Forwards Insp Repts 50-327/89-12 & 50-328/89-12 on 890406-0505.Violations Noted But Will Not Be Cited. Unresolved Items Noted Re Measuring Core Thermal Power & Stopping Boron Injection Tank Recirculation in Mode 3
ML20245A262
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/25/1989
From: Wilson B
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20245A264 List:
References
NUDOCS 8906210177
Download: ML20245A262 (2)


See also: IR 05000327/1989012

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ .

_

_

_

,

.. .

J )

i

i

' -, ' f a

-(p

,

,

j

-

L

MAY 25 ' 1939

l'

Docket.Nos.: 50-327'and 50-328

)

l

License Nos.: DPR-77 and DPR-79

Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power

Tennessee Valley Authority

6N 38A Lookout Place

'

1101 Market Square'

Chattanooga, TN 37402-2801-

Dear Mr. Kingsley:

.

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/89-12 AND 50-328/89-12

This refers to the Nuclear Regulatory Commission- (NRC) routine x monthly

inspection conducted by K. 'Jenison from April 6,1989 thru May 5,1989. At'the

conclusion of the inspection, the findings were discussed with those members of

_.

'

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. These areas

included operational safety verification, refueling activities, maintenance and

surveillance activities.

Within these areas, the inspection consisted of

selective examinations . of procedures and representative - records,_ interviews

with personnel, and observation of activities in progress.

The enclosed inspection report identifies activities that appeared to violate

l

NRC requirements but are not cited; therefore, no response is required.

Your attention is invited to the three Unresolved Items identified' in the

inspection report. These URIs pertain to the method of measuring; core thermal

power, the justification for stopping Boron Injection Tank recirculation while

in Mode 3, and the adequacy of the post maintenance testing performed' on the

auxiliary feedwater pump. following packing replacement.

These items will be

addressed during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

j

Title 10, Code of Federal Regulations, a copy of this letter, its enclosures,.

l

and any reply will be placed in the NRC's Public Document Room.

j

)

!

<

4

$

I

8906210177 890525

,

PDR

ADOCK 05000327

PNV

y

l

O

,

I l

Isot

l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _

- - - _ - - - .

-

__

_ _ . _ _ _ _

.-

_

i

.

Mr. Oliver J. Kingsley, Jr.

2

Should you have any questions concerning this letter, please contact us. .

Sincerely,

D

&

JW

Bruce A. Wilson, As;istant Director

for Inspection Programs

TVA Projects Division

Office of Nuclear Reactor Regulation

Enclosures:

l

NRC Inspection Report

cc w/encis:

)

F. L. Moreadith, Vice President,

i

'

Nuclear Engineering

J. T. LaPoint, Site Director

Sequoyah Nuclear Plant

M. J. Ray, Acting Director

Nuclear Safety and Licensing

,

M. J. Burzynski, Site Licensing

Manager

j

TVA Representative, Rockville

J

Office

General Counsel, TVA

State of Tennessee

bec w/encis:

D. M. Crutchfield, NRR

B. D. Liaw, NRR

R. C. Pierson, NRR

S. C. Black, NRR

J. B. Brady, NRR/RII

B. B. Desai, NRR/RII

J. Rutberg, OGC

,

NRC Resident Inspector

NRC Document Control Desk

l

l

.4 R/RII

NRR/RII

'

,

l

M

J_jf}dy

l

BDesai:tj

Bra

05/.tJ /89

05/23/89

. _ _ _ _ _ _ - _ _ _ -