ML20245A437

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Inservice Insp Rept for Unit 1 Catawba 1988 Refueling Outage 3
ML20245A437
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 04/11/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245A439 List:
References
NUDOCS 8904250200
Download: ML20245A437 (1)


Text

.

-m s /J,

n' I

Duxe Povren QOMPANY -

a m

e.o. nox aanse I;

<J t

'HALH. TUCKER _.

CHARLOTTE, N.O. 28242 trazenowe-l '

e-usear somwr.

(704) 073-4531

('

nw nm emanamon s

. April 11, 1989

i n

l n.

. Document Control Desk l

U. S. Nuclear Regulatory Commission 1

Washington, D.' C.

20555

' Subj ect : Catawba Nuclear Station, Unit 1 Docket'No. 50-413 End-of Cycle 3 Inservice Inspection Report Gentlemen:

Pursuant to 10 CFR 50.55 (a) (q) and Catawba Nuclear Station Technical Specification.4.0.5, please find attached the Catawba Unit 1 end of cycle 3 Inservice Inspection Report.'The Catawba Unit 1 end of cycle 3 refueling outage.was completed on February 6, 1989. This Inservice Inspection was performed in accordance with Section' XI of the ASME Boiler and Pressure -

Vessel Code and applicable addenda.

'Very truly yours,

/

H. B eker'

. Attachment i

JGT/3/U1C3ISI xc:

Mr. S. D. Ebneter, Regional Administrator i

U. S. Nuclear Regulatory Commission Region II' 101 Marietta Street, NW, Suite 2900

' Atlanta, Georgia 30323 Mr. W. T.' Orders NRC Resident Inspector Catawba Nuclear Station f

' I i

8904250200 890411 h

PDR ADOCK 05000413 PDC g

a