/03 Alert.(7/15/88)
RP/0/A/5000/04 Site Area Emergency (7/15/88)
RP/0/A/5000/05 General Emergency (7/15/88)
, [3 RP/0/A/5000/06 Follow-up Notification (5/4/87) j; RP/0/A/5000/07 Natural Disaster and Earthquake (10/17/88)
RP/0/A/5000/08 Release of A Hazardous Substance (3/3/89)
RP/0/A/5000/09 Collision / Explosion (7/30/87)
RP/0/A/5000/10-Conducting A Site Assembly or Evacuation (7/15/88)
RP/0/A/5000/11 Protective Action Recommendations Without The OAC (10/19/88) 4 RP/0/B/5000/12 Control of Assessment and Repair Teams (1/6/88)
RP/0/B/5000/13 HRC Notification Requirements (9/14/88)
RP/0/B/5000/14 Follow-up Notifications From TSC (2/11/88)
HP/0/B/1000/06 Emergency Equipment Functional Check and Inventory (3/23/89)
HP/0/B/1009/01 Health Physics Recovery Plan (8/18/87)
HP/0/B/1009/03 Health Physics Response Following a Primary to Secondary Leak (7/30/87)
HP/0/B/1009/04 Environmental Monitoring for Emergency Conditions Within the Ten-Mile Radius of Catawba Nuclear Station (9/08/88)
)
)
HP/0/B/1009/05 Personnel / Vehicle Monitoring for Emergency Conditions (1/12/87)
March 29, 1989
U ~
s,
[.
l
?
r Page 2 of 2 DUKE POWER COMPANY CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX I'
PROCEDURE #
TITLE 1.
HP/0/B/1009/06 Alternative Method for Determining Dose Rate Within the Reactor Building (1/12/87)
HP/0/B/1009/07 In-plant Particulate and Iodine Monitoring Under Accident Conditions (01/30/89)
HP/0/B/1009/08 Contamination Control During Transportation of Contaminated In]ured Individuals (6/3/87)
HP/0/B/1009/09 Guidelines for Accident and Emergency Response (11/15/88)
HP/0/B/1009/12 Quantifying Gaseous Releases through Steam Relief Valves Under Post-Accident Conditions (2/15/85)
HP/0/B/1009/14 Health Physics Actions Following an Uncontrolled Release of Liquid Radioactive Material (2/4/85)
HP/0/B/1009/16 Distribution of Potassium Iodide Tablet in the Event of a Radioiodine Release (10/19/87)
HP/0/B/1009/17 Post Accident Containment Air Sampling System (3/10/87)
HP/0/B/1009/18 Offsite Dose Projections (03/07/89)
HP/0/B/1009/19 Emergency Radio System Operations, Maintenance and Communications (10/13/87)
OP/0/A/6200/21 Operating Procedure for Sampling at the Post Accident Liquid Sample Panel (09/07/88)
~
CNS Directive 3.7.5 Response to Bomb Threat (4/27/87)
CNS Directive 3.8.4 Onsite Emergency Organization (3/22/89)
CNS Directive 2.0.1 News Release / Rumor Control (2/15/88)
CNS Directive 3.0.7 Site Assembly / Evacuation (10/17/88)
I 1
l March 29, 1989 I
4
_ ~ - _ _ _ _ _.
', '- 4 c.no
.{
4 g.
je,,
- UNITED STATES NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20555 "k,.....,/
l Docket No. 50-413 Catawba Nuclear Station
. MEMORANDUM FOR:
Chief, Document Management Branch, TIDC FROM:
Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed.the attached document and has determined that it may now be made publicly available.
/ k.rs l l
- ' )
h.
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
]h
Attachment:
As stated Ofo*
\\
l
_ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ - - -