Forwards Status of Implementation of TMI Action Plan Items, Per 890414 Request.Review & Verification Will Continue
ML20245A552
Person / Time
Site: Browns Ferry, Sequoyah, 05000000
Issue date: 04/18/1989
From: Kingsley O
TENNESSEE VALLEY AUTHORITY
To: Murley T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-TM NUDOCS 8904250266
Download: ML20245A552 (22)


Text

-

t 4

q TENNESSEE VALLEY AUTHORITY g

CHATTANOOGA. TENNESSEE 37401

[t 6N 38A Lookout Place APR 181989 Dr. T. E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland ?.0852

Dear Dr. Murley:

STATUS OF IMPLEMENTATION OF THREE MILE ISLAND (THI) ACTION PLAN ITEMS -

SEQUOYAH (SQN) AND BROWNS FERRY (BFN) NUCLEAR PLANTS The enclosed information is provided in response to your letter of April 14, 1989.

The data in the enclosed tables represents our best effort in view of the short turnarotind you requested. Our review and verification will continue; my staff will keep the Office of Special Projects (OSP) informed as our review progresses.

TVA realizes the importance of incorporating the TMI Action Items and getting current on outstanding NRC bulletins and generic letters. These represent a significant portion of the TVA nuclear recovery program.

Shortly after I joined TVA in November 1988, I tasked my Nuclear Manager's Review Group to perform a detailed review of the NUREG-0737 THI Action Plan at BFN. On March 15, 1989, Dr. C. H. Fox of my staff discussed our plans for effecting closure of Safety Issues Management System (SIMS) open items with Dr. B. D. Liaw of OSP.

TVA will continue to focus attention on this important subject as a major element of the TVA recovery program.

The data in the enclosed tables covers both SQN units and all three BFN units.

The table below summarizes the status of the three schedule-driven units relative to the TMI action items.

SQN Units 1 and 2 (Each Unit)

BFN Unit 2 Total Complete 107 75 Additional Items Closed but No Change Needed 13 17 Additional Items to be Completed by Restart 9

Total Resolved 120 101 1

Total Applicable 132 109 l

Ob I t g42gggg ggg g,

An Equal opportunity Employer

____._._____Q

1 f

4

  • Dr. T. E. Murley APR 181989 At SQN, five items for each unit are open pending approval of two technical specification changes.

Six items for each unit are being held open pending completion of Regulatory Guide 1.97 upgrade of accident monitoring instrumentation planned for unit 1 cycle 4/ unit 2 cycle 4 (both are scheduled to occur in 1990). One item per unit is open pending implementation of the control room design review modification scheduled through the cycle 6 refueling outages for each unit.

- At BFN, all open items are being reviewed in terms of their current completion schedules, and we will apprise you of any changes when our review is complete.

I would like to point out that the time provided to fulfill this request has been short and that significant personnel burden has been involved.

Moreover, the attached notations regarding status of individual items are necessarily brief and cannot address all of the details of the more complex issues.

Taking these constraints into account, I certify that to the best of my knowledge the attached information is correct.

Very trul yours, TENN VALLEY AUTHORITY

. D.

'i ng s1 Senior Vice Pr in, Nuclear Po j

Enclosures cc (Enclosures):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Ms. L. J. Watson, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region Il 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

SEQUOYAH UNIT 1 TMI ITEM STATUS COMMENTS (1)

I.A.I.l.1 Complete i

I.A.l.l.2 Complete I.A.1.1.3 Complete I.A.1.1.4 Complete I.A.1.2 Complete I.A.1.3.1 Complete I.A.l.3.2 Complete I.A.2.1.1 Complete I.A.2.1.2 Complete I.A.2.1.3 Complete I.A.2.1.4 Complete I.A.2.1.5 Complete I.A.2.3 Complete I.A.3.1.1 Complete 4

I. A. 3.1.2 Complete I. A. 3.1. 3. A Complete I.A.3.1.3.8 Complete I.B.1.2 Complete I.C.1.1 Complete I.C.1.2.A Complete I.C.1.2.B Complete I.C.1.3.A Complete I.C.I.3.8 Complete I.C.2 Complete I.C.3 Complete I.C.4 Complete I.C.5 Complete I.C.6 Complete I.C.7.1 Complete I.C.7.2 Complete I.C.8 Complete I.D.1 N/A Entered separately for MPA-F008 and MPA-F071 I.D.2.1 Complete I.D.2.2 Complete I.D.2.3 Complete I.G.I.1 Complete j

.I.G.I.2 Complete I.G.I.3 Complete II.B.1.1 Complete II.B.I.2 Complete II.B.I.3 Open (12/89)

Technical Specifications (TS 52) i II.B.2.1 Complete j

II.B.2.2 Complete i

II.B.2.3 Complete I

l l

i

-1'-

f SEQUOYAH UNIT 1 TMI ITEM STATUS COMMENTS (1)

II.B.2.4 Complete II.B.3.1 Complete II.B.3.2 Complete II.B.3.3 Complete II.B.3.4-Complete II.B.4.1 Complete II.B.4.2.A Complete II.B.4.2.B Complete II.D.I.1 Complete

'II.D.I.2.A Complete II.D.1.2.B Complete II.D.1.3 Complete II.D.3.1 Complete II.D.3.2 Complete II.E.1.1.1 Complete II.E.1.1.2 Complete II.E.1.1.3 Complete II.E.1.2.1.A Complete II,E.1.2.1.B Complete II.E.1.2.2.A Complete II.E.1.2.2.8 Complete II.E.1.2.2.C Complete II.E.3.1.1 Complete II.E.3.1.2 Complete II.E.4.1.1 Complete II.E.4.1.2 No Change Recombiners inside containment II.E.4.1.3 No Change Recombiners inside containment II.E.4.2.1-4 Complete II.E.4.2.5.A Complete II.E.4.2c5.B Complete II.E.4.2.6 Complete II.E.4.2.7 Complete II.E.4.2.8 Complete II.F.1.1 Open (12/89)

Technical Specifications (TS 87-28)

II.F.1.2.A Open (12/89)

Technical Specifications (TS 87-28)

II.F.1.2.8 Complete II.F.1.2.C Open (10/90)

RG 1.97 Upgrade II.F.1.2.D Open (10/90)

RG 1.97 Upgrade j

II.F.1.2.E Open (10/90)

RG 1.97 Upgrade II.F.1.2.F Open (10/90)

RG 1.97 Upgrade I

II.F.2.1 Complete l

II.F.2.2 Open (10/90)

RG 1.97 Upgrade I

I

I SEQUOYAH UNIT 1 o

TMI' ITEM STATUS.

