. NRC Monthly Operations Summary h . Peach Bottom Atomic Power Station .

March,1989 UNIT 2 i The unit remairied shut down during the report period with modification and restart activities in progress.. /

\

UNIT 3 1 1

~

l The unit remained shut down during the report period with modifications and restart activities in progress.

1 l

I i

45 a

.(.! I CG389.NRC b

v

_ = _ _ _ _ _ _ - _ _ . .. _ _

s .' . ' , . . I

e. .

. Docket No.50-277,

. - Attachment to .

I Monthly Operating Report for March,1989 j q

1 UNIT 2 REFUELING INFORMATION

1. Name of facility:

- Peach Bottom Unit 2 1

2. Scheduled date for next r: fueling shutdown:

(1) Reload 7 completed j I-(2) - Reload 8 scheduled for January 4,1991 I

3. Scheduled date for restart following refueling:

(1) Restart following NRC Shutdown Order targeted for late April,1989.

1 (2) Restart following refueling scheduled for April 20,1991 i

1

4. Will refueling or resumption of operation therefore require a technical specification change or other i license amendment? 'J Yes If answer is yes, what, in general, will these be?

(1) Electrical Loading Sequence Modification Amendment (2) SRM/IRM Calibration

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) Revision to Electrical Loading Sequence Modification Amendment submitted January 26,1989. Additional supporting information was submitted March 6,1989.

I i

l l

CQ389.NRC l

I Docket No. 50-277 l' Attachment to Monthly Operating Report for March,1989 Page 2 UNIT 2 REFUELING INFORM ATION (Continued)

J

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

I Refueling completed. '

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies j (b) Fuel Pool 1734 Fuel Assemblics,58 Fuel Rods

)

1

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage l capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.

1

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the I

present capacity:

{

1 Septeraber,2003 without full core offload capability, i September,1997 with full core offload capability.

3 1

l CC0389.NRC L__ _ _____ _. _ _ _ _ .__ _ _ _ _ _ _ _ _ _ _ - _ _ - - _ _ - _ _ - _ _ _ _ - _

t. .- ,

. Docket No. 50-278

. Attachment to

. Monthly Operating Report for March,1989 UEIT 3 REFUELING INFORMATION'

/

1. Name of facility:

Peach Bottom Unit 3. -

s .,

2. Scheduled date for next refueling shutdown:

-(1) Reload 7 in progress (Major Pipe Replacement Outage)

(2) Reload 8 scheduled for August 30,1991 t

3. Scheduled date for restart following refueling l (1) Restart following refueling scheduled for September 30,1989 I

(2) Restart following refueling scheduled for December 14,1991

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

(1) Primary System Pipe Replacement Modification Amendment (2) Cycle 8 Reload Amendment

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) Primary System Pipe Replacement Amendment submitted March 21,1988 (2) Cycle 8 Reload License Amendment submitted July 7,1988 CC0389.NRC

_.. _.- __.a.-_._-__________u_. 2-_.-_-__ __m

.]

1 Docket No. 50-278 Attachment to Monthly Operating Report for March,1989 Page 2 UNIT 3 REFUELING INFORMATION (Continued) . j l

i l 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, l unreviewed design or performance analysis methods, significant changes in fuel design, new operating  !

procedures:

None expected.

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

Core - 0 Fuel Assemblics (764 assemblies ofiloaded during outage) i (a)  !

(b) Fuel Pool- 2260 Fuel Assemblies,6 Fuel Rods i

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage -

]

capacity that has been requested or is planned, in number of fuel assemblies: q The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on February 20,1987. The completion date for this modification has been rescheduled for the first quarter of 1990 to accommodate the Unit 3 pipe replacement outage.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity: ]

With the current fuel pool capacity (prior to the completion of the fuel pool reracking modification):

September,1996 without full core offload capability.

End of next cycle with full core offload capability (est. January,1991).

With increased fuel pool capacity (subsequent to the completion of the fuel pool reracking modification):

September,2004 without full core offload capability. .

