CCN-89-14092~

]

a "e '

% PHILADELPHIA ELECTRIC COMPANY 5

PEACli BOTIDM KIDMIC POWER STArlON R. D.1. Box 208 W4 f 1@* Delta, Itnnsylvania 17314 raen surnus-Tur rowra or ascruewca (717) 456-7014 D. M. Smith Vice President '

June 15, 1989 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC. 20555

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating _ Report Gentlemen:

l Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of May,1989 forwarded pursuant to Technical Specification 6.9.1.d under the  ;

guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, y Oh S l Ms DMS/MJB: cmc Enclosure ec: J.T. Boettger, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania T.P. Johnson, USNRC Senior Resident Inspector T.E. Magette, State of Maryland W.T. Russell., Administrator, Region I, USNRC H.C. Schwemm. Atlantic Electric J. Urban, Delmarva Power INPO Records Center j

l l

i Y? i R DC [ M R

l I

\

I I

I CGIS89.NRC i

-l

. NRC Monthly Operations Summary Peach Bottom Atomic Power Station May 1989 UNIT 2 The unit began the month in the Start-up mode and engaged in power ascension activities throughout the month.

A number of equipment problems were encountered and corrected. A bad switch caused a SCRAM. There were no upsets caused by personnel errors. The unit ended the month in the Run mode, at 33% power. I l

UNIT 3 l The unit remained shut down during the report period with modificat'.on activities in progress. l 4

1 l

1 l

l l

1 l

l l

CC0589.NRC j

Docket No. 50-277 Attachment to Monthly Operating Report for May 1989 UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

(1) Reload 7 completed (2) Reload 8 scheduled for January 6,1991

3. Scheduled date for restart following refueling:

(1) Completion of Power Ascension and Operator training targeted for mid-August 1989.

(2) Restart following refueling scheduled for April 6,1991 4 Will refueling or resumption of operation therefore require a technical specification change or other )

license amendment?

No.

If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 1734 Fuct Assemblies,58 Fuct Rods l

l l

CCOS89.NRC

i Docket No. 50-277 Attachment to i Monthly Operating j Report for May 1989 Page 2 .

i UNIT 2 REFUELING INFORM ATION (Continued)  !

i

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage I I

capacity that has been requested or is planned, in number of fuel assemblies-j The spent fuel pool storage capacity has been relicensc.2 for 3819 fuel assemblics. (

1

9. The projected date of the last refueling that can be discharged te the spent fuel pool assuming the l

present capacity:

September 2003 without full core offload capability.

September 1997 with full core offload cap >5111ty.

i I

l

(

l I

J l

1 1

)

!I CC0589.NRC i

. u

. , 1 Docket No. 50-278 Attachment to .

Monthly Operating

- Report for May 1989 ' -

.i UNIT 3 REFUELING INFORMATION

1. Name of facility:

]

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

(1) Reload 7 in progress (2) Reload 8 scheduled for August 31,1991 l 3. Scheduled date for restart following refueling (1) Restart following refueling scheduled for September 30,1989 (2) Restart following refueling scheduled for October 29,1991

]

4. Will refueling or resumption of operation thereafter require a technical specification change or other .

license amendment? I Yes. .

1 If answer is yes, what, in general, will these be? '!

(1) Cycle 8 Reload Amendment (2) Minimum SRM Count Amendment

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) Cycle 8 Reload License Amendment submitted July 1988 l

(2) Minimum SRM Count Amendment submitted December 1988

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel des;3n, new operating procedures:

None expected, i l

i i

CC0589.NRC i

j l

i

~

.l Docket No. 50-278 Attachment to Monthly Operating ' ]

Report for May 1989 Ll Page 2 UNIT 3 REFUELING INFORMATION (Continued) =

7. The number of fuel assemblics (a) in the core and (b) in~the spent fuel storage pooh j 1

(a) Core - 0 Fuel Assemblies (764 assemblies offloaded during outage)

(b) Fuel Pool - 2260 Fuel Assemblies,6 Fuel Rods .

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage I capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 hel assemblics. This -

modification began on February 20,1987. The completion date for this modification has been rescheduled for the first quarter of 1990 to accommodate the Unit 3 outage.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

With the current fuel pool capacity (prior to the completion of the fuel pool reracking

)

modification):  !

September 1996 without full core offload capability, _

End of next cycle with full core offload capability (est. January 1991).

With increased fuel pool capacity (subsequent to the completion of the fuct pool rcracking modification):

September 2004 without full core offload capability.

September 1998 with full core offload capability.

l

.1 I

J CC0589.NRC i

i j

____ ________J

AVERAGE DAILY UNIT POWER LEVEL 00CKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 OATE JUNE 15, 1089 COMPANY PHILADELPHIA ELECTRIC COMPANY H. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321- q MONTH HAY 1989 i

l OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET)  !

l 1 0 17 0 l l

1 2 0 18 0 1

3 0 19 0 l 4 0 20 0 5 0 21 0 6 0 22 51

~

7 0 23 0 8 0 24 15 9 0 25 130 j 10 0 26 149 11 0 27 151 12 0 28 162 13 0 29 207 14 0 30 220 l

15 0 31 230 l

16 0 l

l l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 OATE JUNE 15, 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 MONTH MAY 1989 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0

~

7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

I OPERATING DATA REPORT

_i DOCKET NO. 50 - 277 l l

DATE JUNE 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON ,

SUPERVISOR '

REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION l TELEPHONE (717) 457-7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES: UNIT 2 IN POWER ASCENSION
2. REPORTING PERIOD: MAY, 1989 AS OF APRIL 26, 1989
3. LICENSED THERMAL POWER (MWT): 3293
4. NAMEPLATE RATING (GROSS HWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. HAXIMUM DEPENDABLE CAPACITY (NET MWE): 1051
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. P01ER LEVEL TO VHICH RESTRICTED. IF ANY (NET MVE):
10. REsSONS FOR RESTRICTIONS, IF ANY: ,,

THIS MONTH YR-TO-0 ATE CUMULATIVE

11. HOURS IN REPORTING FERIOD 744 3,623 130,679
12. NUMBER OF HOURS REACTOR WAS CRITICAL 633.5 638.9 74,835.7
13. REACTOR RESERVE SHUT 00WN HOURS 0.0 0.0 0. 0 -

l

14. HOURS GENERATOR ON-LINE 180.9 180.9 72,047.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 163,368 163,368 212.974,113  !
17. GROSS ELECTRICAL ENERGY GENERATED (HWH) 34,470 34,470 70,C53,700

]

18. NET ELECTRICAL ENERGY GENERATED (MWH) 27,321 9,193 67,001,309 I

PAGE 1 0F 2 l l

l

.. ]

i I

OPERATINGDATAREPORT(CONTINUED) DOCKET NO. 50 - 277 DATE JUNE 15, 1989 l l

l THIS HONTH YR-TO-DATE CUMULATIVE is. UNIT SERVICE FACTOR 24.3 5.0 55.1

20. UNIT AVAILABILITY FACTOR 24.3 5.0 55.1 ,
)

'l

21. UNIT CAPACITY FACTOR (USING MDC NET) 3.5 0.2 48.8
22. UNIT CAPACITY FACTOR (USING DER NET) 3.4 0.2 48.1
23. UNIT FORCED OUTAGE RATE 20.3 20.3 14,7
24. SHUTDOWNS SCMEDULE. TER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING OUTAGE

25. IF SHUT 00WN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 x

i PAGE 2 0F 2 {

i i'

l l

I l

l

- _ _ _ _ _ _ _ - . _ _ _ _ . _ _ _ _ . ]

e, .

i i

OPERAT]NG DATA REPORT i DOCKET NO. 50 - 278 )

DATE JUNE 15, 1989 l COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 1

OPERATING STATUS l NOTES: UNIT 3 REMAINED SHUT DOVN

1. UNIT NAME: PEACH BOTTOM UNIT 3
2. REPORTING PER100: MAY, 1989 VITH H0DIFICATION
3. LICENSED THERMAL POWER (MWT): 3293 ACTIVITIES IN PROGRESS.

l

4. NAMEPLATE RATING (GROSS MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): '1065 1
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. HAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REf0RT, GIVE REASONS: 1 l

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): j
10. REASONS FOR RESTRICTIONS, IF ANY: , ,

i 1

THl! MONTH YR-TO-0 ATE CUMULATIVE .

11. HOURS IN REPORTING PERIOD 744 3,623 126,575
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 76,357.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 0.0 73,929.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 s
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 215,278,901
17. GROSS ELECTRICAL ENERGY GENERATED (W'H) 0 0 70,611,432
18. NET ELECTRICAL ENERGY GENERATED (MVH) -5,168 *

-23,296 67.629,653 PAGE 1 0F 2 Negative value reported for consistency with Federal Engergy Regulatory Commission Reports.

2 ,

OPhRATINGDATAREPORT(CONTINUED) DOCKET NO. 50 - 278 I

DATE JUNE 15. 1989 1 THIS MONTH YR-TO-DATE CUMULATIVE I 1

19. UNIT SERVICE FACTOR 0.0 0.0 58.4 1
20. UNIT AVAILABILITY FACTOR 0.0 0.0 58.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 51.6

.1 22.UNITCAPACITYFACTOR(USINGDERNET) 0.0 0.0 50.2

23. UNIT FORCED OUTAGE RATE 0.0 0.0 -13.3
24. SHUTDOWNS !,CHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): I INDETERMINATE UNTIL NRC ORDER IS SATISFIED. .l
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

, 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED -l INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 k

PAGE 2 0F 2 i

I I

. _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ .A

l l

l UNIT SHUT 00VNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 l

DATE JUNE 15, 1989 1 l

REPORT MONTH MAY, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO I NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 7 890501 S 517.1 0 1 N/A ZZ IZZZZZ NRC REQUIRED POWER ASCENSION AND 1 OPERATOR TESTING PROGRAM 1 890522 F 046.0 A 1 N/A MB HTEXCH RECOMBINER CONDENSER LEAK j 563.1 n

(1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA l B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE i C - REFUELING 3 - AUTOMATIC SCRAM. EVENTREPORT(LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) j E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN) 1 H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE I 1

i s., c  !

1 i

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 l 1

DATE JUNE 15, 1989 REPORT MONTH MAY, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY j 1

M. J. BARON 1 SUPERVISOR {

REPORTS GROUP PEACM BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 7 890501 S 744.0 C 1 N/A RC FUELXX CONTINUATION OF REFUEL AND PIPE REPLACEMENT I ACTIVITY. l l

744.0

~

{

(1) (2) (3) (4) f F - FORCED REASON METHOD EXHIBli G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) l' 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0151)

E - OPERATOR TRAIN!NG + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBli ! - SAME SOURCE i

j

__--_ D