ML20245A077

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-461/89-08 on 890127-0316 & Notice of Violation
ML20245A077
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/12/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20245A079 List:
References
NUDOCS 8904250039
Download: ML20245A077 (2)


See also: IR 05000461/1989008

Text

-_---_-

+

.

  • p u?vg UNITED STATES

f*g NUCLEAR REGULATORY COMMISSION

'S REGION lli

~f 799 ROOSEVELT RO AD

[j $ If

.

  • GLEN ELLYN ILUNOIS 501 M

.....

fAPR 12 i989

Docket N'o. 50-46'1

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This. refers to the routine safety inspection conducted by Messrs. P. L. Hiland,

S. P. Ray,'and R. B. Landsman of this office on January 27, 1989, through

.

March 16, 1989, of activities at Clinton Power Station authorized by NRC ,

!

Operating License No. NPF-62, and to the' discussion of our findings with

Pr. D. P. Hall and others of your staff'at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within.Shese areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your' activities appeared to be in violation

of NRC requirements as described in the enclosed Notice. A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

.

Public Document Room.

~

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

f(*g

Richard C. Knop, Chief

.

Reactor Projects Branch 3

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-461/89008(DRP)

See Attached Distribution

/p

8904250039 890412

PDR ADOCK05000461g& /1 l

G PNV gll

L____-_-________

_-_

l

L -

l3 *

1

Illinois Power Company 2 1NPR 121989

Distribution

cc w/ enclosure:

D. P. Hall, Vice President

J. S. Perry, Assistant

Vice President

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

par;DCD/DCBl.(RIDS)T?

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chiet, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblatt, Governor's

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers

l

l

.

. _ - _ _ - _ _ _ - _ - _