September,1998 with full core offload capability.

CC0389.NRC

i l

l

______________J

i

- v.

AVERAGE DAILY UNIT POVER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE APRIL 15, 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON j

$UPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 MONTH MARCH 1989 l j

i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 i 3 0 19 0 1

4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 j 8 0 24 0 9 0 25 0 i 10 0 26 0 11 0 27 0 q

12 0 28 0 )

1 13 0 29 0 14 0 30 0 15 0 31 0 j l

16 0  !

I l

l l

l l

l l

c_______________

7 v t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE APRIL 15, 1989 COMPANY PH',LADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT. 3321 MONTH MARCH 1989 DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 l l

l l

I l

l

}

OPERATING DATA REPDRT 7 .

DOCKET NO. 50 - 277 DATE APRIL 15,-1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISDR REPORTS GROUP PEACH BOTTDM ATOMIC PDWER STATION TELEPHONE (717) 457-7014 EXT. 3321 .....

OPERATING STATUS j

................ .......................... ....-- =

1. UNIT NAME: PEACH BOTTDM UNIT 2 NOTES: UNIT 2 REMAINED SHUTDDWN 2.REPORTINGPfR50b$ MARCH 1989 UNDER NRC ORDER WITH EXTENDED 3.LICENSEDTHERMALPOWER(HWT): 3293 REFUEL ACTIVITY CONTINUING.
4. NAMEPLATE RATING (GROSS MWE): 1152 5.DESIGNELECTRICALRATING(NETMWE): 1065 -
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM OEPENDABLE CAPACITY (NET MWE): 1051
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

1 THIS MONTH YR-TO-DATE CUMULATIVE j i

11. HOURS IN REPORTING PERIOD 744 2.160 129,216  ;
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 74,196.8 l
13. REACTOR RESERVE SHUTDOWN HOURS ' O.0 0.0 0.0
14. HCURS GENERATOR ON-LINE 0.0 0.0 71,866.8 .

............ ............ ...= - -=-  ;

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 - 0.0 i 1 ............ ............ ............
16. GROSS THERMAL ENERGY GENERATED '(MWH) 0 0 212,810,745 17.GROSSELECTRICALENERGYGENERATED(MWH) 0 0 70,019,230

............ .=___- - .. ............

  • -4,595
  • 13,415 66,978,701
18. NET ELECTRICAL ENERGY GENERATED (MWH)

PAGE 1 0F 2 i

.-. - . - . - _ __w_____,__a__________ _

OPERATINGDATAREPORT(CONTINUED)~ CDCKET NO. 50 - 277 DATE APRIL 15, 1989 THIS HONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 O.0 55.6
20. UNIT AVAILABILITY FACTOR 0.0 0.0 55.6 21.UNITCAPACITYFACTOR(USINGMDCNET) 0.0 0.0 49.3
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 48.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 14.6 24, SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING OUTAGE 1

i 25.. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 PAGE 2 0F 2

s- -

3 i

OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE APRIL 15, 1989

............................. j i

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR 1 i

REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION 1 TELEPHONE (717) 457-7014 EXT. 3321 (

......- .................. l OPERATING STATUS

................ ......................................... l,

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES: UNIT 3 REMAINED SHUTDOWN l

.................................. 1

2. REPORTING PER100: MARCH, 1989 UNDER NRC ORDER WITH REFUEL L)I
3. LICENSED THERh%1 POWER (MWT):

3293 AND EXTENDED PIPE REPLACEMENT f1

4. NAMEPLATE RATING (GROSS MWE): 1152 ACTIVITIES IN PROGRESS. I

............... 3

5. DESIGN ELECTRICAL RATING (NET MWE): 1065 l 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098 I

l 7. MAXIMUM DEPENDABLC CAPACITY (NET MWE): 1035 1

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITE"S NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