COMMENTS (1)

II.F.2.3 Complete-II.F.2.4 Open (10/90)

RG 1.97 Upgrade II.G.I.1 Complete.

II.G.1.2 Complete-II. K.1' N/A SQN Unit 1 operating license in 1980 II.K.l.5 Complete II.K. I.10 Complete II.K.1.20

.N/A B&W Plants only I

II. K.1.21 N/A B&W Plants only II.K.I.22 N/A BWR Plants only II.K.I.23 N/A BWR Plants only II.K.2.2 N/A' B&W Plants only II~K.2.8 N/A B&W Plants only II.K.2.9 N/A B&W Plants only II.K.2.10 N/A B&W Plants only II.K.2.11' N/A B&W Plants only II.K.2.13 Complete II.K.2.14 N/A B&W Plants only II.K.2.15 N/A B&W Plants only II.K.2.16 N/A B&W Plants only' II.K.2.17 Complete

' II.K.2.19 Complete II.K.2.20 N/A B&W Plants only II.K.3.1.A No Change NRC'SER dated 3/27/85' II.K.3.1.B.

No Change NRC SER dated 3/27/85 II.K.3.2 Complete II.K.3.3.

Complete II.K.3.5.A No Change WOG analysis snowed no need for II.K.3.5.B No Change modification II.K.3.7-N/A B&W Plants only II.K 3.9 Complete II.K. 3.10 Complete II.K.3.11 N/A' Specified PORVs'not installed at SQN II.K.3.12.A No Change In original design II.K.3.12.B No Change In original design II.K.3.13.A N/A BWR only II.K.3.13.B N/A BWR only II.K.3.14 N/A BWR only II. K. 3.15 N/A BWR only II.K.3.16.A N/A BWR only II.K.3.16.B N/A BWR only II.K.3.17 Complete II.K.3.18.A N/A BWR only II.K.3.18.B N/A BWR only

~

es O

m_______ _. _ _ _ _ _.. _ _ _

i l

1 SEQUOYAH UNIT 1 i

TMI ITEM STATUS COMMENTS (1)

II.K.3.18.C N/A BWR only II.K.3.19 N/A BWR only II.K.3.20 N/A Big Rock Plant only II.K.3.21.A N/A BWR only i

II.K.3.21.B N/A BWR only II.K.3.22.A N/A BWR only II.K.3.22.B N/A BWR only II.K.3.24 N/A BWR only II.K.3.25.A No Change Original design conforms II.K.3.25.B No Change Original design conforms II.K.3.27 N/A BWR only II.K.3.28 N/A BWR only II.K.3.29 N/A BWR only IIiK.3.30.A Complete II.K.3.30.8 Complete II.K.3.30.C No Change Generic WOG analysis bounds II.K.3.31 Complete II.K.3.40 N/A B&W Plants only II.K.3.43 N/A B&W Plants only II.K.3.44 N/A BWR only II.K.3.45 N/A BWR only II.K.3.46 N/A BWR only II.K.3.57 N/A BWR only III.A.1s1 Complete III.A.1.2.1 Complete III.A.I.2.2 Complete III.A.1.2.3 Complete III.A.2.1 Complete III.A.2.2 Complete I11.D.1.1.1 Complete III.D.1.1.2 Complete III.D.3.3.1 Complete III.D.3.3.2 Complete III.D.3.4.1 Complete III.D.3.4.2 No Change Modifications not required III.D.3.4.3 No Change Modifications not required MPA-F008 Complese Summary report issued MPA-F063 Complete MPA-F064 Complete MPA-F065 Complete MPA-F071 Open (10/93)

Modification Implementation MPA-B072 Open (12/89)

Technical Specifications (TS 87-28 and TS 52)

MPA-B083 Open (12/89)

Technical Specifications (TS 87-28 and TS 52) 67.4.1 Complete (1) NOTE: Available completion dates were previously provided by letters to NRC dated August 4, 1987; February 17, 1988; and March 7, 1989.

m SEQUOYAH

. UNIT 2

- THI ITEM STATUS COMMENTS (1)-

' I.A.1.1.1 Complete I.A.l.1.2 Complete I.A.l.1.3 Complete I.A.1.1.4 -

Complete I.A.1.2 Complete I.A.1.3.1 Complete I.A.1.3.2 Complete I.A.2.1.l' Complete I.A.2.1.2 Complete I.A.2.1.3-Complete I.A.2.1.4

' Complete I'.A.2.1.5 Complete I.A.2.3 Complete I. A. 3.1.1 Complete I.A.3.1.2 Complete I.A.3.1.3.A Complete-I.A.3.1.3.8 Complete I.B.I.2 Complete I.C.1.1 Complete I.C.1.2.A Complete-I.C.l.2.8 Complete I.C.l.3.A Complete I.C.I.3.8 Complete I.C.2 Complete I.C.3 Complete I C.4 Complete I.C.5 Complete I.C.6

-Complete I.C.7.1 Complete I.C.7.2 Complete I.C.8 Complete I.D.1 N/A Entered separately for MPA-F008 and MPA-F071 I.D.2.1 Complete I.D.2.2 Complete I.D.2.3 Complete I.G.1.1 Complete I.G.1.2' Complete I.G.1.3 Complete II.B.1.1 Complete II.B.I.2 Complete II.B.1.3 Open (12/89)

Technical Specifications (TS 52)

II.B.2.1 Complete

{

II.B.2.2 Complete II.B.2.3 Complete

{


..---__--___..x---

SEQUOYAH-UNIT 2 TMI ITEM STATUS COMMENTS (1)

II.B.2.4

. Complete II.B.3.1 Complete II B.3.2 Complete II.B.3.3.

