MAY 25 ' 1939
l'
Docket.Nos.: 50-327'and 50-328
)
l
License Nos.: DPR-77 and DPR-79
Mr. Oliver D. Kingsley, Jr.
Senior Vice President, Nuclear Power
Tennessee Valley Authority
6N 38A Lookout Place
- '
1101 Market Square'
Chattanooga, TN 37402-2801-
Dear Mr. Kingsley:
.
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/89-12 AND 50-328/89-12
This refers to the Nuclear Regulatory Commission- (NRC) routine x monthly
inspection conducted by K. 'Jenison from April 6,1989 thru May 5,1989. At'the
conclusion of the inspection, the findings were discussed with those members of
_.
'
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. These areas
included operational safety verification, refueling activities, maintenance and
surveillance activities.
Within these areas, the inspection consisted of
selective examinations . of procedures and representative - records,_ interviews
with personnel, and observation of activities in progress.
The enclosed inspection report identifies activities that appeared to violate
l
NRC requirements but are not cited; therefore, no response is required.
Your attention is invited to the three Unresolved Items identified' in the
inspection report. These URIs pertain to the method of measuring; core thermal
power, the justification for stopping Boron Injection Tank recirculation while
in Mode 3, and the adequacy of the post maintenance testing performed' on the
auxiliary feedwater pump. following packing replacement.
These items will be
addressed during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
j
Title 10, Code of Federal Regulations, a copy of this letter, its enclosures,.
l
and any reply will be placed in the NRC's Public Document Room.
j
)
!
<
4
$
I
8906210177 890525
,
ADOCK 05000327
PNV
y
l
O
,
I l
Isot
l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _
- - - _ - - - .
-
__
_ _ . _ _ _ _
.-
_
i
.
Mr. Oliver J. Kingsley, Jr.
2
Should you have any questions concerning this letter, please contact us. .
Sincerely,
D
&
Bruce A. Wilson, As;istant Director
for Inspection Programs
TVA Projects Division
Office of Nuclear Reactor Regulation
Enclosures:
l
NRC Inspection Report
cc w/encis:
)
F. L. Moreadith, Vice President,
i
'
Nuclear Engineering
J. T. LaPoint, Site Director
Sequoyah Nuclear Plant
M. J. Ray, Acting Director
Nuclear Safety and Licensing
,
M. J. Burzynski, Site Licensing
Manager
j
TVA Representative, Rockville
J
Office
General Counsel, TVA
State of Tennessee
bec w/encis:
D. M. Crutchfield, NRR
B. D. Liaw, NRR
R. C. Pierson, NRR
S. C. Black, NRR
J. B. Brady, NRR/RII
B. B. Desai, NRR/RII
J. Rutberg, OGC
,
NRC Resident Inspector
NRC Document Control Desk
l
l
.4 R/RII
NRR/RII
'
,
l
M
J_jf}dy
l
BDesai:tj
Bra
05/.tJ /89
05/23/89
. _ _ _ _ _ _ - _ _ _ -