1 1

1 THIS MONTH Yk-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 2,160 125,112
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 76,357.4
13. REACTOR RESERVE SHUTOOWN h0VRS 0.J 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 0.0 73,929.3
15. UNIT RESERVE SHUTOOWN HOURS 0.0 0.0 0.0 l
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 215.278,901
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 70,611.432
18. NET ELECTRICAL ENERGY GENERATED (MWH) -4,595 -13.415 67,639,740 PAGE 1 0F 2 l

l u___.____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

C l

l 1

OPERATING DATA REPORT (CONTINUED) . DOCKET ND. 50 - 278 DATE APRIL 15, 1989 I

THIS HONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 59.1 -
20. UNIT AVAILABILITY FACTOR 0.0 0.0 59.1 21.UNITCAPACITYFACTOR(USINGMDCNET) 0.0 0.0 52.2
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 50.8-
23. UNIT FORCED OUTAGE RATE 0.0 0.0 13.3
24. SHUTDOVNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): ,

INDETERMINATE UNTil NRC ORDER 15 SATISFIED.

I:

25. IF SHUTDOWN AT END OF REPORT PERIOD, EST! HATED DATE OF STARTUP:

26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 ,

INITIAL ELECTRICITY .09/01/74 COMMERCIAL OPERATION 12/23/74 l 1 l

l 1 1

PAGE 2 0F 2 I

- - ,i UNIT SHUTDOV"5 AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE APRIL 15, 1989 REPORT MONTH MARCH, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 457-7014 EXT 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING 00WN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 7 890301 5 744,0 0 1 N/A ZZ ZZZZZZ NRC REQUIRED SHUTDOWN 744,0 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G . INSTRUCTIONS S - SCHEDULED A-EQUIPMEhTFAILURE(EXPLAIN) 1 . MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 . MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C . REFUELING 3 . AUTOMATIC SCRAM. EVENTREPORT(LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPL AIN) EXHIBIT I - SAME SOURCE

' ~ .

. .....~

  • #' ..f 1

s

'i

, UNIT SHUTD0VNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 l

UNIT NAME PEACH BOTTOM UNIT 3 DATE........

APRIL 15,'.1989 l

REPORT MONTH MARCH, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY. 'j

)

M. J. BARON SUPERVISOR l REPORTS GROUP.

PEACH BOTTOM ATOMIC PJWER STATION TELEPHONE (717)457-7014 EXT.3321 METH00 0F LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT f (4) (5) PREVENT RECURRENCE-7 890301 S 744.0 C 1 N/A RC FUELXX CONTINUATION OF REFUEL AND PIPE REPLACEMENT ACTIVITY.

744.0 (1) (2) (3). (4) l "

l F - FORCED REASON METHOD . EXHIBIT G - INSTRUCTIONS 3 S - SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN) 1 - MANUAL. FOR PREPARATION OF DATA- )

B . MAINTENANCE OR TEST ,2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING - 3 - AUTOMATIC SCRAM.~ EVENT REPDRT (LER)=

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)- ' FILE (NUREG-0161). j E - DPERATOR TRAINING + LICENSE EXAMINATION  ;

F - ADMINISTRATIVE ,

(5) l G - OPERATIONAL ERROR (EXPLAIN)

H-OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE

\

l  !

l l

l a

4 i

l

, CCNS89-14052

)

.. ,4 l 4

e t. PHILADELPHIA ELECTRIC COMPANY k PEACH BCTTTOM ATOMIC POWER STATION '

R. D.1, Box 208

$1m pl# Delta, Pennsylvania 17314 raau mo Tou-Tur rowan or rxuurmca . (717)4567014 D. M. Smith '

I Vice President April 13, 1989 Docket Nos. 50-277 50-278 i

U.S. Nuclear Regulatory Commission Document Control Desk l Washington, DC 20555  ;

1

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of March,1989 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, DMS/MJB: cmc Attachment ec: W.T. Russell, Administrator, Region I, USNRC j T.P. Johnson, USNRC Senior Resident Inspector 1 S.P. Mangi, Dept. of Envir. Resources .I W.H. Lovelace, NRC (2 copies)

R.E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INPO Records Center I 91,  ;