Complete II.B.3.4 Complete II.B.4.1 Complete II.B.4.2.A.

Complete' II.B.4.2.8 Complete II.D.1.1 Complete II.D.I.2.A Complete II.D.1.2.B

- Complete II.D.1.3 Complete II.D.3.1 Complete I I'. D. 3. 2 Complete II. E.1.1.1 Complete II. E.1.1.2 Complete II. E.1.1. 3 Complete II. E.1.2.1. A Complete I I. E.1. 2.1. B Complete II.E.1.2.2.A-Complete II.E.1.2.2.B-Complete II. E.1. 2. 2.C Complete II. E. 3.1.1 Complete I I. E. 3.1. 2 Complete II.E.4.1.1 Complete II. E.4.1. 2 No Change Recombiners inside containment II.E.4.1.3 No Change Recombiners inside containment II.E.4.2.1-4 Complete II.E.4.2.5.A Complete II.E.4.2!5.B Complete II.E.4.2.6 Complete II.E.4.2.7 Complete II.E.4.2.8 Complete II.F.1.1.

Open (12/89)

Technical-Specifications (TS 87-28)

II.F.1.2.A Open (12/89)

Technical Specifications (TS 87-28)

II.F.1.2.8-Complete II.F.1.2.C Open (10/90)

RG 1.97 Upgrade

-II.F.1.2.0-Open (10/90)

RG 1.97 Upgrade II. F.1. 2. E Open (10/90)

RG 1.97 Upgrade II.F.1.2.F Open (10/90)

RG 1.97 Upgrade-II.F.2.1 Complete II.F.2.2 Open (10/90)

RG 1.97 Upgrade

+

m_m__._._.___._._._____m.____._.__._

SEQUOYAH UNIT 2 TMI ITEM STATUS COMMENTS (1)

II.F.2.3 Complete II.F.2.4.

Open (10/90)

RG 1.97 Upgrade II.G.l.1 Complete II.G.l.2 Complete II. K.' 1 N/A SQN Unit 2 operating license in 1981 II.K.l.5 Complete II.K.1.10 Complete II.K.1.20 N/A B&W Plants only II.K.1.21 N/A B&W Plants only II.K.l.22 N/A BWR Plants only

'II.K.1.23 N/A BWR Plants only

.II. K. 2. 2 N/A B&W Plants only II.K.2.8 N/A B&W Plants only-II.K.2.9 N/A B&W Plants only II.K.2.10 N/A B&W flants only II.K.2.ll N/A B&W Plants only II.K.2.13 Complete II.K.2.14 N/A B&W Plants only II.K.2.15 N/A B&W Plants only II.K.2.16 N/A B&W Plants only II.K.2.17 Complete II.K.2.19 Complete l

II.K.2.20 N/A B&W Plants only II. K.~ 3.1. A.

No Change NRC SER dated 3/27/85 II.K.3.1.8 No Change NRC SER dated 3/27/85 II.K.3.2 Complete-II.K.3.3 Complete II.K.3.5.A.

No Change WOG analysis showed no need for II.K 3.5.B-No Change modification II.K.3.7-N/A B&W Plants only II.K.3.9 Complete II.K.3.10 Complete II.K.3.11 N/A Specified PORVs not installed at SQN II.K.3.12.A No Change In original design II.K.3.12.8 No Change In original design II.K.3.13.r.

N/A BWR only

.II.K.3.13.B N/A BWR only

.II.K.3.14 N/A BWR only II.K.3.15 N/A BWR only II.K.3.16.A N/A BWR only II. K. 3.16. 8 N/A BWR only II.K.3.17 Complete II.K.3.18.A N/A BWR only II.K.3.18.B N/A BWR only

~

SEQUOYAH UNIT 2 i

TMI ITEM STATUS COMMENTS (1)

II.K.3.18.C N/A BWR only II.K.3.19 N/A BWR only II.K.3.20 N/A Big Rock Plant only II.K.3.21.A N/A BWR only II.K.3.21.8 N/A BHR only II.K.3.22.A N/A BWR only II.K.3.22.B N/A BWR only

-II.K.3.24 N/A BNR only II.K.3.25.A No Change Original design conforms II.K.3.25.8 No Change Original design conforms

.II.K.3.27 N/A BWR only II.K.3.28 N/A BWR only II.K.3.29 N/A BWR only II.K.3.30.A Complete II.K.3.30.8 Complete II.K.3.30.C No Change Generic H0G analysis bounds l

II.K.3.31 Complete II.K.3.40 N/A B&W Plants only II.K.3.43 N/A B&W Plants only II.K.3.44 N/A BHR only II.K.3.45 N/A BHR only II.K.3.46 N/A BWR only II.K.3.57 N/A BWR only III.A.l.1 Complete III.A.l.2.1 Complete III.A.l.2.2 Complete III.A.I.2.3 Complete III.A.2.1 Complete III.A.2.2 Complete III.D.I.l.1 Complete III.D.I.l.2 Complete III.D.3.3.1 Complete III.D.3.3.2 Complete III.D.3.4.1 Complete III.D.3.4.2 No Change Modifications not required III.D.3.4.3 No Change Modifications not required MPA-F008 Complete Summary report issued MPA-F063 Complete MPA-F064 Complete MPA-F065 Complete MPA-F071 Open (10/93)

Modification Implementation MPA-B072 Open (12/89)

Technical Specifications (TS 87-28 and TS 52)

MPA-B083 Open (12/89)

Technical Specifications (TS 87-28 and

~

  • TS 52) 67.4.1 Complete (1) NOTE: Available completion dates were previously provided by letters to NRC dated August 4, 1987; February 17, 1988; and March 7, 1989.

