A Log # TXX-89419 1

File # 10130 i

r C

IR 89-12 I

4 gnefg R

nlELECTRIC og g,g William J. Cahill Jr.

Executive Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk J

Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

'0CKET NOS. 50-445 AND 50-446 s

REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION (NOV) ITEM A (445/8912-V-01)

REF: TV Electric' letter logged TXX-89209 from W. J. Cahill to USNRC dated April 24, 1989 Gentlemen:

The referenced letter provided our response to Notice of Violation Item A (445-8912-V-01).

In that response we stated that replacement of low strength bolts with high strength bolts in NPSI snubbers would be completed no later than June 15, 1989.

Completion of this work has taken longer than expected.

i We anticipate that bolt replacement for the snubbers will be completed no later than July 31, 1989.

Sincerely, William J. Cahill, Jr.

By:

(. S. Mirshall 1

Generic Licensing Manager J

j BSD/vid I

c Mr. R. D. Martin, Region IV l

Resident Inspectors. CPSES (3) l 8906230121 890615 E