ML20245A490

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/89-09 & 50-499/89-09 on 890327-31.No Violations or Deviations Noted
ML20245A490
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20245A493 List:
References
NUDOCS 8904250235
Download: ML20245A490 (3)


See also: IR 05000498/1989009

Text

--

.

.

.

.

.

In Reply Refer To:

A g ; 7 jggg

Dockets:

50-498/89-09

50-499/89-09

Houston Lighting & Power Company

ATTN:

J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

,

Gentlemen:

'

This refers to the inspection conducted by. Messrs. H. F. Bundy and R. V. Azua

of this office during the period March 27-31, 1989, of activities authorized by

NRC Operating License NPF-78 for South Texas Project, Unit 2, and to the

discussion of our findings with Mr. W. H. Kinsey and other members of your

i

staff at the conclusion of the inspection.

Areas examitied during the inspection included precriticality data review and

i

startuo test results evaluation. Within these areas, the inspection consisted

of sekctive examination of procedures and representative records, interviews

with personnel, and observations by the NRC inspectors. The inspection

findings are docu.nented in the e niosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

,

DE & %O

b b. W f

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-498/89-09

50-499/89-09

cc:

(see next page)

'

b

fpt/JLhp;rR jfegdh D:DRP k

RVAba/

RIV:TPS

TPS

C:TPS

ilhoan

LJCallan

HFBundy;ap

WCSei

e

/ /89

(/tL/89

Y /tr/89

P }/p/89

y/q/89

s

[

DO

PNV

J

.I

_ - - - - _ - - _ - _ _ - - _ _ - _ _ _ - - -

~

(.

.

l

.

.

.

.

Houston' Lighting & Power Company

-2-

i

cc w/ enclosure *

i

Houston Lighting & Power' Company

ATTN:

M..A. McBurnett, Manager

Operations Support Licensing

i

P.O. Box 289

)

Wadsworth, Texas- 77483

Houston Lighting & Power' Company

' ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box.289

Wadsworth, Texas 77483

i

l-

Houston Lighting'& Power Company

';

ATTN:

J. T. Westermeier, General Manager

i'

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483

Central Power'& Light Company

ATTN:

R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City of Austin Electric Utility

ATTN:

R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

Newman & Holtzinger, P.C.

ATTN:

J. R. Newman, Esquire

1615 L Street, N.W.

-i

Washington, D.C.

20036

'

l

Houston Lighting & Power Company

ATTN:

S. L. Rosen

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

.R. W. Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

.

City Public Service Board

ATTN:

R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

i

- - - . ___

_ _ _

--

.

.

j

.

..

1

.

' Houston Lighting & Power Company

-3-

Houston Lighting & Power Company

ATTN: Licensing Representative

Suite 610

,

Three Metro Center

)

<

Bethesda, Maryland 20814

a

Texas Radiation Control Program Director

bec w/ enclosure :

,

bec to DMB (IE01)

!

bec distrib. by RIV:

  • DRP.
  • RRI
  • SectionChief-(DRP/D)
  • DRS
  • MIS System
  • RPB-DRSS

Lisa Shea, RM/ALF

  • RIV File

R. Bachmann. 0GC

.. RSTS Operator

. *

  • G. Dick, NRR Project Manager (MS:

13-D-18)

  • Project Engineer, DRP/D
  • R. D. Martin
  • R. V..Azua
  • W. C. Seidle

.i

  • H. F. Bundy

J

i

  • W/766

1

j

i

I

]

l

!

i

H

m