s Page 1 BROWNS FERRY UNIT 1*

TMI ITEM STATUS COMMENTS i

I.A.I.l.1 Complete NRC Letter dated 01/15/82 l

I.A.l.l.2 Complete NRC Letter dated 01/15/82 I.A.1.1.3 Complete NRC Letter dated 01/15/82 I.A.I.1.4 Complete NRC Letter dated 01/15/82 I.A.l.2 Complete PMI 12.12 I.A.l.3.1 Complete NRC Letter dated 02/26/86 I.A.l.3.2 Complete TS Chapter 6 I.A.2.1.1 N/C TVA Letter dated 12/23/80 I.A.2.1.2 N/C TVA Letter dated 12/23/80 I.A.2.1.3 N/C TVA Letter dated 12/23/80 I.A.2.1.4 Complete TVA Letter dated 12/23/80 I.A.2.1.5 N/C TVA Letter dated 12/23/80 I.A.2.3 N/C TVA Letter dated 12/23/80 I.A.3.1.1 Complete PMP 0202.05 I.A.3.1.2 Complete PMP 0202.05 I.A.3.1.3.A Complete PMP 0202.05 1.A.3.1.3.B N/A BFN has a simulator I.B.l.2 N/A NTOL only I.C.l.1 Complete TVA Letter dated 12/23/80 I.C.I.2.A Complete E0Is I.C.1.2.8 Open Restart-Additional directives needed I.C.1.3.A Complete TVA Letter dated 07/20/88 I.C.I.3.B Open Restart-Upgrade to BWROG EPG Rev 3 I.C.2 Complete PMI 12.12 I.C.3 Complete PMI 12.12 I.C.4 Complete PMI 12.12 I.C.5 Complete NRC Letter dated 12/08/81 I.C.6 Complete TVA Letter dated 04/13/82 I.C.7.1 N/A NTOL only I.C.7.2 -

N/A NT0L only I.C.8 N/A NT0L only I.D.1 Open Refuel Cycle 8-Design I.D.2.1 Open Restart-Design I.D.2.2 Open Restart-Hardware I.D.2.3 Open Restart-Design I.G.l.1 N/A NTOL only I.G.l.2 N/A NTOL only I.G.I.3 N/A NTOL only II.B.l.1 Complete NRC Letter dated 08/02/82 II.B.l.2 Complete NRC Letter dated 08/02/82 II.B.l.3 Complete NRC Letter dated 08/02/82 II.B.2.1 Complete Reevaluation under E0I inspection II.B.2.2 Complete Reevaluation under E0I inspection II.B.2.3 Complete Reevaluation under E0I inspection O

l

l Page 2 BROWNS TERM UNIT 1 TMI ITEM STATUS COMMENTS II.B.2.4 N/A NTOL only II.B.3.1 Complete NRC Letter dated 03/24/87 II.B.3.2 Open Restart-Modification II.B.3.3 N/A NT0L only II.B.3.4 N/A NTOL only II.B.4.1 Complete NRC Letter dated iO/12/83 II.B.4.2.A Complete NRC Letter dated 10/12/83 II.B.4.2.8 Complete NRC Letter dated 10/12/83 II.D.1.1 Complete NRC Letter dated 09/01/83 i

II.D.1.2.A Complete NRC Letter dated 09/01/83 l

II. D.1. 2.' B Complete NRC Letter dated 09/01/83 II.D.1.3 Complete NRC Letter dated 09/01/83 II.D.3.1 Complete NRC Letter dated 12 M3/80 II.D.3.2 Complete TS 4.6,0.2 II.E.1.1.1 N/A PWR only II.E.1.1.2 N/A PWR only II.E.1.1.3 N/A PWR only II. E.1.2.1. A N/A PWR only II. E.1. 2.1. 8 N/A PWR only II. E.1.2. 2. A N/A PWR only II.E.1.2.2.B N/A PWR only

.II.E.1.2.2.C N/A PWR only II.E.3.1.1 N/A PWR only II. E. 3.1. 2 N/A PWR only II.E.4.1.1 Complete NRC Letter dated 05/23/88 II.E.4.1.2 Complete NRC Letter dated 05/23/88 II.E.4.1.3 Cot lete NRC Letter dated 05/23/88 II.E.4.2.1-4 Complete TVA Letter dated 12/23/80 II. E. 4. 2.~ 5. A Complete NRC Letter dated 03/25/83 II.E.4.2.5.8 Complete NRC Letter dated 03/25/83 II.E.4.2.6 Complete NRC Letter dated 07/01/85 II.E.4.2.7 Complete NRC Letter dated 07/01/85 II.E.4.2.8 Complete TS Table 3.7.A to be updated II.F.1.1 Open Restart-Modifications II.F.1.2 Open Restart-Modifications II.F.1.3 Open Restart-Modifications II.F.1.4 Open Restart-Modifications II.F.1.5 Complete CCTS Closure II.F.1.6 Open Restart-Modifications II.F.2.1 N/A PWR only II.F.2.2 N/A PWR only II.F.2.3 Open Restart-Modifications i

II.F.2.4 N/A NTOL only i

II.G.I.1 N/A PWR only I

i J

3 4

Page 3 BROWNS FERRY UNIT 1 TMI ITEM STATUS COMMENTS II.G.I.2 N/A PWR only II.K.1 Complete IEB 79-08-Various letters;-05,-06-N/A

- II.K.1.5.

N/A NT0L only II.K.l.10 N/A NTOL only II.K.l.20 N/A NT0L only II.K.1.21 N/A NT0L only V

II.K.1.22 N/A NT0L.only II.K.1.23 N/A NTOL only II.K.2.2 N/A B&W Plants only II.K.2.8 N/A B&W Plants only II.K.2.9 N/A B&W Plants only II.K.2.10 N/A B&W Plants only II.K.2.11 N/A B&W Plants only II.K.2.13 N/A B&W Plants only II.K.2.14-N/A B&W Plants only II.K.2.15 N/A B&W Plants only II.K.2.16 N/A B&W Plants only II.K.2.17 N/A B&W, CE, and HEST Plants Only II.K.2.19 N/A B&W Plants only II.K.2.20 N/A B&W Plants only II.K.3.1.A N/A PWR only II.K.3.1.B N/A PWR only II.K.3.2 N/A PWR only II.K.3.3-Complete NRC Letter dated 05/30/84 II.K.3.5.A N/A PWR only II.K.3.5.8 N/A PWR only II.K.3.7 N/A B&W Plants only II.K.3.9 N/A WEST Plants only II.K.3.10 N/A WEST Plants only II.K.3.11 N/A PORV not at BFN II.K.3.12.A N/A WEST Plants only II.K.3.12.8 N/A WEST Plants only II.K.3.13.A Complete NRC Letter dated 09/19/83 II.K.3.13.8 Open Restart-Modifications II.K.3.14 N/A Isolation Condensers not at BFN II.K.3.15 Complete NRC Letter dated 12/12/83 II.K.3.16.A Complete NRC Letter dated 11/13/84 II.K.3.16.8 Complete Modification Completed 03/16/85 II.K.3.17 Complete NRC Letter dated 08/24/83 II.K.3.18.A Complete TVA Letter dated 03/05/87 II.K.3.18.B Complete TVA Letter dated 03/05/87 II.K.3.18.C Open Restart-Modifications II.K.3.19 N/A BFN has jet pumps II.K.3.20 N/A Big Rock Plant only

~ _ - - - - - - - - -. - - - -. _ - -. _ _.. _

O Page 4

)

)

BROWNS FERRY UNIT 1 1

TMI ITEM STATUS COMMENTS II.K.3.21.A N/C NRC Letter dated 10/26/82 II.K.3.21.8 N/C NRC Letter dated 10/26/82 II.K.3.22.A-N/C NRC Letter dated 07/27/84 II.K.3.22.8 N/C NRC Letter dated 07/27/84 II.K.3.24 Complete NRC Letter dated 11/10/82 II.K.3.25.A N/C NRC Letter dated 01/25/83 II.K.3.25.B N/C-NRC Letter dated 01/25/83 II.K.3.27 Open Restart-Modifications II.K.3.28 Open Refuel Cycle 6-Modifications l

II.K.3.29 N/A Isolation. Condensers not at BFN II.K.3.30.A N/C NRC Letter dated 12/28/83 II.K.3.30.8 N/C NRC Letter dated 12/28/83 II.K.3.30.C N/C.

NRC Letter dated 12/28/83 II.K.3.31 N/C NRC Letter dated ~12/28/83 II.K.3.40 N/A B&W Plants only II.K.3.43 N/A B&W Plants only II.K.3.44 N/C NRC Letter dated 12/29/81 II.K.3.45 N/C NRC Letter dated 07/29/83 II.K.3.46 Complete NRC Letter dated 10/31/80 II.K.3.57 Complete TVA Letter dated 12/23/80 III.A.l.1 Complete NRC Letter dated 10/31/80 III.A.1.2.1 Complete NRC Letter dated 10/31/80 III.A.l.2.2 Complete Lack SPDS only III.A.l.2.3 Complete Lack SPDS only III.A.2.1 Complete NRC Letter dated 11/01/88 III.A.2.2 Complete NRC Letter dated 05/04/87 III.D.1.1.1 Complete NRC Letter dated 10/31/80 III.D.1.1.2 Complete TVA Letter dated 12/23/80 III.D.3.3.1 Complete NRC Letter dated 02/22/82 III.D.3.3.2 Complete NRC Letter dated 02/22/82 III.D.3.4.1 Complete NRC Letter dated 08/30/82 III.D.3.4.2 N/A Modifications not required III.D.3.4.3 N/A Modifications not required MPA-F008 Complete TVA Letter dated 12/30/86 MPA-F063 Complete Lack SPDS only MPA-F064 Complete NRC Letter dated 05/04/87 HPA-F065 Complete NRC Letter dated 05/04/87 MPA-F071 Open Refuel Cycle 8-Design MPA-B072 Complete Lack II.K.3.27 only MPA-B083 Complete Lack PASS only 67.4.1 N/A PWR only Currently in refuel cycle 6, next outage will be refuel cycle 7.

.o e

__-_._mo-_. _ _.. -_ _ _ - _ _ _

1..

l Page 5 L

BROWNS FERRY UNIT 2**

l TMI ITEM STATUS COMMENTS I. A. l. l.' l Complete NRC Letter dated 01/15/82 I.A.l.1.2 Complete NRC Letter dated 01/15/82 I.A.I.l.3 Complete NRC Letter dated 01/15/82 I.A.1.1.4 Complete NRC Letter dated 01/15/82 I.A.I.2 Complete PMP 12.12 I.A.1.3.1 Complete NRC Letter _ dated 02/26/86 I.A.l.3.2 Complete TS Chapter 6 l

I.A.2.1.1 N/C TVA Letter dated 12/23/80-I.A.2.1.2 N/C TVA Letter dated 12/23/80 I.A.2.1.3 N/C TVA Letter dated 12/23/80 I.A.2.1.4 Complete TVA Letter dated 12/23/80 l

I.A.2.1.5 N/C TVA Letter dated 12/23/80 I.A.2.3 N/C TVA Letter dated 12/23/80 I.A.3.121 Complete PMP 0202.05 I.A.3.1.2 Complete PHP 0202.05 I.A.3.1.3.A Complete PHP 0202.05 1.A.3.1.3.B N/A BFN has a simulator I.B.l.2 N/A NTOL only I.C.1.1 Complete TVA Letter dated'12/23/80 I.C.l.2.A Complete E0Is I.C.1.2.B Open Restart-Additional directives needed I.C.l.3.A Complete TVA Letter dated 07/20/88 I.C.I.3.B Open Restart-Upgrade to BHROG EPG Rev 3 I.C.2 Complete PMI 12.12 l

I.C.3 Complete PMI 12.12 I.C.4 Complete PMI 12.12 I.C.5 Complete NRC Letter dated 12/08/81 I.C.6 Complete TVA Letter dated 04/13/82 I.C.7.1 -

N/A NT0L only I.C.7.2 N/A NTOL only I.C.8 N/A NTOL only I.D.1 Open Refuel Cycle 7-Design I.D.2.1 Open Refuel Cycle 6-Design I.D.2.2 Open Refuel Cycle 6-Hardware 3

I.D.2.3 Open Refuel Cycle 6-Hardware 4

I.G.1.1 N/A NT0L only

]

I.G.1.2 N/A NTOL only I.G.I.3 N/A NT0L only II.B.l.1 Complete NRC Letter dated 08/02/82 II.B.1.2 Complete NRC Letter dated 08/02/82 II.B.1.3 Complete NRC Letter dated 08/02/82 1

II.B.2.1 Complete Reevaluation under E0I inspection

.~

II.B.2.2 Complete Reevaluation under E0I inspection II.B.2.3 Complete Reevaluation under E01 inspection

e O

Page 6 BROWNS FERRI UNIT 2 THI ITEM STATUS COMMENTS II.B.2.4 N/A NTOL only II.B.3.1 Complete NRC Letter dated 03/24/87 II.B.3.2 Open Refuel Cycle 6-Modifications II.B.3.3 N/A NTOL only II.B.3.4 N/A NTOL only II. B. 4.1 Complete NRC Letter dated 10/12/83 II.B.4.2.A Complete NRC Letter dated 10/12/83 II.B.4.2.B Complete -

NRC Letter dated 10/12/83 II.D.1.1 Coniplete NRC Letter dated 09/01/83 II.D.1.2.A Complete _

NRC Letter dated 09/01/83 II.D.1.2.B Complete NRC Letter dated 09/01/83 II.D.1.3 Complete NRC Letter dated 09/01/83 II.D.3.1 Complete NRC Letter dated 12/23/80 II.D.3.2 Complete TS 4.6.0.2 II.E.1.1.1 N/A PWR only II.E.1.1.2 N/A PWR only II.E.1.1.3 N/A PWR only II. E.1.2.1. A N/A PWR only II.E.1.2.1.8 N/A PWR only II.E.1.2.2.A N/A PWR only II. E.1. 2. 2. B N/A PWR only II.E.1.2.2.C N/A PWR only

)

II. E. 3.1.1 N/A PWR only

_l II. E. 3.1. 2 N/A PWR only II.E.4.1.1 Complete NRC Letter dated 05/23/88 II.E.4.1.2 Complete NRC Letter dated 05/23/88 II.E.4.1.3 Complete NRC Letter dated 05/23/88 l

II.E.4.2.1-4 Complete TVA Letter dated 12/23/80 l

II.E.4.2;5.A Complete NRC Letter dated 03/25/83 l

II.E.4.2.5.B Complete NRC Letter dated 03/25/83

)

II.E.4.2.6 Complete NRC Letter dated 07/01/85 II.E.4.2.7 Complete NRC Letter dated 07/01/85 II.E.4.2.8 Complete TS Table 3.7.A to be updated II.F.1.1 Open Restart-Modifications II.F.1.2 Open Restart-Modifications II.F.1.3 Open Restart-Modifications II.F.1.4 Open Restart-Modifications II.F.1.5 Complete CCTS Closure II.F.1.6 Open Restart-Modifications II.F.2.1 N/A PWR only II.F.2.2 N/A PWR only II.F.2.3 Complete CCTS Closure II.F.2.4 N/A NT0L only II.G.I.1 N/A PWR only l

w____-_____

Page 7 BROWNS FERRY LNIT 2 TMI ITEM STATUS COMMENTS II.G.1.2 N/A PWR only II.K.1 Complete IEB 79-08-Various letters;-05,-06-N/A II.K.1.5 N/A NTOL only II.K.l.10 N/A NTOL only II.K.l.20 N/A NTOL only II.K.i.21 N/A NT0L only II.K.1.22 N/A NTOL only II.K.I.23 N/A NTOL only II.K.2.2 N/A B&W Plants only II.K.2.8 N/A B&W Plants only II.K.2.9 N/A B&W Plants only II.K.2.10 N/A B&W Plants only II.K.2.11 N/A B&W Plants only II.K.2.13 N/A B&W Plants only II.K.2.14 N/A B&W Plants only II.K.2.15 N/A B&W Plants only II.K.2.16 N/A B&W Plants only II.K.2.17 N/A B&W, CE, and WEST Plants only II.K.2.19 N/A B&W Plants only II.K.2.20 N/A B&W Plants only II.K.3.1.A N/A PWR only II.K.3.1.B N/A PWR only II.K.3.2 N/A PWR only II.K.3.3 Complete NRC Letter dated 05/30/84 II.K.3.5.A N/A PWR only II.K.3.5.8 N/A PWR only II.K.3.7 N/A B&W Plants only II.K.3.9 N/A WEST Plants only II.K.3.10 N/A WEST Plants only II.K.3.11 N/A PORV not at BFN II.K.3.12.A N/A WEST Plants only II.K.3.12.B N/A WEST Plants only II.K.3.13.A Complete NRC Letter dated 09/19/83 II.K.3.13.B Open Restart-Modifications II.K.3.14 N/A Isolation Condensers not at BFN II.K.3.15 Complete NRC Letter dated 12/12/83 II.K.3.16.A Complete NRC Letter dated 11/13/84 l

II.K.3.16.8 Complete Modification Completed-03/16/85 II.K.3.17 Complete NRC Letter dated 08/24/83 II.K.3.18.A Complete TVA Letter dated 03/05/87 II.K.3.18.B Complete TVA Letter dated 03/05/87 II.K.3.18.C Open Restart-Modifications II.K.3.19 N/A BFN has jet pumps 1

II.K.3.20 N/A Big Rock Plant only l

E.

Page 8

]

BROWNS FERRY UNIT 2 TMI ITEM STATUS COMMENTS II.K.3.21.A N/C NRC Letter dated 10/26/82 II.K.3.21.B N/C NRC Letter dated 10/26/82 l

II.K.3.22.A N/C NRC Letter dated 07/27/84 l

II.K.3.22.B N/C NRC Letter dated 07/27/84 II.K.3.24 Complete NRC Letter dated 11/10/82 II.K.3.25.A N/C NRC Letter dated 01/25/83

. II.K. 3 ' 25'.B N/C NRC Letter dated 01/25/83

' II. K. 3. 2 7-Open Refuel Cycle 6-Modifications II.K.3.28 Open Refuel Cycle 6-Modifications II.K.3.29 N/A Isolation Condensers not at BFN i

II.K.3.30.A N/C NRC Letter dated 12/28/83.

II.K.3.30.B N/C NRC Letter dated 12/28/83 II.K.3.30.C N/C NRC Letter dated 12/28/83 II.K.3.31 N/C NRC Letter dated 12/28/83 II.K.3.40 N/A B&W Plants only II.K.3.43 N/A B&W Plants only II.K.3.44 N/C NRC Letter dated 12/29/81 II.K.3.45 N/C NRC Letter dated 07/29/83 II.K.3.46 Complete NRC Letter dated-10/31/80 II.K.3.57

~ Complete TVA Letter dated 12/23/80 III.A.I.1 Complete NRC Letter dated 10/31/80 III.A'1.2.1

. Complete NRC Letter dated 10/31/80 III.A.1.2.2 Complete Lack SPDS only III.A.1.2.3 Complete Lack SPDS only III.A.2.1 Complete NRC Letter dated 11/01/88 III.A.2.2

. Complete NRC Letter dated 05/04/87 III.D.1.1.1 Complete NRC Letter dated _10/31/80 III.D.I.1.2 Complete TVA Letter dated 12/23/80 III.D.3.3.1 Complete NRC Letter dated 02/22/82 III.D.3.3.2 Complete NRC Letter dated 02/22/82 III.D.3.4.1 Complete NRC Letter dated 08/30/82 III.D.3.4.2 N/A Modifications not required III.D.3.4.3 N/A Modifications not required MPA-F008 Complete TVA Letter dated 12/30/86 MPA-F063 Complete Lack SPDS only MPA-F064 Complete NRC Letter dated 05/04/87 MPA-F065 Complete NRC Letter dated 05/04/87 MPA-F071 Open Refuel Cycle 8-Design MPA-B072 Complete Lack II.K.3.27 only MPA-B083 Complete Lack PASS only 67.4.1 N/A PWR only Currently in refuel cycle 5, next outage will be refuel cycle 6.

.g

Page 9 BROWNS FERRY UNIT 3***

TMI ITEM STATUS COMMENTS I.A.l.1.1 Complete NRC Letter dated 01/15/82 I.A.1.1.2 Complete NRC Letter dated 01/15/82 I.A.1.1.3 Complete NRC Letter dated 01/15/82 I.A.l.1.4 Complete NRC Letter dated 01/15/82 I.A.1.2 Complete PMI 12.12 I.A.1.3.1 Complete NRC Letter dated 02/26/86 I.A.1.3.2 Complete TS Chapter 6 I.A.2.1.1 N/C TVA Letter dated 12/23/80 I.A.2.1.2 N/C TVA Letter dated 12/23/80 I.A.2.1.3 N/C TVA Letter dated 12/23/80 i

I.A.2.1.4 Complete TVA Letter dated 12/23/80 I.A.2.1.5 N/C TVA Letter dated 12/23/80 I.A.2.3 N/C TVA Letter dated 12/23/80 I.A.3.1.1 Complete PMP 0202.05 I.A.3.1.2 Complete PMP 0202.05 I.A.3.1.3.A Complete PMP 0202.05 I.A.3.1.3.B N/A BFN has a simulator I.B.l.2 N/A NT0L only I.C.1.1 Complete TVA Letter dated 12/23/80 I.C.1.2.A Complete E0Is I.C.I.2.B Open Restart-Additional directives needed I.C.1.3.A Complete TVA Letter dated 07/20/88 I.C.I.3.B Open Restart-Upgrade to BHROG EPG Rev 3 I.C.2 Complete PMP 12.12 I.C.3 Complete PMP 12.12 I.C.4 Complete PHP 12.12 I.C.5 Complete NRC Letter dated 12/08/81 I.C.6 Complete TVA Letter dated 04/13/82 I.C.7.1 -

N/A NTOL only I.C.7.2 N/A NT0L only I.C.8 N/A NT0L only I.D.1 Open Refuel Cycle 6-Design I.D.2.1 Open Restart-Design I.D.2.2 Open Restart-Hardware I.D.2.3 Open Restart-Design I.G.1.1 N/A NTOL only I.G.l.2 N/A NTOL only I.G.1.3 N/A NTOL only II.B.1.1 Complete NRC Letter dated 08/02/82 II.B.1.2 Complete NRC Letter dated 08/02/82 II.B.1.3 Complete NRC Letter dated 08/02/82 i

II.B.2.1 Complete Reevaluating under E01 inspection II.B.2.2 Complete Reevaluating under E0I inspection II.B.2.3 Complete Reevaluating under E01 inspection

,,-------------,--------,,----_--,,-,-,--m 4

3 Page 10 BROWNS FERRY-UNIT 3 TMI ITEM STATUS COMMENTS II.B.2.4 N/A NTOL only L

II.B.3.1 Complete NRC Letter dated 03/24/87 J

II.B.3.2 Open Restart-Modification II.B.3.3 N/A NTOL only II.B.3.4 N/A NT0L only II.B.4.1 Complete NRC Letter. dated 10/12/83 J

II.B.4.2 A Complete NRC Letter dated 10/12/83 i

II.B.4.2.B Complete.

NRC Letter dated 10/12/83 II.D.1.1 Complete NRC Letter dated 09/01/83

'II.D.1.2.A Complete-NRC Letter dated 09/01/83 II.D.l.2.8 Complete NRC Letter dated 09/01/83' II.D.1.3 Complete NRC Letter dated 09/01/83 II.D.3.1 Complete NRC Letter dated 12/23/80 II.D.3.2 Complete TS 4.6.D.2 i

II.E.1.1.1 N/A PWR only II.E.1.1.2 N/A PWR only II.E.1.1.3 N/A PWR only II.E.1.2.1.A N/A PWR only

{

II.E.1.2.1.B N/A PWR only II.E.1.2.2.A N/A PWR only II.E.1.2.2.B N/A PWR only II.E.1.2.2.C N/A PWR only II.E.3.1.1 N/A PWR only II.E.3.1.2 N/A PWR only II.E.4.1.1 Complete NRC Letter dated 05/23/88 II.E.4.1.2 Complete NRC Letter dated 05/23/88 II.E.4.1.3 Complete NRC Letter dated 05/23/88

)

II.E.4.2.1-4 Complete TVA Letter dated 12/23/80 j

II.E.4.2:5.A Complete NRC Letter dated 03/25/83 l

II.E.4.2.5.B Complete NRC Letter dated 03/25/83 i

II.E.4.2.6 Complete NRC Letter dated 07/01/85 II.E.4.2.7 Complete NRC Letter dated 07/01/85 II.E.4.2.8 Complete TS Table 3.7.A to be updated II.F.1.1 Open Restart-Modifications II.F.1.2 Open Restart-Modifications II.F.1.3 Open Restart-Modifications II.F.1.4 Open Restart-Modifications II.F.1.5 Complete CCTS Closure II.F.1.6 Open Restart-Modifications II.F.2.1 N/A PWR only II.F.2.2 N/A PWR only II.F.2.3 Open Restart-Modifications II.F.2.4 N/A NT0L only II.G.1.1 N/A PWR only

b t

Page 11 BROWNS FERRY UNIT 3 TM1 ITEM STATUS COMMENTS II.G.I.2 N/A PWR only II.K.1 Complete IEB 79-08-Various letters;-05,-06-N/A II.K.I.5 N/A NTOL only II.K.I.10 N/A NTOL only II.K.l.20 N/A NTOL only II.K.1.21 N/A NTOL only II.K.1.22 N/A NT0L only-II.K.1.23 N/A NTOL only.-

II.K.2.2 N/A B&W Plants only II.K.2.8 N/A B&W Plants only II.K.2.9 N/A

.B&W Plants only II.K.2.10 N/A B&W Plants only II.K.2.ll N/A B&W Plants only II.K.2.13 N/A B&W Plants only II.K.2.14 N/A B&W Plants only II.K.2.15 N/A B&W Plants only II.K.2.16 N/A B&W Plants only II.K.2.17 N/A B&W, CE, and. WEST Plants only II.K.2.19 N/A B&W Plants only II.K.2.20 N/A B&W Plants only II.K.3.1.A N/A PWR only II.K.3.1.8 N/A PWR only II.K.3.2 N/A PWR only II.K.3.3 Complete

.NRC Letter dated 05/30/84 II.K.3.5.A N/A PWR only II.K.3.5.B N/A PWR only II.K.3.7 N/A B&W Plants only II.K.3.9 N/A WEST Plants only I I -. K. 3.10 N/A HEST Plants only II.K.3.11 N/A PORV not at BFN II.K.3.12.A N/A WEST Plants only II.K.3.12.8 N/A HEST Plants only II.K.3.13.A Complete NRC ).etter dated 09/19/83 II.K.3.13.8 Open Restart-Modifications II.K.3.14 N/A Isolation Condensers not at BFN II.K.3.15 Complete NRC Letter dated 12/12/83 II.K.3.16.A Complete NRC Letter dated 11/13/84 II.K.3.16.8 Complete Modification. Completed-03/16/85 II.K.3.17 Complete NRC Letter dated 08/24/83 II.K.3.18.A Complete TVA Letter dated 03/05/87 II.K.3.18.8 Complete TVA Letter dated 03/05/87 II.K.3.18.C Open Restart-Modifications II.K.3.19 N/A BFN has jet pumps

~

II.K.3.20 N/A Big Rock Plant only

l

<.* a O

Page 12 BROWNS FERRY UNIT 3 TMI ITEM STATUS COMMENTS II.K.3.21.A N/C NRC Letter dated 10/26/82 II.K.3.21.B N/C NRC Letter dated 10/26/82 II.K.3.22.A N/C NRC Letter dated 07/27/84 II.K.3.22.B N/C NRC Letter dated 07/27/84 II.K.3.24 Complete NRC Letter dated 11/10/82 II.K.3.25.A N/C NRC Letter dated 01/25/83 II.K.3.25.B N/C NRC Letter dated 01/25/83 II.K.3.27 Open Restart-Modifications II.K.3.28 Open Refuel Cycle 6-Modifications II.K.3.29 N/A Isolation Condensers not at BFN II.K.3.30.A N/C NRC Letter dated 12/28/83 II.K.3.30.8 N/C NRC Letter dated 12/28/83 II.K.3.30.C N/C NRC Letter dated 12/28/83 II.K.3.31 N/C NRC Letter dated 12/28/83 II.K.3.40 N/A B&W Plants only II.K.3.43 N/A B&W Plants only II.K.3.44 N/C NRC Letter dated 12/29/81 II.K.3.45 N/C NRC Letter dated 07/29/83 II.K.3.46 Complete NRC Letter dated'10/31/80 II.K.3.57 Complete TVA Letter dated 12/23/80

{

III.A.l.1 Complete NRC Letter dated 10/31/80 III.A.l.2.1 Complete NRC Letter dated 10/31/80 III.A.l.2.2 Complete Lack SPDS only III.A.l.2.3 Complete Lack SPDS only

{

III.A.2.1 Complete NRC Letter dated 11/01/88

)

III.A.2.2 Complete NRC Letter datea 05/04/87 III.D.l.l.1 Complete NRC Letter dated 10/31/80 1II.D.1.1.2 Complete TVA Letter dated 12/23/80 III.D.3.3.1 Complete NRC Letter dated 02/22/82 III.D.3.3.2 Complete NRC Letter dated 02/?2/82 III.D.3.4.1 Complete NRC Letter dated 08/30/82 III.D.3.4.2 N/A Modifications not required III.D.3.4.3 N/A Modifications not required MPA-F008 Complete TVA Letter dated 12/30/86 MPA-F063 Complete Lack SPDS only MPA-F064 Complete NRC Letter dated 05/04/87 MPA-F065 Complete NRC Letter dated 05/04/87 MPA-F071 Open Refuel Cycle 8-Design MPA-8072 Complete Lack II.K.3.27 only MPA-B083 Complete Lack PASS only 67.4.1 N/A PWR only Currently in refuel cycle 58, next outage will be refuel cycle 6.

0921y